Involuntary Resettlement - Case Studies in Philippines

Evaluation Document | 1 January 2008
The case studies presented in this report were conducted in preparation of the special evaluation study (SES) of the Asian Development Bank's (ADB) 1995 Policy on Involuntary Resettlement (IR). This SES was conducted by the Operations Evaluation Department (OED) upon the request of the Development Effectiveness Committee (DEC) of ADB's Board of Directors.

The case studies presented in this report were conducted in preparation of the special evaluation study (SES) of the Asian Development Bank's (ADB) 1995 Policy on Involuntary Resettlement (IR). This SES was conducted by the Operations Evaluation Department (OED) upon the request of the Development Effectiveness Committee (DEC) of ADB's Board of Directors. The evaluation of the IR Policy was carried out within a limited time frame so that it could contribute to the scheduled review process leading to the update of ADB's safeguard policies in 2008.

Contents 

  • Introduction
  • Project Cast Studies
  • Loan 1473-PHI: Sixth Road Project
  • Loan 1668-PHI: Southern Philippines Irrigation Sector