India : MFF - Madhya Pradesh Power Sector Investment Program (Tranche 1)
The transmission component of MP's investment program from 2007 to 2012 is predicated on building sufficient capacity for evacuation of power from existing and planned power stations and substation, and delivering power reliability and efficiency to consumers. ADB will finance key components of the transmission investment program from 2007 though to 2012. The construction of new transmission lines will remove constraints to power flow and will provide additional operational flexibility to TRANSCO in its role as independent system operator in MP. Supply reliability will be further improved and furthermore, it will promote open access and development of intra-state and inter-state power trading by probiding sufficient excess substation and line capacity to handle unplanned power transfers.
Project Results
-
1,437
kilometers of transmission lines installed or upgraded
The results data reported above are limited to ADB's core sectors, as defined under Strategy 2020 and tracked through indicators in the ADB Results Framework. For definitions of results indicators, please see the ADB Results Framework Indicators Definition.
Project Details
-
Project Officer
Banerjee, Jyotirmoy
South Asia Department
Request for information -
Country/Economy
India -
Modality
-
Sector
- Energy
Related Projects
| Project Name | MFF - Madhya Pradesh Power Sector Investment Program (Tranche 1) | ||||
| Project Number | 32298-023 | ||||
| Country / Economy | India |
||||
| Project Status | Closed | ||||
| Project Type / Modality of Assistance | Loan |
||||
| Source of Funding / Amount |
|
||||
| Strategic Agendas | Environmentally sustainable growth |
||||
| Drivers of Change | Governance and capacity development Private sector development |
||||
| Sector / Subsector | Energy / Energy sector development and institutional reform |
||||
| Gender | No gender elements | ||||
| Description | The transmission component of MP's investment program from 2007 to 2012 is predicated on building sufficient capacity for evacuation of power from existing and planned power stations and substation, and delivering power reliability and efficiency to consumers. ADB will finance key components of the transmission investment program from 2007 though to 2012. The construction of new transmission lines will remove constraints to power flow and will provide additional operational flexibility to TRANSCO in its role as independent system operator in MP. Supply reliability will be further improved and furthermore, it will promote open access and development of intra-state and inter-state power trading by probiding sufficient excess substation and line capacity to handle unplanned power transfers. | ||||
| Project Rationale and Linkage to Country/Regional Strategy | The intervention in the Madhya Pradesh power sector is consistent with the ADB Strategy of supporting state level sector reforms, in this case with the emphasis on the transmission and distribution subsectors. | ||||
| Impact | Contributed to sustaining economic growth and social development in Madhya Pradesh. Contributed to meeting the energy demand growth in Madhya Pradesh |
||||
| Project Outcome | |
|---|---|
| Description of Outcome | Improvement in operational efficiency, voltage profile and power delivery capacity in Madhya Pradesh. |
| Progress Toward Outcome | 100% Progress |
| Implementation Progress | |
| Description of Project Outputs | Construction of transmission lines for power evacuation and strengthening of transmission systems. |
| Status of Implementation Progress (Outputs, Activities, and Issues) | 100% Progress |
| Geographical Location | Ashoknagar, Betul, Bhopal, Chhindwara, Dewas, East Nimar, Guna, Harda, Hoshangabad, Indore, Jabalpur, Katni, Narsinghpur, Panna, Rajgarh, Satna, Sehore, Shahdol, Shajapur, Shivpuri, Sidhi, Ujjain, Vidisha, West Nimar |
| Safeguard Categories | |
|---|---|
| Environment | B |
| Involuntary Resettlement | B |
| Indigenous Peoples | B |
| Summary of Environmental and Social Aspects | |
|---|---|
| Environmental Aspects | Loan covenants relating to Environmental and Social Safeguards are met by EA in implementing the project. The Environmental Monitoring reports submitted by EA have been uploaded in ADB website. |
| Involuntary Resettlement | EA reported that there were no major land acquisition and resettlement issues under this loan. |
| Indigenous Peoples | |
| Stakeholder Communication, Participation, and Consultation | |
| During Project Design | |
| During Project Implementation | |
| Business Opportunities | |
|---|---|
