Project Name Power Generation Efficiency Improvement Project
Project Number 49253-002
Country / Economy Uzbekistan
Project Status Closed
Project Type / Modality of Assistance Technical Assistance
Source of Funding / Amount
TA 9099-UZB: Power Generation Efficiency Improvement Project
Technical Assistance Special Fund US$ 1.50 million
TA 9099-UZB: Power Generation Efficiency Improvement Project (Supplementary)
Technical Assistance Special Fund US$ 300,000.00
TA 9099-UZB: Power Generation Efficiency Improvement Project (Supplementary)
Technical Assistance Special Fund US$ 450,000.00
TA 9099-UZB: Power Generation Efficiency Improvement (2nd Supplementary)
Technical Assistance Special Fund US$ 150,000.00
Strategic Agendas Environmentally sustainable growth
Inclusive economic growth
Drivers of Change Gender Equity and Mainstreaming
Governance and capacity development
Knowledge solutions
Sector / Subsector

Energy / Energy sector development and institutional reform

Gender Some gender elements
Description The project will construct two units of 450 MW energy efficient combined cycle gas turbines at the Talimarjan Thermal Power Plant located in Kashkadarya region, contributing to energy saving, greenhouse gas emission reduction, and reliable power supply in Uzbekistan. The project will build on the experience gained through Talimarjan Power Project (phase 1 project) by further improving the corporate governance and promoting commercialization of the energy sector.
Project Rationale and Linkage to Country/Regional Strategy

It is expected that the project preparatory technical assistance (PPTA) consultants will undertake the following due diligence.

(i) Technical. Technical due diligence will assess the size, design, configuration, functions, and the cooling tower of the power plant. The adequacy of interfaces with gas, water, and power evacuation facilities will be reviewed. Operation and maintenance capacity will be assessed. Implementation constraints and lessons from the phase 1 project will also be reviewed.

(ii) Economic and financial. Economic due diligence will review the least cost options and economic viability. Financial due diligence will cover the preparation of cost estimates and financing plan, the project financial viability, cost recovery tariff, and sustainability of Uzbekenergo and the Talimarjan TPP.

(iii) Governance. Governance due diligence will cover financial management assessment, procurement capacity assessment, assessment of implementation structure and fund flow arrangements, institutional and procedural constraint review, integrity due diligence of potential cofinancier, policy and legal capacity for Talimarjan TPP to be the end borrower.

(iv) Poverty and social. Poverty and social assessment will cover the potential impact on inclusive growth, at the national and local level, and both direct and indirect. The PPTA will assess how the project can enhance the functions and activities of the social community center to be established under the first phase project. Gender category is _"some gender elements"_.

(v) Safeguards. Environmental category is _"A"_. An environmental impact assessment will be conducted to abide by ADB's Safeguard Policy Statement (SPS) (2009). Involuntary resettlement and indigenous peoples impact categories are both _C_. The project expects no resettlement or land acquisition as the proposed facility will be installed within the existing thermal power plant. No indigenous peoples as described in SPS (2009) are present in the project area.

Impact
Project Outcome
Description of Outcome
Progress Toward Outcome
Implementation Progress
Description of Project Outputs
Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location Nation-wide
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design

As a part of the preparation of environmental impact assessment, at least two stakeholder consultations will be conducted by the project implementation agency with the assistance of project preparatory technical assistance consultant.

In addition, as a part of rapid poverty and social assessment, PPTA consultant will organize Focus Group discussions (FGD) and structured interviews in Nuristan town.

During Project Implementation To be confirmed during the project design.
Business Opportunities
Consulting Services

Consulting firm services totalling 33 person-months for international and 20 person-months for national, respectively to undertake project due diligence, prepare feasibility reports required by the Government and draft bidding documents. Recruitment selection method: quality-and cost-based selection (QCBS) with full technical proposal.

Individual national consultant is required to assist Executing Agency and project processing team in (i) achieving project readiness, and (ii) recruiting the project implementation

consultant, and (iii) assessing the local industry capacity in the power sector.

Responsible ADB Officer Kim, Seung Duck
Responsible ADB Department Central and West Asia Department
Responsible ADB Division Energy Division, CWRD
Executing Agencies
Joint-Stock Company Regional Electrical Power Networks
66, Mustakilik str.,Tashkent, Uzbekistan
Timetable
Concept Clearance -
Fact Finding -
MRM -
Approval 19 Apr 2016
Last Review Mission -
Last PDS Update 29 Sep 2017

TA 9099-UZB

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
19 Apr 2016 13 May 2016 13 May 2016 30 Jun 2017 31 Dec 2019 16 Jun 2020
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
2,400,000.00 0.00 0.00 0.00 0.00 0.00 2,400,000.00 17 Jun 2022 2,215,510.66
 
This page was generated from /projects/49253-002/main on 06 June 2023