Sri Lanka: Results of ADB-Supported Operations | Asian Development Bank

Results of ADB-Supported Operations: Sri Lanka

 Development Effectiveness Brief

Sri Lanka: Development Effectiveness Brief

Sri Lanka has emerged in recent years as one of the most dynamic countries in South Asia. With a rich cultural heritage, an increasingly sophisticated work force, and a strategic location that links Asia to Europe, the country is well positioned for strong economic growth for years to come.

In 1966 ADB and Sri Lanka became development partners, with the country being one of ADB’s founding members. Over the years, the two have worked together to realize the goal of changing the country’s status from low to middle income.

ADB continues to support Sri Lanka in new areas such as private sector development, knowledge solutions, and development of advanced infrastructure as the country transforms into an upper-middle-income country.

The country brief summarizes how the partnership between the Government of Sri Lanka and ADB has contributed to the development of the country.

  Download

Results of ADB-Supported Operations in Sri Lanka, 2010-2016

Energy

 

189,234 new households connected to electricity

189,234: Number of new households given electricity connection.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
30207: Power Sector Development Program
Sector Development Program 1929 31-Oct-2002 30-Jun-2006 72,467
30207: Power Sector Development Program
Sector Development Program 1930 31-Oct-2002 31-Mar-2010 72,467
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 11-Dec-2003 13-Dec-2011 27,000
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 17,300
 

189,234 new households connected to electricity, rural

189,234: Number of new rural households given electricity connection.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
30207: Power Sector Development Program
Sector Development Program 1929 31-Oct-2002 30-Jun-2006 72,467
30207: Power Sector Development Program
Sector Development Program 1930 31-Oct-2002 31-Mar-2010 72,467
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 11-Dec-2003 13-Dec-2011 27,000
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 17,300
 

163 MW installed energy generation capacity

163 MW: Aggregated additional capacity in megawatts (MW) resulting from generation projects using conventional and renewable energy sources.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
34912: AES Kelantissa Review Report
Project 7167/1815 01-Dec-2000 15-Jun-2001 163
 

1,850 kilometers distribution lines installed or updgraded

1,850 kilometers: Length of the distribution network of lines or pipes installed and/or upgraded in kilometers, aggregating: (i) power distribution lines installed or upgraded, generally at 110 kilovolts or lower; (ii) district heating network pipes installed or upgraded; and (iii) urban gas supply network pipes installed or upgraded.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
30207: Power Sector Development Program
Sector Development Program 1929 31-Oct-2002 30-Jun-2006 853.85
30207: Power Sector Development Program
Sector Development Program 1930 31-Oct-2002 31-Mar-2010 996.13

Transport

 

1,581,032 average daily vehicle-kilometers use of roads built or upgraded in the first full year of operation

1,581,032 average daily vehicle-kilometers: Traffic benefiting from built or upgraded roads in the year after project completion. Vehicles are buses, trucks, minivans, cars, motorcycles, and other motorized means of conveyance, depending on the country and location. Daily vehicle-kilometers is to be calculated by adding all distances in kilometers traveled by all types of vehicles in a day on roads built or upgraded.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 11-Dec-2003 13-Dec-2011 331,056.88
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2044 11-Dec-2003 19-Apr-2011 198,634.13
26522: Southern Transport Development Project
Project 1711 06-Mar-2008 05-Jul-2013 275,369
26523: Southern Transport Development Project
Project 2413 06-Mar-2008 05-Jul-2013 275,369
39619-013: Eastern and North Central Provincial Road Project (formerly Road Network Project [Provincial Roads])
Project 2546 16-Sep-2009 30-Sep-2014 500,603
 

