Hydro and Wind Power Development Project: 75 MW Wind Farm Project in Chilarewadi, Maharashtra

Initial Environmental Examination | March 2013

Initial environmental examinations describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring.

This document dated March 2013 is provided for the ADB project 46919-014 in India.