Small to Medium-Sized Hydropower Development Project

Date: September 2007
Country:
Subject:
Document Type: Completion Reports / TA Completion Reports

Description

The main objective of the TA was to assist the Ministry of Energy and Water (MEW) in undertaking feasibility studies on a cross section of small to medium-sized hydropower plants and analytical work required for the project in order to provide much needed electric power to off-grid and isolated rural areas and increase the pace of economic development in these areas.