| Consulting Services | At appraisal, it was assessed that MPTRANSCO has the requisite institutional capability to implement the project and hence services of consultant was not availed. Accordingly, no consultant was engaged by ADB for this project. However, MPTRANSCO appointed separate consultants for preparation of Environment and Social Safeguard reports and formulation of Resettlement Plan. M/s Xavier Institute of Development Action and Studies, Jabalpur was appointed as the Environment Specialist and another team were appointed as the Social and Resettlement Specialist. The reports on implementation of Resettlement Plan (RP), Environmental Management Plan (EMP), updated Initial Environmental Examination (IEE) reports, updated RP, Due Diligence Report (DDR) on Social Task, Environmental DDR and short resettlement plan (SRP) on Social Task. These reports were further submitted to ADB. |
| Procurement | International competitive bidding (ICB) has been used for supply and construction of the facilities being funded under the investment program (substations, tranmission lines, equipment, and transformers, etc.). ICB is utilized for supply contracts estimated to cost the equivalent of or more than $1 million. Limited international bidding (LIB) or national competitive bidding (NCB) was agreed to be used for supply contracts estimated at $250,000-$1 million, and shopping for contracts estimated at less than $250,000. Contract packages were prepared to ensure maximum competition under ICB. MPTRANSCO made use of advance procurement action as agreed by ADB. About $53 million worth of contracts could be planned within June 2007 i.e. just after the effectiveness of the loan. |
| Responsible ADB Officer | Banerjee, Jyotirmoy |
| Responsible ADB Department | South Asia Department |
| Responsible ADB Division | India Resident Mission |
| Executing Agencies |
Madhya Pradesh Power Transmission Company Limited Mr. R.K. Verma, Chairman and Managing Director [email protected] Shakti Bhawan, Rampur, Jabalpur - 482 008, Mahdya Pradesh |
| Timetable | |
|---|---|
| Concept Clearance | 23 Nov 2005 |
| Fact Finding | 16 Oct 2006 to 24 Oct 2006 |
| MRM | 11 Dec 2006 |
| Approval | 04 Apr 2007 |
| Last Review Mission | - |
| PDS Creation Date | 18 Apr 2007 |
| Last PDS Update | 21 Mar 2013 |
Loan 2323-IND
| Milestones | |||||
|---|---|---|---|---|---|
| Approval | Signing Date | Effectivity Date | Closing | ||
| Original | Revised | Actual | |||
| 04 Apr 2007 | 12 Apr 2007 | 14 May 2007 | 30 Jun 2011 | 30 Jun 2012 | 31 Jan 2013 |
| Financing Plan | Loan Utilization | ||||
|---|---|---|---|---|---|
| Total (Amount in US$ million) | Date | ADB | Others | Net Percentage | |
| Project Cost | 132.50 | Cumulative Contract Awards | |||
| ADB | 106.00 | 17 Jun 2022 | 97.27 | 0.00 | 100% |
| Counterpart | 26.50 | Cumulative Disbursements | |||
| Cofinancing | 0.00 | 17 Jun 2022 | 97.27 | 0.00 | 100% |
| Status of Covenants | ||||||
|---|---|---|---|---|---|---|
| Category | Sector | Safeguards | Social | Financial | Economic | Others |
| Rating | Satisfactory | Satisfactory | Satisfactory | Satisfactory | - | Satisfactory |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
| Title | Document Type | Document Date |
|---|---|---|
| MFF - Madhya Pradesh Power Sector Investment Program (Tranche 1) | Project/Program Completion Reports | Aug 2013 |
| Madhya Pradesh Power Sector Investment Program (Project 1) | Procurement Plans | Jan 2011 |
| Madhya Pradesh Power Sector Investment Program (Tranche 1 - Transmission Capacity Expansion) | Project/Program Administration Manual | Jan 2008 |
| Loan Agreement for Madhya Pradesh Power Sector Investment Program -- Project 1 [Transmission Capacity Expansion] between India and ADB dated 12 April 2007 | Loan Agreement (Ordinary Resources) | Apr 2007 |
| Project Agreement for Madhya Pradesh Power Sector Investment Program -- Project 1 (Transmission Capacity Expansion) between ADB and State of Madhya Pradesh Madhya Pradesh Power Transmission Company Limited (dated 12 April 2007) | Project/Program Agreements | Apr 2007 |
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
| Title | Document Type | Document Date |
|---|---|---|
| Madhya Pradesh Power Sector Investment Program (Project 1&3): Ashta | Resettlement Plans | Nov 2010 |
| Madhya Pradesh Power Sector Investment Program - Tranche 1 and Tranche 3 (April 2010 - September 2010) | Environmental Monitoring Reports | Sep 2010 |
| Madhya Pradesh Power Sector Investment Program Environmental Monitoring Report - Tranche 1 (July 2009 - September 2009) | Environmental Monitoring Reports | Dec 2009 |
Evaluation Documents See also: Independent Evaluation
| Title | Document Type | Document Date |
|---|---|---|
| India: Madhya Pradesh Power Sector Investment Program | Project Performance Evaluation Reports | Apr 2020 |
| India: MFF - Madhya Pradesh Power Sector Investment Program (Tranche 1) | Validations of Project Completion Reports | Dec 2015 |
Related Publications
| Title | Document Type | Document Date |
|---|---|---|
| India: Madhya Pradesh Power Sector Investment Program | Papers and Briefs | May 2015 |
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
Contracts Awarded
Procurement Plan
| Title | Document Type | Document Date |
|---|---|---|