- About ADB
- News & Events
- Data & Research
- Publications
-
Focus Areas
-
Sectors
- Agriculture
- Education
- Energy
- Finance
- Health
- Industry and Trade
- Information and Communication Technology
- Public Sector Management
- Social Protection
- Transport
- Water
-
- Projects
-
Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
- South Asia Subregional Economic Cooperation (SASEC)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
Regional Power Transmission Interconnection Project: Addendum to Land Acquisition and Resettlement Plan - Section B
| Date: | September 2012 |
| Country: | |
| Subject: | |
| Document Type: | Resettlement Planning Documents / Resettlement Plans |
| Project Number: | 40043-013 |
Description
This addendum to the land acquisition and resettlement plan (LARP) for Section B of the Regional Power Transmission Interconnection Project in Afghanistan contains an assessment and measures, as well as time-bound actions and budgets, for the project components which have involuntary resettlement.
The impact covered in this addendum were identified only after the LARP for the section B was implemented. These impacts were not detectable during the census and DMS surveys of original section B LARP.
This document covers the impacts and detail compensation costs and mechanisms relative to the construction of transmission line towers in section B in Kunduz Province.