fbpx 37097-044: Integrated Rural Development Sector Project in the Central Provinces - Additional Financing | Asian Development Bank

Viet Nam: Integrated Rural Development Sector Project in the Central Provinces - Additional Financing

Sovereign (Public) Project | 37097-044 Status: Active
 
Project Name Integrated Rural Development Sector Project in the Central Provinces - Additional Financing
Project Number 37097-044
Country Viet Nam
Project Status Active
Project Type / Modality of Assistance Loan
Source of Funding / Amount
Loan 3173-VIE: Integrated Rural Development Sector in the Central Provinces - Additional Financing
concessional ordinary capital resources lending / Asian Development Fund US$ 85.00 million
Strategic Agendas Environmentally sustainable growth
Inclusive economic growth
Regional integration
Drivers of Change Gender Equity and Mainstreaming
Knowledge solutions
Partnerships
Sector / Subsector

Agriculture, natural resources and rural development / Agricultural drainage - Irrigation - Rural flood protection

Transport / Road transport (non-urban)

Gender Equity and Mainstreaming Effective gender mainstreaming
Description
Project Rationale and Linkage to Country/Regional Strategy
Impact Improved livelihoods, incomes, and standards of living for the region's rural population through increased agricultural productivity, wider employment opportunities, improved health and education levels, and reduced exposure to natural disasters.
Project Outcome
Description of Outcome Improved quality, greater coverage, and better integration of rural infrastructure in the Central Region with an increased awareness for the need for O&M.
Progress Toward Outcome 24 subprojects have contracts awarded
Implementation Progress
Description of Project Outputs

A significant amount of the rural and coastal infrastructure in the project provinces is rehabilitated, upgraded, and maintained.

Improved capacities of national and provincial staff in technical design and farmers in agricultural production techniques.

Improved project management skills for infrastructure development.

Status of Implementation Progress (Outputs, Activities, and Issues)

Output 1:

- 663 km of rural roads rehabilitated with 77 rural road subprojects

- 47 irrigation and drainage schemes covering about 120,838 ha rehabilitated

- 20 markets and 9 rural water supply schemes and 9 flood protection schemes constructed or rehabilitated.

- To date, 230.83 km (230.83%) of rural road has been completed.

- It is planned to have 38 irrigation and drainage schemes; 304 km of canal; 54,233 ha of rehabilitated area

- There are 111 CSBs established in 6 provinces. There are 202 women/523 members (38.6%)

Output 2:

- Already achieved much more than target, as 4,105 provincial staff including

1,437 women (35%) were trained in technical topics, safeguard matters, and participatory techniques

- By 31/12/2019, there were 13 training courses conducted for 545 participants, in which there were 116 women, covering 21.3%.

- By 31/12/2019, 286 training classes were conducted for 11,650 farmers, among whom 6,222 were women, making up 53.4%.

CPMU had conducted 2 workshops on agricultural extension expansion in Binh Thuan and Thua Thien Hue for 148 participants (34.4% of participants were women)

Output 3:

- Already achieved much more than target, as 377 provincial staff including 98 women (26%) were trained in project management and supervision (lower than women target, which is at least 30%)

- By 31/12/2019, there were 20 training courses conducted for 1,018 participants, in which there were 367 women, covering 36.1%.

- 72 central and provincial procurement staff including 12 women (16.7%)

were trained in ADB's new procurement procedures and requirements.

Geographical Location
Safeguard Categories
Environment B
Involuntary Resettlement B
Indigenous Peoples B
Summary of Environmental and Social Aspects
Environmental Aspects The safeguard categorization is B for environment, involuntary resettlement and indigenous peoples. Initial environmental Examination was conducted for a sample subproject and concluded no major adverse impacts as most of the works entail the rehabilitation and upgrading of existing small and medium scale rural infrastructure. The EARF has been updated for the additional financing to describe the detail implementation procedures and be in line with the ADB's Safeguards Policy Statement 2009.
Involuntary Resettlement The safeguard categorization is B for environment, involuntary resettlement and indigenous peoples. Initial environmental Examination was conducted for a sample subproject and concluded no major adverse impacts as most of the works entail the rehabilitation and upgrading of existing small and medium scale rural infrastructure. The EARF has been updated for the additional financing to describe the detail implementation procedures and be in line with the ADB's Safeguards Policy Statement 2009.
Indigenous Peoples The safeguard categorization is B for environment, involuntary resettlement and indigenous peoples. Initial environmental Examination was conducted for a sample subproject and concluded no major adverse impacts as most of the works entail the rehabilitation and upgrading of existing small and medium scale rural infrastructure. The EARF has been updated for the additional financing to describe the detail implementation procedures and be in line with the ADB's Safeguards Policy Statement 2009.
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation
Business Opportunities
Procurement Package to be procured: NCB packages Binh Dinh 09 and Binh Thuan 07
Responsible ADB Officer Vu, Chau V.
Responsible ADB Department Southeast Asia Department
Responsible ADB Division Viet Nam Resident Mission
Executing Agencies
Ministry of Agriculture and Rural Development
[email protected]
3rd Floor,Agricultural Exhibition Center
No.2, Hoang Quoc Viet Str.,Cau Giay Dist
Timetable
Concept Clearance 12 Apr 2013
Fact Finding 15 Aug 2013 to 30 Aug 2013
MRM 27 Mar 2014
Approval 20 Oct 2014
Last Review Mission -
Last PDS Update 06 Feb 2020

