Strengthening Urban Transport Subsector under ADB-supported Urban Development Projects: Jodhpur Bus Rapid Transit Pre-Feasibility Study

Date: September 2013
Country:
Subject:
Document Type: Technical Assistance Consultant's Reports
Project Number: 44508-001

Download Document



Description

This consultant report on a pre-feasibility study on the Jodhpur Bus Rapid Transit (BRT) was prepared by consultants under ADB Technical Assistance No. 7750, Strengthening Urban Transport Subsector under ADB-supported Urban Development Projects in India. It examines how best to implement a BRT system on the proposed transport corrido and includes information on ridership and revenue forecasts, preliminary assessments of land acquisition and resettlement costs, institutional arrangements, estimates of capital and operating costs and economic and financial assessments.