Detailed Engineering Study for the Upper Seti Hydropower Project

Date: June 2010
Country:
Subject:
Document Type: Design and Monitoring Frameworks
Project Number: 43281-022

Download Document



Description

Quantified time bound targets, and measurable indicators for Detailed Engineering Study for the Upper Seti Hydropower Project in Nepal. Identifies key risks and assumptions used to monitor and evaluate project performance. Updated on the site after OGC and OSEC clearance as of 9 August 2010.