Projects Documents

Country Document Title Type Cover Date
Tajikistan Initial Environmental Examination
Wholesale Metering and Transmission Reinforcement Project: Initial Environmental Examination
Environmental Assessment and Measures Sep 2014
Tajikistan Initial Environmental Examination
Golovnaya 240 Megawatt Hydropower Plant Rehabilitation Project: Initial Environmental Examination
Environmental Assessment and Measures Sep 2013
Tajikistan Initial Environmental Examination
Improved Maternal and Child Health Through Connectivity: Initial Environmental Examination
Environmental Assessment and Measures Jan 2013
Tajikistan Initial Environmental Examination
Central Asia Regional Economic Cooperation Corridors 3 and 5 Enhancement Project: Initial Environmental Examination
Environmental Assessment and Measures Jun 2013
Tajikistan Initial Environmental Examination
Building Climate Resilience in the Pyanj River Basin: Irrigation and Flood Management (Draft)
Environmental Assessment and Measures Apr 2013
Tajikistan Initial Environmental Examination
Building Climate Resilience in the Pyanj River Basin: Water Supply Facilities (Draft)
Environmental Assessment and Measures Apr 2013
Tajikistan Initial Environmental Examination
Strengthened Maternal and Child Health Results through Improved Connectivity to CAREC Corridor 3 and 5
Environmental Assessment and Measures Sep 2012
Tajikistan Initial Environmental Examination
Central Asia Regional Economic Cooperation Corridor 6 (Ayni-Uzbekistan Border Road) Improvement Project
Environmental Assessment and Measures Aug 2012
Tajikistan Initial Environmental Examination
Roads Improvement Project: Ayni-Panjakent Road (Draft)
Environmental Assessment and Measures Jun 2012
Tajikistan Initial Environmental Examination
Nurek 500 kV Switchyard Reconstruction: Initial Environmental Examination
Environmental Assessment and Measures May 2011
Tajikistan Environmental Impact Assessments
CAREC Corridor 3 (Dushanbe-Uzbekistan Border) Improvement Project
Environmental Assessment and Measures Sep 2010
Tajikistan Initial Environmental Examination
Regional Power Rehabilitation Project: Initial Environmental Examination
Environmental Assessment and Measures Feb 2010
Tajikistan Initial Environmental Examination
Regional Power Transmission Project: New Substation Geran Initial Environmental Examination
Environmental Assessment and Measures Feb 2010