Theppana Wind Power (Watabak 2) Project: Chaiyaphum Province

Initial Environmental Examination | November 2012

Initial environmental examinations describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring.

This document dated November 2012 is provided for the ADB project 45924-014 in Thailand.