- About ADB
- News & Events
- Data & Research
- Publications
-
Focus Areas
-
Sectors
- Agriculture
- Education
- Energy
- Finance
- Health
- Industry and Trade
- Information and Communication Technology
- Public Sector Management
- Social Protection
- Transport
- Water
-
- Projects
-
Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
- South Asia Subregional Economic Cooperation (SASEC)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
Provincial Solar Power Project: BSE Solar Power Plant at Ayutthaya and Chaiyaphum, Thailand
| Date: | April 2012 |
| Country: | |
| Subject: | |
| Document Type: | Environmental Assessment and Measures / Initial Environmental Examination |
| Project Number: | 45923-014 |
Description
These initial environmental examination reports describe the environmental condition including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring for the BSE Solar Power Plant at Ayutthaya and Chaiyaphum, Thailand under the Provincial Solar Power Project.