India : MFF - Madhya Pradesh Power Sector Investment Program (Tranche 2)
The distribution component of MP's investment program from 2007 to 2012 is predicated on building sufficient capacity for evacuation of power from exisitn and planned power stations and substations, and delivering power reliability and efficiency to consumers. ADB will finance part of the distribution investment program from 2007 through 2012. The impact of the distribution component will be more pronounced and apparent from the perspective of consumers. Improvements in voltage profiles will be evident through better lighting and fewer equipment failures. Supply will be available more consistently and momentary outages will be significantly reduced. The distribution component will also directly impact both technical and non-technical losses and eventually sector profitability and financial sustainability.
Project Details
-
Project Officer
Banerjee, Jyotirmoy
South Asia Department
Request for information -
Country/Economy
India -
Modality
-
Sector
- Energy
Related Projects
| Project Name | MFF - Madhya Pradesh Power Sector Investment Program (Tranche 2) | ||||
| Project Number | 32298-033 | ||||
| Country / Economy | India |
||||
| Project Status | Closed | ||||
| Project Type / Modality of Assistance | Loan |
||||
| Source of Funding / Amount |
|
||||
| Strategic Agendas | Environmentally sustainable growth Inclusive economic growth |
||||
| Drivers of Change | Governance and capacity development Private sector development |
||||
| Sector / Subsector | Energy / Energy sector development and institutional reform |
||||
| Gender | No gender elements | ||||
| Description | The distribution component of MP's investment program from 2007 to 2012 is predicated on building sufficient capacity for evacuation of power from exisitn and planned power stations and substations, and delivering power reliability and efficiency to consumers. ADB will finance part of the distribution investment program from 2007 through 2012. The impact of the distribution component will be more pronounced and apparent from the perspective of consumers. Improvements in voltage profiles will be evident through better lighting and fewer equipment failures. Supply will be available more consistently and momentary outages will be significantly reduced. The distribution component will also directly impact both technical and non-technical losses and eventually sector profitability and financial sustainability. | ||||
| Project Rationale and Linkage to Country/Regional Strategy | The intervention in the Madhya Pradesh power sector is consistent with the ADB Strategy of supporting state level sector reforms, in this case with the emphasis on the transmission and distribution subsectors. | ||||
| Impact | Contributed to sustaining economic growth and social development in Madhya Pradesh. Contributed to meeting the energy demand growth in Madhya Pradesh |
||||
| Project Outcome | |
|---|---|
| Description of Outcome | Reduction in system losses and improved supply quality and reliability. |
| Progress Toward Outcome | Distribution losses during FY2010: 32.78% System reliability during FY2010: 91% Collection efficiency for FY2010 was 96% in urban areas and 93.22% in urban and rural areas combined. |
| Implementation Progress | |
| Description of Project Outputs | Installation of, high voltage distribution systems, remote metering, consumer metering and renovation of substation protection system. |
| Status of Implementation Progress (Outputs, Activities, and Issues) | Contracts for all the originally envisaged nine packages were awarded during December 2007 to March 2009. Out of nine packages, two packages have already been completed; six packages are under implementation and one package, namely HVDS in Gudawara was terminated in July 2010 due to unsatisfactory performance of the contractor. The re-bidding process has been initiated for the terminated contract and the same is expected to be awarded by April 2011. |
| Geographical Location | Chhindwara, Damoh, Gadarwara, Jabalpur, Jabalpur, Katni, Mandla, Narsimhapur, Patan, Prithvipur, Rewa, Sagar, Satna, Seoni, Shahdol, Sidhi, Tikamgarh |
| Safeguard Categories | |
|---|---|
| Environment | B |
| Involuntary Resettlement | B |
| Indigenous Peoples | B |
| Summary of Environmental and Social Aspects | |
|---|---|
| Environmental Aspects | Loan covenants relating to Environmental and Social Safeguards are being met by DISCOM in implementing the project. The institutional arrangements for supervision and reporting have been streamlined with engagement of external monitoring agency. The semi-annual reports submitted on implementation of EMPs have not raised any environmental safeguards related concerns. The Environmental Monitoring reports submitted by DISCOM have been uploaded in ADB website. |
| Involuntary Resettlement | DISCOM reported that there were no land acquisition and resettlement issues under this loan. |
