India : Bihar Urban Development Investment Program - Tranche 2

Sovereign Project | 41603-024

Tranche 2 aims to improve and expand the water infrastructure in the towns of Bhagalpur and Gaya in Bihar, and assist the urban local bodies (ULB) of these two towns to ensure sustainable operations and maintenance (O&M) of the water services.

Project Details

  • Project Officer
    Vishal, Vivek
    South Asia Department
    Request for information
  • Country/Economy
    India
  • Modality
  • Sector
    • Water and other urban infrastructure and services
Project Name
Bihar Urban Development Investment Program - Tranche 2
Project Number
41603-024
Country / Economy
  • India
Project Status
Closed
Project Type / Modality of Assistance
  • Loan
Source of Funding / Amount
Loan 3612-IND: Bihar Urban Development Investment Program - Tranche 2
Source Amount
Ordinary capital resources US$ 84.00 million
Strategic Agendas
  • Inclusive economic growth
Drivers of Change
  • Gender Equity and Mainstreaming
  • Governance and capacity development
  • Knowledge solutions
  • Private sector development
Sector / Subsector
  • Water and other urban infrastructure and services / Urban policy, institutional and capacity development - Urban water supply

Gender
Effective gender mainstreaming
Description
Tranche 2 aims to improve and expand the water infrastructure in the towns of Bhagalpur and Gaya in Bihar, and assist the urban local bodies (ULB) of these two towns to ensure sustainable operations and maintenance (O&M) of the water services.
Project Rationale and Linkage to Country/Regional Strategy
Bhagalpur and Gaya are the two major towns with the highest economic growth potential in Bihar, after the state capital, Patna. Despite being the economic centers of Bihar, the two towns have been unable to achieve the national urban service goals or match many of the national averages for urban service delivery performance in India. Their inability to sustain water supply and sewerage services is the result of inadequate size and condition of infrastructure, mainly attributed to inadequate new investment and operation and maintenance (O&M). The water supply service in both Bhagalpur and Gaya has poor performance, in comparison with the national average and target: (i) Water supply coverage below 80%, where national target is 94-100%; (ii) water supply amount around 60 liter capital per day (lpcd) , where national target is 123 lpcd; (iii) hours of water supply around 5 hours, target to 24 hours; and (iii) metered water connection around 0, where target is 100%.
Impact

Access to better quality and sustainable urban infrastructure and services, especially by vulnerable households in Bhagalpur and Gaya increased.

Project Outcome

Description of Outcome

Access to quality and sustainable urban water supply improved

Progress Toward Outcome
Water tariff structure and charge plan is being assessed.

Implementation Progress

Description of Project Outputs

Water supply infrastructure constructed and rehabilitated

Staffing and skills for water supply operations improved

Systems for water supply service delivery management improved

Status of Implementation Progress (Outputs, Activities, and Issues)
Work is under progress at 5 CSCs and one is under finishing under the project . The target is likely to be achieved. The work will be carried out by GMC. 314.70 km of distribution pipeline have been laid. 15.15 km of transmission pipeline laid. 21,776 house connection have been already completed. The target is likely to be achieved. O&M is carried out as per instructions. O&M manual submitted by M/s SREPC has been reviewed and suggestion given but still document is not finalized. So training has not been scheduled till date but the target is likely to be achieved by the end of the project. SCADA has not been installed. Training will be imparted after SCADA installation. The target is likely to be achieved. Tariff is fixed by Government of Bihar and accordingly concerned ULB is to implement. Proposed under the procurement of Institutional Development and Capacity Building Consultancy which is under process. The target is likely to be achieved. Proposed under the procurement of Institutional Development and Capacity Building Consultancy which is under process. The target is likely to be achieved.
Geographical Location
Bhagalpur, Gaya

Safeguard Categories

Environment
B
Involuntary Resettlement
B
Indigenous Peoples
C

Summary of Environmental and Social Aspects

Environmental Aspects
Project 2 is classified as category B for environment. All sites proposed for Project 2 in Gaya are not located within or adjacent to Eco sensitive areas. The most environmentally sensitive component of Project 2 was water intake in Bhagalpur, which is located in the middle of the 50 km Vikramshila Gangetic Dolphin Sanctuary (VGDS) which has been shifted to Bhagalpur Engineering college. IEE and EMP for the Bhagalpur water supply project is being updated by EA in line with the new intake location. IEEs with EMPs for Gaya projects were prepared in accordance with ADBs Safeguard Policy Statement (SPS), 2009.
Involuntary Resettlement
Project 2 is assessed to be category B for involuntary resettlement impacts. No involuntary land acquisition is anticipated for Project 2 as all sites and alignments belong to the government. The resettlement framework and indigenous people planning framework (IPPF) are updated for Project 2. Two resettlement plans and one due diligence report are prepared in accordance with SPS, 2009 and government laws.
Indigenous Peoples
Project 2 is classified as category C for indigenous people impacts and no indigenous people plan (IPP) is prepared. In the event that any indigenous people issues are identified during implementation, mitigation actions will be prepared in accordance with SPS, 2009, and the IPPF.

