Trans Borneo Power Grid: Sarawak to West Kalimantan Transmission Link (Malaysia Section)

Initial Environmental Examination | July 2011

Initial environmental examinations describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring.

This document dated July 2011 is provided for the ADB project 44921-014.