ADB's partnership strategy for Azerbaijan aims to help boost private sector development, raise public sector efficiency, improve infrastructure, and strengthen human capital.

Azerbaijan: Results of ADB-Supported Operations, 2010-2018

Results achieved are aggregate amounts of outputs and outcomes from operations reported in project completion reports and extended annual review reports circulated for the year.

Energy

 60,000 tCO2 equivalent per year in greenhouse gas emission reduction

60,000 tCO2: The avoided CO2 equivalent emission as a result of a clean energy project or component of a project. Projects with CO2 emission reduction include renewable energy generation, energy efficiency projects in supply and demand side, and use of cleaner fuels such as natural gas in place of coal or oil.

 514 kilometers transmission lines installed or upgraded

514 kilometers: Length of power, gas, and oil transmission lines (ground distance in kilometers). For power transmission lines, this should be the simple distance from tower A to tower B and not the circuit-kilometer.

Transport

 597,607 average daily vehicle-kilometers use of roads built or upgraded in the first full year of operation

597,607 average daily vehicle-kilometers: Traffic benefiting from built or upgraded roads in the year after project completion. Vehicles are buses, trucks, minivans, cars, motorcycles, and other motorized means of conveyance, depending on the country and location. Daily vehicle-kilometers is to be calculated by adding all distances in kilometers traveled by all types of vehicles in a day on roads built or upgraded.

 132 kilometers roads built or upgraded

132 kilometers: Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

 132 kilometers expressways and national highways built or upgraded

132 kilometers: Expressways and national highways built or upgraded (kilometers)

Water

 20 kilometers water supply pipes installed or upgraded

20 kilometers: All sizes of new and repaired or upgraded pipes intended to transport water for urban water use for domestic and nonagricultural business purposes, expressed as their aggregate length in the network, irrespective of pipe diameter, comprising mains as well as reticulation pipes.

Finance

 2,124 small and medium-sized enterprise loan accounts opened or end borrowers reached

2,124: Preferably number of end borrowers, but if not available, the number of small and medium-sized enterprise (SME) loan accounts opened (regardless of amount) over the course of the project. The calculation does not include equity operations for SMEs. The definition of SMEs follows the definition generally used in the country of the project.

Regional Cooperation and Integration

 25,170,000 tons/year cross-border cargo volume facilitated

25,170,000 tons/year: Volume of cargo that crossed borders that are facilitated by ADB operations contributing to regional connectivity. Such operations may include regional road construction and rehabilitation, and border infrastructure and systems improvement.

Note: Results achieved are aggregate amounts of outputs and outcomes from operations reported in project completion reports and extended annual review reports circulated for the year.

Sources: ADB project and/or program completion reports issued in 2010-2018, staff estimates, and ADB Strategy and Policy Department.

More resources

Development Effectiveness Review

The annual Development Effectiveness Review assesses ADB's progress in implementing its long-term strategic framework, Strategy 2020.

ADB Results Framework

Introduced in 2008, the ADB corporate results framework is a management tool that helps ADB monitor and improve its performance to achieve the goals set out in Strategy 2020.

Driving Results at ADB

ADB is pursuing a deliberate, structured program of managing for development results (MfDR). This program provides the process and tools needed to deliver optimal results and ensure transparency and accountability.