- About ADB
- News & Events
- Data & Research
- Publications
-
Focus Areas
-
Sectors
- Agriculture
- Education
- Energy
- Finance
- Health
- Industry and Trade
- Information and Communication Technology
- Public Sector Management
- Social Protection
- Transport
- Water
-
- Projects
-
Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
- South Asia Subregional Economic Cooperation (SASEC)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
Songhua River Basin Water Pollution Control and Management Project: Jilin Component
| Date: | September 2012 |
| Country: | |
| Subject: | |
| Document Type: | Social and Environmental Monitoring Reports / Environmental Monitoring Reports |
| Project Number: | 40665-013 |
Description
The second annual environmental monitoring report for the Jilin Component of the Songhua River Basin Water Pollution Control and Management Project in the People's Republic of China documents the screening of the environmental activities and consequences of the project for the period of January-December 2011. It covers the construction, commissioning and operation phases of the project, as well as demonstrates compliance with the Environmental Management Plan for the design, bidding, and construction preparation stages.