Loan 3173-VIE

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
20 Oct 2014 23 Jan 2015 22 Jun 2015 30 Jun 2019 30 Jun 2020 -
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 92.50 Cumulative Contract Awards
ADB 85.00 20 Oct 2014 73.62 0.00 95%
Counterpart 7.50 Cumulative Disbursements
Cofinancing 0.00 20 Oct 2014 72.23 0.00 93%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating Satisfactory Satisfactory Satisfactory - - Satisfactory

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Safeguard Documents See also: Safeguards

Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

Title Document Type Document Date
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Environmental Monitoring Report (January-June 2020) Environmental Monitoring Reports Jun 2020
Integrated Rural Development Sector Project in the Central Provinces – Additional Financing: Social Monitoring Report on Resettlement Social Monitoring Reports Jun 2020
Integrated Rural Development Sector Project in the Central Provinces – Additional Financing: Internal Social Safeguards Monitoring Report (July-December 2019) Social Monitoring Reports Jan 2020
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Environmental Monitoring Report (July-December 2019) Environmental Monitoring Reports Jan 2020
IRDSPCP (AF): Addendum for Upgrading the Cham Canal and Management Road of the South Primary Canal of Nha Trinh-Lam Cam Irrigation System Resettlement and Ethnic Minorities Development Plan Combined Resettlement Plan and Indigenous Peoples Plans Sep 2019
Integrated Rural Development Sector Project in the Central Provinces – Additional Financing: Environmental Monitoring Report (January-June 2019) Environmental Monitoring Reports Jul 2019
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Internal Social Safeguards Monitoring Report (January-June 2019) Social Monitoring Reports Jul 2019
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Tam Giang Irrigation System Subproject, Phu Yen Province Initial Environmental Examination Initial Environmental Examination Apr 2019
Integrated Rural Development Sector Project in the Central Provinces – Additional Financing: Social Safeguards Monitoring Report (July-December 2018) Social Monitoring Reports Jan 2019
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Environmental Monitoring Report (July-December 2018) Environmental Monitoring Reports Jan 2019
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Development Infrastructure for Safe Vegetable Cultivation in An Hai Commune Resettlement and Ethnic Minorities Development Plan Combined Resettlement Plan and Indigenous Peoples Plans Sep 2018
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Environmental Monitoring Report (January-June 2018) Environmental Monitoring Reports Aug 2018
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Social Safeguards Monitoring Report (January-June 2018) Social Monitoring Reports Jul 2018
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Canal N24 Van Phong Canal System, Binh Dinh Province Resettlement Plan Resettlement Plans Jul 2018
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Binh Thuan Province Environmental Management Plan Environmental Management Plans Apr 2018
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Social Safeguards Monitoring Report (July-December 2017) Social Monitoring Reports Jan 2018
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Environmental Monitoring Report (July-December 2017) Environmental Monitoring Reports Dec 2017
IRDSPCP (AF): An Hai Commune Vegetable Production Infrastructure Subproject Initial Environmental Examination Initial Environmental Examination Aug 2017
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Social Monitoring Report (January-June 2017) Social Monitoring Reports Jul 2017
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Environmental Monitoring Report (January-June 2017) Environmental Monitoring Reports Jun 2017
