Evaluation Resources

Results 1-10 of 147 for 2009

The Director General of Independent Evaluation at the Asian Development Bank received this response from the Managing Director General on behalf of Management on the Evaluation of the Urban Services and Water Supply and Sanitation Sector in Viet Nam.

This report evaluates the performance of the Ninth Power Project aimed to improve the electric supply in Dhaka area and nearby rural areas in Bangladesh.

This report evaluates the performance of the Metropolitan Bogor, Tangerang, and Bekasi Urban Development (Sector) Project aimed at institutional development and physical investments in the urban areas of Indonesia.

This report evaluates the performance of the Primary Roads Restoration Project aimed to improve access, lower vehicle operating costs, and improved road safety through rehabilitation, repairs and restoration of roads and bridges in Cambodia.

This report evaluates the performance of the Engineering Education Development Project aimed at improving the quality, relevance, and capacity of engineering education, and enhancing access to qualified students in Indonesia.

This report evaluates the performance of the Meghnaghat Power Project designed to address power shortages and improve the low rate of access to electricity in Bangladesh.

This report evaluates the performance of the Third Natural Gas Development Project aimed to promote sector reforms, expand the gas distribution and treatment facilities and upgrade, rehabilitate and expand the gas transmission distribution in Banglades...

Validates the completion report's assessment of the project aimed at increasing farm income and raising the value of agricultural production of tea and fruit in selected provinces in Viet Nam. IED overall assessment: Successful

Validates the completion report's assessment of the project aimed at improving resource allocation in the public sector, increasing profitability of state-owned enterprises and promoting private sector participation in Indonesia. IED overall assessment: Successful

Validates the completion report's assessment of the project aimed at strengthening transmission systems, reducing transmission losses, improving system quality and enhancing efficient use of generation plants in India. IED overall assessment: Successful