Provincial Solar Power Project: BSE Solar Power Plant at Ayutthaya and Chaiyaphum, Thailand

Date: April 2012
Country:
Subject:
Document Type: Environmental Assessment and Measures / Initial Environmental Examination
Project Number: 45923-014

Download Document



Description

These initial environmental examination reports describe the environmental condition including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring for the BSE Solar Power Plant at Ayutthaya and Chaiyaphum, Thailand under the Provincial Solar Power Project.