3,088 kilometers roads built or upgraded

3,088 kilometers: Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
34023: Plantation Development Project
Project 1913 13-Sep-2002 22-Feb-2010 260
34023: Plantation Development Project
Project 1914 13-Sep-2002 26-Nov-2009 260
31282: Southern Province Rural Economic Advancement Project
Project 1849 26-Oct-2001 31-Dec-2009 933
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 11-Dec-2003 13-Dec-2011 90.60
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2044 11-Dec-2003 19-Apr-2011 211
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 14-Apr-2005 31-Jan-2011 370
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 216
26522: Southern Transport Development Project
Project 1711 06-Mar-2008 05-Jul-2013 66
26523: Southern Transport Development Project
Project 2413 06-Mar-2008 05-Jul-2013 66
39619-013: Eastern and North Central Provincial Road Project (formerly Road Network Project [Provincial Roads])
Project 2546 16-Sep-2009 30-Sep-2014 385.40
35201-013: Local Government Infrastructure Improvement Project
Project 2201 24-Nov-2005 30-Jan-2013 230
 

766 kilometers expressways and national highways built or updgraded

766 kilometers: Expressways and national highways built or updgraded (kilometers)

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 11-Dec-2003 13-Dec-2011 90.60
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2044 11-Dec-2003 19-Apr-2011 211
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 14-Apr-2005 31-Jan-2011 332
26522: Southern Transport Development Project
Project 1711 06-Mar-2008 05-Jul-2013 66
26523: Southern Transport Development Project
Project 2413 06-Mar-2008 05-Jul-2013 66
 

2,322 kilometers provincial, district, and rural roads built or upgraded

2,322 kilometers: Provincial, district, and rural road networks built or upgraded (kilometers).

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
34023: Plantation Development Project
Project 1913 13-Sep-2002 22-Feb-2010 260
34023: Plantation Development Project
Project 1914 13-Sep-2002 26-Nov-2009 260
31282: Southern Province Rural Economic Advancement Project
Project 1849 26-Oct-2001 31-Dec-2009 933
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 14-Apr-2005 31-Jan-2011 38
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 216
39619-013: Eastern and North Central Provincial Road Project (formerly Road Network Project [Provincial Roads])
Project 2546 16-Sep-2009 30-Sep-2014 385.40
35201-013: Local Government Infrastructure Improvement Project
Project 2201 24-Nov-2005 30-Jan-2013 230
 

2,695 kilometers roads built or upgraded, rural

2,695 kilometers: Length of rural road networks built or upgraded (kilometers).

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
34023: Plantation Development Project
Project 1913 13-Sep-2002 22-Feb-2010 260
34023: Plantation Development Project
Project 1914 13-Sep-2002 26-Nov-2009 260
31282: Southern Province Rural Economic Advancement Project
Project 1849 26-Oct-2001 31-Dec-2009 933
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 11-Dec-2003 13-Dec-2011 90.60
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2044 11-Dec-2003 19-Apr-2011 211
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 14-Apr-2005 31-Jan-2011 370
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 216
39619-013: Eastern and North Central Provincial Road Project (formerly Road Network Project [Provincial Roads])
Project 2546 16-Sep-2009 30-Sep-2014 354.57
 

261 kilometers roads built or upgraded, urban

261 kilometers: Length of urban road networks built or upgraded (kilometers).

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39619-013: Eastern and North Central Provincial Road Project (formerly Road Network Project [Provincial Roads])
Project 2546 16-Sep-2009 30-Sep-2014 30.83
35201-013: Local Government Infrastructure Improvement Project
Project 2201 24-Nov-2005 30-Jan-2013 230

Water

 

188,964 households with new or improved water supply

188,964: All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 11-Dec-2003 13-Dec-2011 3,272
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 14-Apr-2005 31-Jan-2011 45,146
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 8,154
35201-013: Local Government Infrastructure Improvement Project
Project 2201 24-Nov-2005 30-Jan-2013 5,142
31501-013/ 31501-023/ 31501-033: Secondary Towns and Rural Community-Based Water Supply and Sanitation Project
Project 1993/2276/2758 16-Jan-2003 31-Dec-2014 113,307.51
31501-013/ 31501-023/ 31501-033: Secondary Towns and Rural Community-Based Water Supply and Sanitation Project
Project 2275/2757 16-Jan-2003 31-Dec-2014 13,942.49
 

