fbpx Tajikistan: Results of ADB-supported Operations | Asian Development Bank

Tajikistan and ADB

ADB’s investments in Tajikistan have emphasized diversifying the economic base and improving the investment climate to create jobs with higher incomes.

Tajikistan: Results of ADB-Supported Operations, 2020

Results achieved are aggregate amounts of outputs and outcomes from operations reported in project completion reports and extended annual review reports circulated for the year.


Tajikistan: Results of ADB-Supported Operations, 2019

Results achieved are aggregate amounts of outputs and outcomes from operations reported in project completion reports and extended annual review reports circulated for the year.


Tajikistan: Results of ADB-Supported Operations, 2010-2018

Energy

 95 new households connected to electricity

95: Number of new households given electricity connection.

 3 kilometers transmission lines installed or upgraded

3 kilometers: Length of power, gas, and oil transmission lines (ground distance in kilometers). For power transmission lines, this should be the simple distance from tower A to tower B and not the circuit-kilometer.

 3 kilometers distribution lines installed or upgraded

3 kilometers: Length of the distribution network of lines or pipes installed and/or upgraded in kilometers, aggregating: (i) power distribution lines installed or upgraded, generally at 110 kilovolts or lower; (ii) district heating network pipes installed or upgraded; and (iii) urban gas supply network pipes installed or upgraded.

Transport

 1,782,278 average daily vehicle-kilometers use of roads built or upgraded in the first full year of operation

1,782,278 average daily vehicle-kilometers: Traffic benefiting from built or upgraded roads in the year after project completion. Vehicles are buses, trucks, minivans, cars, motorcycles, and other motorized means of conveyance, depending on the country and location. Daily vehicle-kilometers is to be calculated by adding all distances in kilometers traveled by all types of vehicles in a day on roads built or upgraded.

 627 kilometers roads built or upgraded

627 kilometers: Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Water

 39,730 households with new or improved water supply

39,730: All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

 117 kilometers water supply pipes installed or upgraded

117 kilometers: All sizes of new and repaired or upgraded pipes intended to transport water for urban water use for domestic and nonagricultural business purposes, expressed as their aggregate length in the network, irrespective of pipe diameter, comprising mains as well as reticulation pipes.

 164,114 hectares land improved through irrigation, drainage and/or flood management

164,114 hectares: Land area improved through any new or improved: (i) irrigation, (ii) drainage services, and (iii) flood management works.

Finance

 608 microfinance loan accounts opened / end borrowers reached

608: The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Education

 112,500 students benefiting from new or improved educational facilities

112,500: Total number of students benefiting from new or upgraded physical educational facilities.

 6,080 teachers trained with quality or competent standards

6,080: Number of teachers trained who are likely to improve teaching practices and support improvements in curriculum, textbooks, or pedagogy.

Regional Cooperation and Integration

 289,000 tons/year cross-border cargo volume facilitated

289,000 tons/year: Volume of cargo that crossed borders that are facilitated by ADB operations contributing to regional connectivity. Such operations may include regional road construction and rehabilitation, and border infrastructure and systems improvement.

Note: Results achieved are aggregate amounts of outputs and outcomes from operations reported in project completion reports and extended annual review reports circulated for the year.

Sources: ADB project and/or program completion reports issued in 2010-2018, staff estimates, and ADB Strategy and Policy Department.

More resources

Development Effectiveness Review

The annual Development Effectiveness Review assesses ADB's progress in implementing its long-term corporate results framework.

Managing for Development Results

To help realize its vision of an Asia and the Pacific free of poverty, ADB is pursuing a deliberate, structured program of managing for development results.

ADB Results Framework

The ADB Results Framework assesses overall development progress in Asia and the Pacific and ADB’s effectiveness in delivering development results.

Driving Results at ADB

ADB is pursuing a deliberate, structured program of managing for development results (MfDR). This program provides the process and tools needed to deliver optimal results and ensure transparency and accountability.