Proposed North-South Railway Project

Initial Environmental Examination | February 2011

Initial environmental examinations describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring.

This document dated February 2011 is provided for the ADB project 43441-012 in Turkmenistan.