Khulna Water Supply Project: Final Report

Date: April 2011
Country:
Subject:
Document Type: Consultant's Reports
Project Number: 42171-012

Download Document



Description

This is the final technical assistance (TA) consultant's report submitted by Pöyry IDP Consult, Inc. for the preparation of the Khulna Water Supply Project in Bangladesh. The report summarizes the activities carried out throughout the course of the TA and organises and presents the results of the work carried out in a format suitable for collation within ADB project reporting framework/s.