fbpx Cambodia: Results of ADB-supported Operations | Asian Development Bank

Cambodia and ADB

ADB is supporting Cambodia to become competitive and ensure inclusive development, for the long term, through stronger institutions that promote strategic investments, including in human capital, natural resources, infrastructure and technology.

Cambodia: Results of ADB-Supported Operations, 2010-2018

Results achieved are aggregate amounts of outputs and outcomes from operations reported in project completion reports and extended annual review reports circulated for the year.

Energy

 55,500 new households connected to electricity

55,500: Number of new households given electricity connection.

 220 MW installed energy generation capacity

220 MW: Aggregated additional capacity in megawatts (MW) resulting from generation projects using conventional and renewable energy sources.

 518 kilometers transmission lines installed or upgraded

518 kilometers: Length of power, gas, and oil transmission lines (ground distance in kilometers). For power transmission lines, this should be the simple distance from tower A to tower B and not the circuit-kilometer.

 53 kilometers distribution lines installed or upgraded

53 kilometers: Length of the distribution network of lines or pipes installed and/or upgraded in kilometers, aggregating: (i) power distribution lines installed or upgraded, generally at 110 kilovolts or lower; (ii) district heating network pipes installed or upgraded; and (iii) urban gas supply network pipes installed or upgraded.

Transport

 8,560,964 average daily vehicle-kilometers use of roads built or upgraded in the first full year of operation

8,560,964 average daily vehicle-kilometers: Traffic benefiting from built or upgraded roads in the year after project completion. Vehicles are buses, trucks, minivans, cars, motorcycles, and other motorized means of conveyance, depending on the country and location. Daily vehicle-kilometers is to be calculated by adding all distances in kilometers traveled by all types of vehicles in a day on roads built or upgraded.

 1,471 kilometers roads built or upgraded

1,471 kilometers: Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

 1,028 kilometers expressways and national highways built or upgraded

1,028 kilometers: Expressways and national highways built or upgraded (kilometers)

 443 kilometers provincial, district, and rural roads built or upgraded

443 kilometers: Provincial, district, and rural road networks built or upgraded (kilometers)

Water

 96,550 households with new or improved water supply

96,550: All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

 50,325 households with new or improved sanitation

50,325: All additional households that benefit from projects offering a variety of sanitation systems to households that either did not benefit from sanitation systems before or benefit from systems of lesser order, and households that are already benefiting from sanitation services but are provided with improved service, e.g., sewer connection, septic tank, pour-flush, simple pit latrine, or ventilated improved pit latrine.

 24,147 hectares land improved through irrigation, drainage and/or flood management

24,147 hectares: Land area improved through any new or improved: (i) irrigation, (ii) drainage services, and (iii) flood management works.

Finance

 2,447,598 microfinance loan accounts opened / end borrowers reached

2,447,598: The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

 36,727 small and medium-sized enterprise loan accounts opened or end borrowers reached

36,727: Preferably number of end borrowers, but if not available, the number of small and medium-sized enterprise (SME) loan accounts opened (regardless of amount) over the course of the project. The calculation does not include equity operations for SMEs. The definition of SMEs follows the definition generally used in the country of the project.

Education

 379,232 students benefiting from new or improved educational facilities

379,232: Total number of students benefiting from new or upgraded physical educational facilities.

 256,784 students educated and trained under improved quality assurance systems

256,784: Total number of students benefiting from improved quality assurance systems under the projects.

 252,784 students educated and trained under improved quality assurance systems, TVET

252,784: Total number of students benefiting from improved quality assurance systems under the projects (TVET).

 4,072 teachers trained with quality or competent standards

4,072: Number of teachers trained who are likely to improve teaching practices and support improvements in curriculum, textbooks, or pedagogy.

 1,715 teachers trained with quality or competent standards, TVET

1,715: Number of teachers trained who are likely to improve teaching practices and support improvements in curriculum, textbooks, or pedagogy, as part of technical and vocational education and training (TVET), under the projects.

Regional Cooperation and Integration

 248 GWH/year cross-border transmission of electricity

248 GWH/year: Cross-border electricity, in GWh, transmitted annually based on PCRs circulated during the year. Achieved outputs of operations with the thematic classification of regional cooperation and integration are counted.

 2,737,235 tons/year cross-border cargo volume facilitated

2,737,235 tons/year: Volume of cargo that crossed borders that are facilitated by ADB operations contributing to regional connectivity. Such operations may include regional road construction and rehabilitation, and border infrastructure and systems improvement.

Note: Results achieved are aggregate amounts of outputs and outcomes from operations reported in project completion reports and extended annual review reports circulated for the year.

Sources: ADB project and/or program completion reports issued in 2010-2018, staff estimates, and ADB Strategy and Policy Department.

More resources

Development Effectiveness Review

The annual Development Effectiveness Review assesses ADB's progress in implementing its long-term strategic framework, Strategy 2020.

ADB Results Framework

Introduced in 2008, the ADB corporate results framework is a management tool that helps ADB monitor and improve its performance to achieve the goals set out in Strategy 2020.

Driving Results at ADB

ADB is pursuing a deliberate, structured program of managing for development results (MfDR). This program provides the process and tools needed to deliver optimal results and ensure transparency and accountability.