Tanahu (Upper Seti) Hydropower Project: Upper Seti (Damauli)-Bharatpur 220 kV Transmission Line Project

Date: June 2010
Country:
Subject:
Document Type: Environmental Assessment and Measures / Initial Environmental Examination
Project Number: 43281-013

Download Document



Description

This initial environmental examination describes the environmental condition of the Upper Seti (Damauli)-Bharatpur 220 kV Transmission Line Project of theTanahu (Upper Seti) Hydropower Project in Nepal, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring for the project.