Integrated Rural Development Sector Project in the Central Provinces (AF): Dong Tron Reservoir, Phu Yen Province Resettlement Plan Resettlement Plans Mar 2017
Integrated Rural Development Sector Project in the Central Provinces (AF): Upgrading Dai Giang River Dike System Resettlement Plan Resettlement Plans Mar 2017
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Social Safeguards Monitoring Report (July-December 2016) Social Monitoring Reports Feb 2017
Integrated Rural Development Sector Project in the Central Provinces (AF): East-West Hoi Tom, Thua Thien Hue Province Resettlement Plan Resettlement Plans Jan 2017
Integrated Rural Development Sector Project in the Central Provinces (AF): Rac River Subproject Resettlement Due Diligence Report Safeguards Due Diligence Reports Dec 2016
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Environmental Monitoring Report (June-December 2016) Environmental Monitoring Reports Dec 2016
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Social Safeguards Monitoring Report Social Monitoring Reports Dec 2016
Integrated Rural Development Sector Project in the Central Provinces (AF): Infrastructures in Nhon Tho–Nhon Khanh, An Nhon Town, Binh Dinh Province Subproject Resettlement Plan Resettlement Plans Dec 2016
Integrated Rural Development Sector Project in the Central Provinces (AF): Suoi Cau Weir and Access Road Subproject Resettlement Plan Resettlement Plans Oct 2016
IRDSPCP (AF) - Dong Cam Irrigation Scheme Subproject: Resettlement Plan Resettlement Plans Sep 2016
IRDSPCP (AF) - Canal N24 Van Phong Canal System, Binh Dinh Province: Land Acquisition and Resettlement Due Diligence Report Safeguards Due Diligence Reports Aug 2016
IRDSPCP - Additional Financing: Hoi Khanh Reservoir Resettlement Plan Resettlement Plans Aug 2016
IRDSPCP - Additional Financing: An Cu-An Hiep-An Hoa Road and Sluice Resettlement Plan Resettlement Plans Aug 2016
IRDSPCP - Additional Financing: My Thuan Reservoir Resettlement Plan Resettlement Plans Aug 2016
IRDSPCP (AF): Upgrading Irrigated Canal of Dong Tron Reservoir’s Irrigation System Initial Environmental Examination Initial Environmental Examination Aug 2016
IRDSPCP (AF) - Nui Mot Reservoir’s Canal System, Binh Dinh Province: Resettlement Due Diligence Report Safeguards Due Diligence Reports Jul 2016
IRDSPCP (AF): Loc Ha District Flooding-Prone Area Irrigation/Drainage and Rural Road System Initial Environmental Examination Initial Environmental Examination Jul 2016
IRDSPCP (AF) - Dong Cam Irrigation Scheme, Phu Yen Province: Resettlement Due Diligence Report Safeguards Due Diligence Reports Jul 2016
IRDSPCP (AF) - Upgrading Saloun Reservoir: Resettlement and Ethnic Minorities Development Plan Combined Resettlement Plan and Indigenous Peoples Plans Jul 2016
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Upgrading Nui Mot Reservoir Canal System Resettlement Plan Resettlement Plans Jun 2016
IRDSPCP (AF): Upgrading East-West Hoi Tom Dike System Combined with Production Road Initial Environmental Examination Initial Environmental Examination Jun 2016
IRDSPCP (AF) - Upgrading the Cham Canal and Management Road of the South Primary Canal of Nha Trinh-Lam Cam Irrigation System: Resettlement and Ethnic Minorities Development Plan Combined Resettlement Plan and Indigenous Peoples Plans Jun 2016
IRDSPCP (AF) - Upgrading the Cham Canal and Management Road of the South Primary Canal of Nha Trinh-Lam Cam Irrigation System: Resettlement Due Diligence Report Safeguards Due Diligence Reports Jun 2016
IRDSPCP (AF) - Upgrading Beginning Section of the Primary North Canal of Nha Trinh-Lam Cam Irrigation System: Resettlement and Ethnic Minorities Development Plan Combined Resettlement Plan and Indigenous Peoples Plans May 2016
IRDSPCP - AF: Upgrading Suoi Cau Weir and Access Road Initial Environment Examination Initial Environmental Examination Mar 2016
