Power Distribution Enhancement Investment Program - Proposed Tranche 3: Conversion of 66 KV Faqirwali Grid Station to 132 KV

Date: October 2012
Country:
Subject:
Document Type: Environmental Assessment and Measures / Initial Environmental Examination
Project Number: 38456-034

Download Document



Description

This initial environmental examination describes the environmental condition, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring for the Conversion of 66 KV Faqirwali Grid Station to 132 KV along with Transmission Line from Haroonabad to Faqirwali under the proposed tranche 3 of the Power Distribution Enhancement Investment Program in Pakistan.