North-South Power Transmission Enhancement Project

Date: September 2013
Country:
Subject:
Document Type: Environmental Assessment and Measures / Initial Environmental Examination
Project Number: 46392-001

Download Document



Description

This initial environmental examination describes the environmental condition, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring for the North-South Power Transmission Enhancement Project in Afghanistan.