| Indigenous Peoples | |
| Stakeholder Communication, Participation, and Consultation | |
| During Project Design | |
| During Project Implementation | |
| Business Opportunities | |
|---|---|
| Consulting Services | No consultants will be required under the Project. |
| Procurement | International competitive bidding (ICB) is used for supply and construction of the facilities being funded under the investment program (substations, distribution system, equipment, and transformers, etc.). ICB is being utilized for supply contracts estimated to cost the equivalent of or more than $1 million. Limited international bidding (LIB) or national competitive bidding (NCB) will be used for supply contracts estimated at $250,000-$1 million, and shopping for contracts estimated at less than $250,000. Contract packages are being prepared to ensure maximum competition under ICB. |
| Responsible ADB Officer | Banerjee, Jyotirmoy |
| Responsible ADB Department | South Asia Department |
| Responsible ADB Division | India Resident Mission |
| Executing Agencies |
Madhya Pradesh Poorv Kshetra Vidyut Vitaran Co Ltd Mr. Pankaj Agarwal [email protected], [email protected] Shakti Bhawan, Rampur, Jabalpur - 482008 |
| Timetable | |
|---|---|
| Concept Clearance | 23 Nov 2005 |
| Fact Finding | 16 Oct 2006 to 24 Oct 2006 |
| MRM | 11 Dec 2006 |
| Approval | 04 Apr 2007 |
| Last Review Mission | - |
| PDS Creation Date | 18 Apr 2007 |
| Last PDS Update | 21 Mar 2013 |
Loan 2324-IND
| Milestones | |||||
|---|---|---|---|---|---|
| Approval | Signing Date | Effectivity Date | Closing | ||
| Original | Revised | Actual | |||
| 04 Apr 2007 | 12 Apr 2007 | 14 May 2007 | 30 Sep 2011 | 31 Dec 2012 | 15 Jul 2013 |
| Financing Plan | Loan Utilization | ||||
|---|---|---|---|---|---|
| Total (Amount in US$ million) | Date | ADB | Others | Net Percentage | |
| Project Cost | 65.70 | Cumulative Contract Awards | |||
| ADB | 45.00 | 17 Jun 2022 | 40.75 | 0.00 | 100% |
| Counterpart | 20.70 | Cumulative Disbursements | |||
| Cofinancing | 0.00 | 17 Jun 2022 | 40.75 | 0.00 | 100% |
| Status of Covenants | ||||||
|---|---|---|---|---|---|---|
| Category | Sector | Safeguards | Social | Financial | Economic | Others |
| Rating | Satisfactory | Satisfactory | Satisfactory | Satisfactory | - | Satisfactory |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
| Title | Document Type | Document Date |
|---|---|---|
| Project Agreement for Madhya Pradesh Power Sector Investment Program -- Project 2 (Distribution Efficiency Enhancement) between ADB and State of Madhya Pradesh Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited dated 12 April 2007 | Project/Program Agreements | Apr 2007 |
| Madhya Pradesh Power Sector Investment Program (Tranche 2): Project Completion Report | Project/Program Completion Reports | May 2016 |
| Madhya Pradesh Power Sector Investment Program (Tranche 2 - Transmission Capacity Expansion) | Project/Program Administration Manual | Jan 2008 |
| Loan Agreement for Madhya Pradesh Power Sector Investment Program -- Project 2 [Distribution Efficiency Enhancement] between India and ADB dated 12 April 2007 | Loan Agreement (Ordinary Resources) | Apr 2007 |
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
| Title | Document Type | Document Date |
|---|---|---|
| Madhya Pradesh Power Sector Investment Program - Tranche 2: Environmental Monitoring Report (July-December 2011) | Environmental Monitoring Reports | Apr 2015 |
| Madhya Pradesh Power Sector Investment Program - Tranche 2: Environmental Monitoring Report (January-June 2011) | Environmental Monitoring Reports | Apr 2015 |
| Madhya Pradesh Power Sector Investment Program - Tranche 2 | Environmental Monitoring Reports | Jan 2010 |
| Madhya Pradesh Power Sector Investment Program - Project 2 (July-December 2010) | Environmental Monitoring Reports | Feb 2011 |
| Madhya Pradesh Power Sector Investment Program - Project 2 (January-June 2010) | Environmental Monitoring Reports | Feb 2011 |
| Madhya Pradesh Power Sector Investment Program (Tranche II): Environmental Monitoring Report (July-December 2012) | Environmental Monitoring Reports | Mar 2013 |
| Madhya Pradesh Power Sector Investment Program (Tranche II): Environmental Monitoring Report (January-June 2012) | Environmental Monitoring Reports | Nov 2012 |
Evaluation Documents See also: Independent Evaluation
| Title | Document Type | Document Date |
|---|---|---|
| India: Madhya Pradesh Power Sector Investment Program (Tranche 2) | Validations of Project Completion Reports | Dec 2016 |
| India: Madhya Pradesh Power Sector Investment Program | Project Performance Evaluation Reports | Apr 2020 |
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
India: Harvesting the Results of a Reliable Power Supply in Madhya Pradesh
In central India, ADB and the government partnered to bring an innovative solution to the long-standing problem of an unreliable power supply.