Namangan 500 kV Power Transmission Project

Date: June 2012
Country:
Subject:
Document Type: Environmental Assessment and Measures / Initial Environmental Examination
Project Number: 46007-002

Download Document



Description

This initial environmental examination describes the environmental condition including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring for the Namangan 500 kV Power Transmission Project in Uzbekistan.