119,714 households with new or improved water supply, rural

119,714: All additional rural households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 11-Dec-2003 13-Dec-2011 3,272
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 14-Apr-2005 31-Jan-2011 45,146
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 8,154
31501-013/ 31501-023/ 31501-033: Secondary Towns and Rural Community-Based Water Supply and Sanitation Project
Project 1993/2276/2758 16-Jan-2003 31-Dec-2014 56,223.68
31501-013/ 31501-023/ 31501-033: Secondary Towns and Rural Community-Based Water Supply and Sanitation Project
Project 2275/2757 16-Jan-2003 31-Dec-2014 6,918.32
 

69,250 households with new or improved water supply, urban

69,250: All additional urban households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
35201-013: Local Government Infrastructure Improvement Project
Project 2201 24-Nov-2005 30-Jan-2013 5,142
31501-013/ 31501-023/ 31501-033: Secondary Towns and Rural Community-Based Water Supply and Sanitation Project
Project 1993/2276/2758 16-Jan-2003 31-Dec-2014 57,083.84
31501-013/ 31501-023/ 31501-033: Secondary Towns and Rural Community-Based Water Supply and Sanitation Project
Project 2275/2757 16-Jan-2003 31-Dec-2014 7,024.16
 

28,993 households with new or improved sanitation

28,993: All additional households that benefit from projects offering a variety of sanitation systems to households that either did not benefit from sanitation systems before or benefit from systems of lesser order, and households that are already benefiting from sanitation services but are provided with improved service, e.g., sewer connection, septic tank, pour-flush, simple pit latrine, or ventilated improved pit latrine.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
34023: Plantation Development Project
Project 1913 13-Sep-2002 22-Feb-2010 873
34023: Plantation Development Project
Project 1914 13-Sep-2002 26-Nov-2009 873
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 11-Dec-2003 13-Dec-2011 3,272
35201-013: Local Government Infrastructure Improvement Project
Project 2201 24-Nov-2005 30-Jan-2013 1,461
31501-013/ 31501-023/ 31501-033: Secondary Towns and Rural Community-Based Water Supply and Sanitation Project
Project 1993/2276/2758 16-Jan-2003 31-Dec-2014 20,047.19
31501-013/ 31501-023/ 31501-033: Secondary Towns and Rural Community-Based Water Supply and Sanitation Project
Project 2275/2757 16-Jan-2003 31-Dec-2014 2,466.81
 

350 m3/day waste water treatment capacity added or improved

350 m3/day: Maximum cubic meters of wastewater intake per day at the new or improved treatment plant, excluding waste treatment capacity of septic tanks and the removal of the waste.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
31501-013/ 31501-023/ 31501-033: Secondary Towns and Rural Community-Based Water Supply and Sanitation Project
Project 1993/2276/2758 16-Jan-2003 31-Dec-2014 311.65
31501-013/ 31501-023/ 31501-033: Secondary Towns and Rural Community-Based Water Supply and Sanitation Project
Project 2275/2757 16-Jan-2003 31-Dec-2014 38.35
 

799 kilometers water supply pipes installed or upgraded

799 kilometers: All sizes of new and repaired or upgraded pipes intended to transport water for urban water use for domestic and nonagricultural business purposes, expressed as their aggregate length in the network, irrespective of pipe diameter, comprising mains as well as reticulation pipes.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
31501-013/ 31501-023/ 31501-033: Secondary Towns and Rural Community-Based Water Supply and Sanitation Project
Project 1993/2276/2758 16-Jan-2003 31-Dec-2014 711.46
31501-013/ 31501-023/ 31501-033: Secondary Towns and Rural Community-Based Water Supply and Sanitation Project
Project 2275/2757 16-Jan-2003 31-Dec-2014 87.54
 

