This initial environmental examination describes the environmental condition, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring for the Conversion of 66KV to 132 KV Chak 83/12-L Grid Station along with 132 KV SDT Transmission Line under the proposed tranche 3 of the Power Distribution Enhancement Investment Program in Pakistan.