Integrated Rural Development Sector Project in the Central Provinces (AF): Upgrading Dai Giang River Dike System, Thua Thien Hue Province Initial Environmental Examination Initial Environmental Examination Feb 2016
IRDSPCP - AF: Upgrading and Rehabilitating Cham Canal and access road of the South Main Canal under Nha Trinh-Lam Cam Irrigation Scheme, Ninh Thuan Province Initial Environment Examination Initial Environmental Examination Dec 2015
IRDSPCP - AF: Upgrading of Du Du Reservoir Subproject, Binh Thuan Province - Initial Environmental Examination Initial Environmental Examination Oct 2015
IRDSPCP (AF) - Upgrading Dyke, Rural Road, Drainage and Salt Control Culverts in An Cu, An Hiep, and An Hoa Communes Subproject: Initial Environmental Examination Initial Environmental Examination Aug 2015
IRDSPCP (AF) - Lining Beginning Section of Northern Main Canal (K0+500 to K10+00) and Upgrading Management Road of Nha Trinh-Lam Cam Irrigation System Subproject: Initial Environmental Examination Initial Environmental Examination Aug 2015
IRDSPCP (AF) - Lining Primary Canals of Song Quao River Irrigation System Subproject: Initial Environmental Examination Initial Environmental Examination Jul 2015
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Lining the Middle Section of Rac River Irrigation System, Ha Tinh Province Subproject - Initial Environmental Examination Initial Environmental Examination Jul 2015
IRDSPCP (AF) - Lining and Upgrading Main and Branch Canals of Dong Cam Irrigation System Subproject: Initial Environmental Examination Initial Environmental Examination Jul 2015
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Updated Resettlement and Ethnic Minority Development Framework Combined Resettlement Framework and Indigenous Peoples Planning Frameworks Jul 2015
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Pho Lai - Thanh Can - Nam Duong - Co Thap Dike Cum Road Initial Environmental Examination Initial Environmental Examination Jun 2015
Integrated Rural Development Sector Project in the Central Provinces (Additional Financing) - Lining North Ba Bau Canals of Ba Bau Reservoir Irrigation System Subproject, Bin Thuan Province: Initial Environmental Examination Initial Environmental Examination Dec 2014
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Upgrading Hoi Khanh Reservoir Canal System Resettlement Plan Resettlement Plans Jul 2014
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Upgrading Lai Giang Reservoir Canal System Resettlement Plan Resettlement Plans Jul 2014
Integrated Rural Development Sector Project in the Central Provinces (Additional Financing): Lining and Completing Canals of Lai Giang Irrigation Canals of Lai Giang Weir (Lai Giang River), Binh Dinh Province Initial Environmental Examination Initial Environmental Examination Jun 2014
Integrated Rural Development Sector Project in the Central Provinces (Additional Financing): Construction of Branch Canals of Van Phong Irrigation Scheme, Binh Dinh Province Initial Environmental Examination Initial Environmental Examination Jun 2014
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Upgrading Nui Mot Reservoir Canal System Resettlement Plan Resettlement Plans Jun 2014
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Nhon Tho - Nhon Khanh Road Subproject Initial Environmental Examination, Binh Dinh Province Initial Environmental Examination Jun 2014
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Saloun Reservoir and Irrigation System Subproject Initial Environmental Examination Oct 2013
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Environmental Assessment and Review Framework Environmental Assessment and Review Framework Oct 2013
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing Combined Resettlement Framework and Indigenous Peoples Planning Frameworks Aug 2013
Integrated Rural Development Sector Project in the Central Provinces - Additional Financing: Upgrading Rural Saloun Reservoir, Ham Thuan Bac District, Binh Thuan Province Combined Resettlement Plan and Indigenous Peoples Plans Aug 2013

