City Region Development Project: Banani Integrated Traffic Management Subproject - Updated Initial Environmental Examination

Date: February 2014
Country:
Subject:
Document Type: Environmental Assessment and Measures / Initial Environmental Examination
Project Number: 39298-013

Download Document



Description

This initial environmental examination is an update of a previous version prepared during the project preparation phase for the City Region Development Project in Bangladesh. It describes the environmental condition of the Banani Integrated Traffic Management subproject and includes potential impacts, the formulation of mitigation measures, and the preparation of institutional requirements and environmental monitoring for the project. 

Environmental impacts of the proposed integrated traffic management subproject have been assessed with the conclusion that, if mitigation and monitoring measures are implemented, there should be no significant negative environmental impact as a result of location, design, construction or operation of the subproject. Improvements in quality of life and public welfare will result once the scheme is in operation.