|
Philippines |
Initial Environmental Examination
Visayas Base Load Power Project: The New Fly Ash and Bed Ash Disposal Scheme |
Environmental Assessment and Measures |
Apr 2013 |
|
Armenia |
Sevan–Hrazdan Cascade Hydropower System Rehabilitation Project: Report and Recommendation of the President |
Reports and Recommendations of the President |
Mar 2013 |
|
India |
Hydro and Wind Power Development Project: Report and Recommendation of the President |
Reports and Recommendations of the President |
Mar 2013 |
|
India |
Initial Environmental Examination
IND: 145 Megawatts Grid-Connected Solar Project: 25 MWp Ujjawala Solar Power Project |
Environmental Assessment and Measures |
Aug 2012 |
|
India |
Initial Environmental Examination
IND: 145 Megawatts Grid-Connected Solar Project: 25 MWp Sandland Solar Power Project |
Environmental Assessment and Measures |
Aug 2012 |
|
Afghanistan |
Supporting the Inter-Ministerial Commission for Energy |
Technical Assistance Reports |
Feb 2013 |
|
India |
Extended Annual Review Reports
Tata Power Wind Energy Financing Facility: Extended Annual Review Report
|
Completion Reports |
Nov 2012 |
|
India |
NSL Renewable Power Project: Project Data Sheet (हिन्दी) |
Translated PDS |
Jun 2012 |
|
Bangladesh |
ইট-নির্মান খাত উন্নয়ন সহায়তা কর্মসূচি |
Translated PDS |
Jan 2013 |
|
Thailand |
โครงการโรงไฟฟ้าแก๊สธรรมชาติอยุธยา: เอกสารข้อมูลโครงการ |
Translated PDS |
Jan 2013 |
|
Thailand |
Central Thailand Solar Power Project: Report and Recommendation of the President |
Reports and Recommendations of the President |
Feb 2013 |
|
Indonesia |
Tangguh Liquefied Natural Gas Project: Integrated Social Programme Tangguh LNG - Operations Phase (April - October 2012) |
Social and Environmental Monitoring Reports |
Jan 2013 |
|
Indonesia |
Tangguh Liquefied Natural Gas Project: Operator’s Environmental, Health and Safety Report (April - October 2012) |
Social and Environmental Monitoring Reports |
Jan 2013 |
|
Regional |
Assisting the Central Asia Regional Economic Cooperation Institute Knowledge Program (Phase 1): Technical Assistance Report |
Technical Assistance Reports |
Dec 2012 |
|
China, People's Republic of |
Extended Annual Review Reports
Inner Mongolia Wind Power Project |
Completion Reports |
Nov 2012 |
|
India |
Extended Annual Review Reports
Gujarat Paguthan Wind Energy Financing Facility |
Completion Reports |
Nov 2012 |
|
India |
Extended Annual Review Reports
Urban Clean Fuels Project |
Completion Reports |
Nov 2012 |
|
Nepal |
Scaling Up Renewable Energy Project: Project Data Sheet (नेपाली) |
Translated PDS |
Nov 2012 |
|
India |
100 MW Tidong Hydroelectric Power Project (Draft Environment and Social Compliance Audit Report) |
Environment and Social Compliance Audit Reports |
Jun 2012 |
|
China, People's Republic of |
Agricultural and Municipal Waste to Energy Project |
Reports and Recommendations of the President |
Sep 2012 |
|
Thailand |
Environmental Impact Assessments
Ayudhaya Natural Gas Power Project: Environmental Impact Assessment |
Environmental Assessment and Measures |
Sep 2012 |
|
India |
145 Megawatts Grid-Connected Solar Project |
Reports and Recommendations of the President |
Aug 2012 |
|
Bangladesh |
TA Completion Reports
Tendering Process for Independent Power Producer Plants |
Completion Reports |
Sep 2012 |
|
Pakistan |
New Bong Escape Hydropower Project: Environmental and Social Issues Compliance Report (July - September 2012) |
Social and Environmental Monitoring Reports |
Sep 2012 |
|
India |
Initial Environmental Examination
IND: 145 Megawatts Grid-Connected Solar Project: 25 MWp Ganges Solar Power Project |
Environmental Assessment and Measures |
Aug 2012 |