Evaluation Resources

Results 1-2 of 2 for Guides 2014

These guidelines are interim in nature as they will be further revised to reflect changes in the Guidelines for Preparing Performance Evaluation Reports for Public Sector Operations, which is being updated. This interim guidelines were prepared to accommodate various changes in the validation exercise that have been introduced through various IED circulars and changes in ADB’s Operations Manual since 2012.

This guidelines have been prepared to facilitate evaluations of nonsovereign operations by the Independent Evaluation Department (IED), which is independent of Management and reports directly to ADB’s Board of Directors.