India: Results of ADB-Supported Operations, 2010-2018

Results achieved are aggregate amounts of outputs and outcomes from operations reported in project completion reports and extended annual review reports circulated for the year.

Energy

 992,573 tCO2 equivalent per year in greenhouse gas emission reduction

25,181,929 tCO2: The avoided CO2 equivalent emission as a result of a clean energy project or component of a project. Projects with CO2 emission reduction include renewable energy generation, energy efficiency projects in supply and demand side, and use of cleaner fuels such as natural gas in place of coal or oil.

 606,174 new households connected to electricity

606,174: Number of new households given electricity connection.

 12,927 MW installed energy generation capacity

12,927 MW: Aggregated additional capacity in megawatts (MW) resulting from generation projects using conventional and renewable energy sources.

 6,784 kilometers transmission lines installed or upgraded

6,784 kilometers: Length of power, gas, and oil transmission lines (ground distance in kilometers). For power transmission lines, this should be the simple distance from tower A to tower B and not the circuit-kilometer.

 43,719 kilometers distribution lines installed or upgraded

43,719: Length of the distribution network of lines or pipes installed and/or upgraded in kilometers, aggregating: (i) power distribution lines installed or upgraded, generally at 110 kilovolts or lower; (ii) district heating network pipes installed or upgraded; and (iii) urban gas supply network pipes installed or upgraded.

Transport

 33,613,168 average daily vehicle-kilometers use of roads built or upgraded in the first full year of operation

33,613,168 average daily vehicle-kilometers: Traffic benefiting from built or upgraded roads in the year after project completion. Vehicles are buses, trucks, minivans, cars, motorcycles, and other motorized means of conveyance, depending on the country and location. Daily vehicle-kilometers is to be calculated by adding all distances in kilometers traveled by all types of vehicles in a day on roads built or upgraded.

 33,021 kilometers roads built or upgraded

33,021 kilometers: Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

 3,920 kilometers expressways and national highways built or upgraded

3,920 kilometers: Expressways and national highways built or upgraded (kilometers)

 23,536 kilometers provincial, district, and rural roads built or upgraded

23,536 kilometers: Provincial, district, and rural road networks built or upgraded (kilometers)

Water

 3,768,601 households with new or improved water supply

3,768,601: All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

 963,516 households with new or improved sanitation

963,516: All additional households that benefit from projects offering a variety of sanitation systems to households that either did not benefit from sanitation systems before or benefit from systems of lesser order, and households that are already benefiting from sanitation services but are provided with improved service, e.g., sewer connection, septic tank, pour-flush, simple pit latrine, or ventilated improved pit latrine.

 342,6760 m3/day wastewater treatment capacity added or improved

342,6760 meters3/day: Maximum cubic meters of wastewater intake per day at the new or improved treatment plant, excluding waste treatment capacity of septic tanks and the removal of the waste.

 8,535 kilometers water supply pipes installed or upgraded

8,535 kilometers: All sizes of new and repaired or upgraded pipes intended to transport water for urban water use for domestic and nonagricultural business purposes, expressed as their aggregate length in the network, irrespective of pipe diameter, comprising mains as well as reticulation pipes.

 250,960 hectares land improved through irrigation, drainage and/or flood management

250,960 hectares: Land area improved through any new or improved: (i) irrigation, (ii) drainage services, and (iii) flood management works.

 745,400 households with reduced flood risk

745,400: Number of rural and urban households protected from flood risks through (i) urban projects that include flood management components, (ii) irrigation and water resources development projects that include flood management components, and (iii) stand-alone flood management projects.

Finance

 2,621,370 microfinance loan accounts opened / end borrowers reached

2,621,370: The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

 392,056 small and medium-sized enterprise loan accounts opened or end borrowers reached

392,056: Preferably number of end borrowers, but if not available, the number of small and medium-sized enterprise (SME) loan accounts opened (regardless of amount) over the course of the project. The calculation does not include equity operations for SMEs. The definition of SMEs follows the definition generally used in the country of the project.

Regional Cooperation and Integration

 9,279,000 tons/year cross-border cargo volume facilitated

9,279,000 tons/year: Volume of cargo that crossed borders that are facilitated by ADB operations contributing to regional connectivity. Such operations may include regional road construction and rehabilitation, and border infrastructure and systems improvement.

Note: Results achieved are aggregate amounts of outputs and outcomes from operations reported in project completion reports and extended annual review reports circulated for the year.

Sources: ADB project and/or program completion reports issued in 2010-2018, staff estimates, and ADB Strategy and Policy Department.

More resources

Development Effectiveness Review

The annual Development Effectiveness Review assesses ADB's progress in implementing its long-term strategic framework, Strategy 2020.

ADB Results Framework

Introduced in 2008, the ADB corporate results framework is a management tool that helps ADB monitor and improve its performance to achieve the goals set out in Strategy 2020.

Driving Results at ADB

ADB is pursuing a deliberate, structured program of managing for development results (MfDR). This program provides the process and tools needed to deliver optimal results and ensure transparency and accountability.