5,629 hectares land improved through irrigation, drainage and/or flood management

5,629 hectares: Land area improved through any new or improved: (i) irrigation, (ii) drainage services, and (iii) flood management works.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 11-Dec-2003 13-Dec-2011 3,279
39619-013: Eastern and North Central Provincial Road Project (formerly Road Network Project [Provincial Roads])
Project 2546 16-Sep-2009 30-Sep-2014 2,300
35201-013: Local Government Infrastructure Improvement Project
Project 2201 24-Nov-2005 30-Jan-2013 50
 

33,100 households with reduced flood risk

33,100: Number of rural and urban households protected from flood risks through (i) urban projects that include flood management components, (ii) irrigation and water resources development projects that include flood management components, and (iii) stand-alone flood management projects.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
39619-013: Eastern and North Central Provincial Road Project (formerly Road Network Project [Provincial Roads])
Project 2546 16-Sep-2009 30-Sep-2014 3,000
35201-013: Local Government Infrastructure Improvement Project
Project 2201 24-Nov-2005 30-Jan-2013 30,100

Finance

 

129,897 microfinance loan accounts opened / end borrowers reached

129,897: The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
36357-01/03: Financial Markets Program for Private Sector Development (Program Loan)
Program 2138/2139 15-Dec-2004 28-Oct-2010 100,991
33249-013: North East Coastal Community Development Project
Project 2027 28-Nov-2003 24-Jan-2012 7,583
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 14-Apr-2005 31-Jan-2011 15,550
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 5,773
 

77,833 microfinance loan accounts opened / end borrowers reached, female

77,833: The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
36357-01/03: Financial Markets Program for Private Sector Development (Program Loan)
Program 2138/2139 15-Dec-2004 28-Oct-2010 53,525.23
33249-013: North East Coastal Community Development Project
Project 2027 28-Nov-2003 24-Jan-2012 6,585
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 14-Apr-2005 31-Jan-2011 12,450
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 5,273
 

52,064 microfinance loan accounts opened / end borrowers reached, male

52,064: The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
36357-01/03: Financial Markets Program for Private Sector Development (Program Loan)
Program 2138/2139 15-Dec-2004 28-Oct-2010 47,465.77
33249-013: North East Coastal Community Development Project
Project 2027 28-Nov-2003 24-Jan-2012 998
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 14-Apr-2005 31-Jan-2011 3,100
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 500
 

9,441 small and medium-sized enterprise loan accounts opened or end borrowers reached

9,441: Preferably number of end borrowers, but if not available, the number of small and medium-sized enterprise (SME) loan accounts opened (regardless of amount) over the course of the project. The calculation does not include equity operations for SMEs. The definition of SMEs follows the definition generally used in the country of the project.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
34023: Plantation Development Project
Project 1913 13-Sep-2002 22-Feb-2010 8
34023: Plantation Development Project
Project 1914 13-Sep-2002 26-Nov-2009 8
31282: Southern Province Rural Economic Advancement Project
Project 1849 26-Oct-2001 31-Dec-2009 4,841
33246: Small and Medium Enterprise Sector Development Program
Program 1894 20-Dec-2001 18-Apr-2005 2,020
34318: Aquatic Resource Development and Quality Improvement Project
Project 1910 05-Sep-2002 16-Jul-2012 37
34318: Aquatic Resource Development and Quality Improvement Project
Project 1911 05-Sep-2002 26-Nov-2010 84
41932-014: People's Leasing Company Limited
Project 7269/2369 23-Nov-2007 15-Jun-2013 1,477
36117-013: Small and Medium Enterprise REG Development Project
Project 2381 06-Dec-2007 15-Aug-2012 966

Education

 

2,910,121 students benefiting from new or improved educational facilities

2,910,121: Total number of students benefiting from new or upgraded physical educational facilities.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
33251: Distance Education Modernization Project
Project 1999 11-Jun-2003 28-Jul-2010 30,355
35192-013: Secondary Education Modernization Project II
Project 2096 25-Oct-2004 14-Dec-2011 2,715,963
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 83,823
39293-013: Education for Knowledge Society Project
Project 2371/G0091 26-Nov-2007 16-Dec-2015 79,980
 

