Bangladesh: Padma Multipurpose Bridge Design Project

Evaluation Document | 19 May 2021

This project was to develop the detailed design of the Padma multipurpose bridge including river training works (RTW) and approach roads, and to assist the Jamuna Multipurpose Bridge Authority (JMBA) in engaging contractors. The targeted outputs were the preparation of scheme designs, technical studies, detailed design, tender action, environmental impact assessment, resettlement plan, and land acquisition plan.

This report validates the completion report's assessment of the project. IED overall assessment: Successful.