Evaluation Documents See also: Independent Evaluation

None currently available.

Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
New project auditor 02 (for the rest) Firm - Consulting Closed 14 Aug 2018 12 Sep 2018

Contracts Awarded

Contract Title Approval Number Contract Date Contractor Contractor Address Executing Agency Contract Description Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
UPGRADING VAN PHONG CANAL SYSTEM: CONCRETE SURFACE OF THE WIDE BANK, BINH DINH PPMU Loan 3173 18 Feb 2020 HIEU NGOC- HOANG PHAT - HONG CHAU BINH DINH - NGHE AN - BINH DINH VIET NAM,SOC REP OF Ministry of Agriculture and Rural Development CONSTRUCTION 1,662,419.74 1,662,419.74
UPGRADING IRRIGATION CANALS OF TAM GIANG IRRIGATION SYSTEM, PHU YEN Loan 3173 12 May 2019 CTY CP XD & PT NONG THON 10 NO. 152, HONG BANG STREET, VINH CITY, NG HE AN PROVINCE VIET NAM,SOC REP OF Ministry of Agriculture and Rural Development CONSTRUCTION 1,597,330.74 1,594,254.35
UPGRADING PRIMARY CANAL OF QUAO RIVER (UPGRADING, REHABILITATING 05 PRIMARY CANALS OF N03, N9, N13, N19 AND N27), BINH THUAN Loan 3173 25 Dec 2018 KINH DOANH - MINH DUNG HANOI - NAM DINH VIET NAM,SOC REP OF Ministry of Agriculture and Rural Development CONSTRUCTION 1,066,502.87 1,066,502.87
AN HAI COMMUNE IRRIGATION SYSTEM, LOT 2: CONSTRUCT ING 15 WATER TANKS OF 500M3; MAIN PIPE SYSTEM AND FACILITIES AND PIPE SYSTEM OF GRADE 2 PUMP STATIO Loan 3173 12 Nov 2018 THANHLONG-HAHUY-SONLONGTHUAN-THINHPHAT-DONGA HANOI & NINH THUAN VIET NAM,SOC REP OF Ministry of Agriculture and Rural Development CONSTRUCTION 1,250,828.00 1,250,828.00
AN HAI COMMUNE IRRIGATION SYSTEM-LOT 1: CONSTRUCTI NG TUAN TU SPILLWAY, BASIN CANAL, PUMP STATION GRA DE 1; MARKET; ELECTRICITY SYSTEM, NINH THUAN Loan 3173 29 Oct 2018 JV: TRUONG LONG-AN NGUYEN-P.NGHIA-TLONG-GVIET NINH THUAN VIET NAM,SOC REP OF Ministry of Agriculture and Rural Development CONSTRUCTION 1,067,929.00 1,067,929.00
UPGRADING DAI GIANG RIVER DIKE SYSTEM SUBPROJECT: CIVIL CONSTRUCTION AND INSURANCE OF THE SLUCE OF QUAN, HUE Loan 3173 28 Sep 2018 THANH HOA - HKT - LONG PHUNG THANH HOA - HUE - HUE VIET NAM,SOC REP OF Ministry of Agriculture and Rural Development CONSTRUCTION 1,494,931.00 1,494,419.00
UPGRADING VAN PHONG CANAL SYSTEM, BINH DINH Loan 3173 20 Jun 2018 NGOC HIEU-HOANG PHAT-HONG CHAU VIET NAM VIET NAM,SOC REP OF Ministry of Agriculture and Rural Development CONSTRUCTION 1,955,375.00 1,937,120.00
Upgrading Dai Giang River Dike System: Lot 2, Thua Thien Hue Loan 3173 25 May 2017 471-Trung Tin Nghe An - Ha Noi Viet Nam, Soc Rep of Ministry of Agriculture and Rural Development Construction 1,747,739.00 1,746,200.00
Upgrading Road Combining With Flood Protection Dike of Pho Lai - Thanh Cam - Nam Duong - Co Phap: Civil Construction and Insurance, Thua Thien Hue Loan 3173 25 May 2017 Hai Thanh - Hoang Ngoc - Hung Hau Quang Binh - Tthue-Tthue Viet Nam, Soc Rep of Ministry of Agriculture and Rural Development Construction 2,535,774.00 2,533,541.00
Consolidate Main Canal and Branch Canals of Dong C Am Irrigation Scheme, Lot 1: Southern Main Canal Loan 3173 04 May 2017 Trung Anh - 522 - Tay Do Nghe An - Phu Yen - Ha Noi, Viet Nam, Soc Rep of Ministry of Agriculture and Rural Development Construction 1,534,827.00 1,534,827.00
Upgrading Dong Tay Hoi Tom Dike Combining With On-Farm Road, Phu Yen Loan 3173 04 May 2017 TCT XD NN & PTNT Thanh Hoa - CTCP No. 303, Ba Trieu Street, Ham Rong Ward, Thanh Hoa City, Thanh Hoa Province, Viet Nam, Soc Rep of Ministry of Agriculture and Rural Development Construction 2,333,725.00 2,333,725.00
Consolidate Main Canal and Branch Canals of Dong Cam Irrigation Scheme, Lot 2: Northern Manin Canal Loan 3173 04 May 2017 Minh Quang Co. Ltd 1 Quarter, Cau Giat Town, Quynh Luu Dis Trict, Nghe An Province, Viet Nam, Soc Rep of Ministry of Agriculture and Rural Development Construction 2,766,722.00 2,766,722.00