Dili Urban Water Supply Sector Project: Zone 10 (Cristo-Rei)

Date: October 2013
Country:
Subject:
Document Type: Environmental Assessment and Measures / Initial Environmental Examination
Project Number: 38189-022

Download Document



Description

This initial environmental examination describes the environmental condition of the proposed rehabilitation of the water distribution system for Zone 10 (Cristo-Rei) under the Dili Urban Water Supply Sector Project in Timor-Leste, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring for the project.