1,483,562 female students benefiting from new or improved educational facilities

1,483,562: Total number of female students benefiting from new or upgraded physical educational facilities.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
33251: Distance Education Modernization Project
Project 1999 11-Jun-2003 28-Jul-2010 17,768
35192-013: Secondary Education Modernization Project II
Project 2096 25-Oct-2004 14-Dec-2011 1,379,709.20
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 45,151
39293-013: Education for Knowledge Society Project
Project 2371/G0091 26-Nov-2007 16-Dec-2015 40,933.76
 

1,426,559 male students benefiting from new or improved educational facilities

1,426,559: Total number of male students benefiting from new or upgraded physical educational facilities.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
33251: Distance Education Modernization Project
Project 1999 11-Jun-2003 28-Jul-2010 12,587
35192-013: Secondary Education Modernization Project II
Project 2096 25-Oct-2004 14-Dec-2011 1,336,253.80
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 38,672
39293-013: Education for Knowledge Society Project
Project 2371/G0091 26-Nov-2007 16-Dec-2015 39,046.24
 

143,473 students educated and trained under improved quality assurance systems

143,473: Total number of students benefiting from improved quality assurance systems under the projects.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
35192-013: Secondary Education Modernization Project II
Project 2096 25-Oct-2004 14-Dec-2011 143,473
 

72,884 female students educated and trained under improved quality assurance systems

72,884: Total number of female students benefiting from improved quality assurance systems under the projects.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
35192-013: Secondary Education Modernization Project II
Project 2096 25-Oct-2004 14-Dec-2011 72,884.28
 

70,589 male students educated and trained under improved quality assurance systems

70,589: Total number of male students benefiting from improved quality assurance systems under the projects.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
35192-013: Secondary Education Modernization Project II
Project 2096 25-Oct-2004 14-Dec-2011 70,588.72
 

51,923 teachers trained with quality or competency standards

51,923: Number of teachers trained who are likely to improve teaching practices and support improvements in curriculum, textbooks, or pedagogy.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
33251: Distance Education Modernization Project
Project 1999 11-Jun-2003 28-Jul-2010 18
35192-013: Secondary Education Modernization Project II
Project 2096 25-Oct-2004 14-Dec-2011 26,000
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 6,500
39293-013: Education for Knowledge Society Project
Project 2371/G0091 26-Nov-2007 16-Dec-2015 19,405
 

37,639 female teacher trained with quality or competency standards

37,639: Number of female teachers trained who are likely to improve teaching practices and support improvements in curriculum, textbooks, or pedagogy.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
33251: Distance Education Modernization Project
Project 1999 11-Jun-2003 28-Jul-2010 5.30
35192-013: Secondary Education Modernization Project II
Project 2096 25-Oct-2004 14-Dec-2011 20,800
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 3,250
39293-013: Education for Knowledge Society Project
Project 2371/G0091 26-Nov-2007 16-Dec-2015 13,583.50
 

14,284 male teacher trained with quality or competency standards

14,284: Number of male teachers trained who are likely to improve teaching practices and support improvements in curriculum, textbooks, or pedagogy.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Output
33251: Distance Education Modernization Project
Project 1999 11-Jun-2003 28-Jul-2010 12.70
35192-013: Secondary Education Modernization Project II
Project 2096 25-Oct-2004 14-Dec-2011 5,200
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 09-Mar-2010 21-May-2013 3,250
39293-013: Education for Knowledge Society Project
Project 2371/G0091 26-Nov-2007 16-Dec-2015 5,821.50

m3/day = cubic meter per day.

Note: Results achieved are aggregate amounts of outputs and outcomes from operations reported in project completion reports and extended annual review reports circulated for the year.