Preparing the Climate Adaptive Water Resources Management in the Aral Sea Basin Project: Buried Pipe Irrigation System for Babatag Subproject Consultant's Report

The project is aimed for improvement of food and water security in the Aral Sea Basin in Uzbekistan by improving the performance of selected irrigation and drainage subprojects in the Amu Darya and Zarafshan River Basins. The midterm report has been evaluated by the Ministry of Water Resources (MWR) and the ministry proposed not to consider Jondor system for the pressure pipe irrigation due to relief limitations and to reduce the area of pressure pipe system in Babatag subproject.

Consultants' reports describe activities by a consultant or group of consultants related to preparing a technical assistance project.

This document dated October 2020 is provided for the ADB project 53120-002 in Uzbekistan.

Subtype 

Consultants' Reports
 

 
This page was generated from /projects/documents/uzb-53120-002-tacr-0 on 05 May 2024

Source URL: https://www.adb.org/projects/documents/uzb-53120-002-tacr-0