Fifth and Sixth Power Projects (Loans 670/708-NEP[SF])

Date: December 1999
Country:
Subject:
Document Type: Audit and Performance Evaluation Reports / Project/Program Performance Audit Reports

Download Document



Description

This report evaluates the performance of the Fifth and Sixth Power Projects designed to meet increased demand for electricity, improve quality and reliability of power supply, reduce energy losses and reduce oil imports so as to support economic growth and improve the standard of living particularly in the rural areas of Nepal. IED overall assessment: Successful