Power Distribution Enhancement Investment Program - Proposed Tranche 3: Conversion of 66 KV to 132 KV Fort Abbas Grid Station

Date: October 2012
Country:
Subject:
Document Type: Environmental Assessment and Measures / Initial Environmental Examination
Project Number: 38456-034

Download Document



Description

This initial environmental examination describes the environmental condition, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring for the Conversion of 66 KV to 132 KV Fort Abbas Grid Station and Faqirwali to Fortabbas 132KV STD Transmission Line under the proposed tranche 3 of the Power Distribution Enhancement Investment Program in Pakistan.