Developing the Power System Master Plan for Bihar: Final Report (Transmission Expansion Planning up to Appendix 7 Total Cost - Tables B-1 to B-7)

Consultants' Reports | October 2011

Consultant’s reports describe activities by a consultant or group of consultants related to preparing a technical assistance project.

This document dated October 2011 is provided for the ADB project 42054-012 in India.