IND: 145 Megawatts Grid-Connected Solar Project: 20 MWp Hiraco Solar Power Project

Initial environmental examinations describe the environmental condition of a project, including potential impact, formulation of mitigation measures, and preparation of institutional requirements and environmental monitoring.

This document dated August 2012 is provided for the ADB project 44932-024 in India.

Subtype 

Environmental Assessment and Measures
 

 
This page was generated from /projects/documents/ind-145-megawatts-grid-connected-solar-project-20-mwp-hiraco-solar-power-iee on 06 June 2023

Source URL: https://www.adb.org/projects/documents/ind-145-megawatts-grid-connected-solar-project-20-mwp-hiraco-solar-power-iee