Regional Power Transmission Interconnection Project: Afghanistan-Tajikistan 220 kV Power Transmission Project (Section B - New Kunduz Substation to AP23)

Date: September 2010
Country:
Subject:
Document Type: Resettlement Planning Documents
Project Number: 40043-013

Download Document



Description

This land acquisition and resettlement plan for the Tajikistan to Afghanistan 220 kV Transmission Line Project (Afghanistan-Section B) under the Regional Power Transmission Interconnection Project covers the impacts and detail compensation costs and mechanisms relative to the construction of section B. This section of the line is 36.3km long and mostly crosses uncultivated public land. Some impacts on cultivated land however will occur between km 2.9 and km 22.5, total irrigated land is 19.6km. The Line will not cause impacts on buildings nor resettlement of households.