Visayas Base-load Power Development Project: Environmental Monitoring Report (July - September 2012)

Date: October 2012
Country:
Subject:
Document Type: Environmental and Social Monitoring Reports / Environmental Monitoring Reports
Project Number: 43906-014

Download Document



Description

This environmental monitoring report for the period of July to September 2012 describes the status of environmental issues or mitigation measures during project implementation of the Visayas Base-load Power Development Project in the Philippines.