Stakeholder Communication, Participation, and Consultation

During Project Design
There are several consultation meetings and workshops during the preparation of the Project 2. International non-government organizations such as World Wide Fund office in India, International Union for Conservation of Nature office in India and dolphin experts were consulted during the preparation of the IEE.
During Project Implementation

Business Opportunities

Consulting Services
Consultants selected under Tranche 1 (Project 1)
Procurement
There are three civil works packages: (i) Gaya Water Supply Project 1; (ii) Gaya Water Supply Project 2; and (iii) Bhagalpur Water Supply Project 2.

Contact

Responsible ADB Officer
Vishal, Vivek
Responsible ADB Department
South Asia Department
Responsible ADB Division
India Resident Mission (INRM)
Executing Agencies
Urban Development and Housing Department, Government of Bihar

Timetable

Concept Clearance
-
Fact Finding
-
MRM
20 Jul 2017
Approval
04 Dec 2017
Last Review Mission
-
Last PDS Update
15 Dec 2021

Funding

Loan 3612-IND

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
04 Dec 2017 23 Feb 2018 17 Apr 2018 31 Dec 2021 28 Mar 2022 28 Jul 2022
Financing Plan
  Total (Amount in US$ million)
Project Cost 120.00
ADB 84.00
Counterpart 36.00
Cofinancing 0.00
Loan Utilization
  Date ADB Others Net Percentage
Cumulative Contract Awards 08 Mar 2023 34.10 0.00 100%
Cumulative Disbursements 08 Mar 2023 34.10 0.00 100%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating Satisfactory Satisfactory Satisfactory - Satisfactory -

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.


Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

Title Document Type Document Date
Bihar Urban Development Investment Program - Tranche 2: Gaya Water Supply Phase 2 (GWSP2) Subproject Updated Initial Environmental Examination Initial Environmental Examination Apr 2022
Bihar Urban Development Investment Program - Tranche 2: Gaya Water Supply Phase 1 (GWSP1) Subproject Updated Initial Environmental Examination Initial Environmental Examination Apr 2022
Bihar Urban Development Investment Program - Tranche 2: Bhagalpur Water Supply Phase 2 (BWSP2) Subproject Updated Initial Environmental Examination Initial Environmental Examination Apr 2022
Bihar Urban Development Investment Program - Tranche 2: Environmental Monitoring Report (January-June 2021) Environmental Monitoring Reports Nov 2021
Bihar Urban Development Investment Program - Tranche 2: Social Monitoring Report (July-December 2020) Social Monitoring Reports Oct 2021
Bihar Urban Development Investment Program - Tranche 2: Social Monitoring Report (January-June 2021) Social Monitoring Reports Oct 2021
Bihar Urban Development Investment Program - Tranche 2: Environmental Monitoring Report (July-December 2020) Environmental Monitoring Reports Aug 2021
Bihar Urban Development Investment Program - Tranche 2: Gaya Water Supply Project 2 (GWSP 2) Social Safeguards Due Diligence Report Safeguards Due Diligence Reports Aug 2021
Bihar Urban Development Investment Program - Tranche 2: Environmental Monitoring Report (January-June 2020) Environmental Monitoring Reports Aug 2021
Bihar Urban Development Investment Program - Tranche 2: Social Monitoring Report (January-June 2020) Social Monitoring Reports Nov 2020
Bihar Urban Development Investment Program - Tranche 2: Health and Safety Plan in Response to COVID-19 Pandemic Addendum to the Initial Environmental Examination Initial Environmental Examination Jun 2020
Bihar Urban Development Investment Program - Tranche 2: Environmental Monitoring Report (July-December 2019) Environmental Monitoring Reports May 2020
Bihar Urban Development Investment Program - Tranche 2: Environmental Monitoring Report (July-December 2018) Environmental Monitoring Reports May 2020
Bihar Urban Development Investment Program - Tranche 2: Environmental Monitoring Report (January-June 2019) Environmental Monitoring Reports May 2020
Bihar Urban Development Investment Program - Tranche 2: Social Monitoring Report (July-December 2019) Social Monitoring Reports Apr 2020
Bihar Urban Development Investment Program - Tranche 2: Social Monitoring Report (April-December 2018) Social Monitoring Reports Apr 2020
Bihar Urban Development Investment Program - Tranche 2: Social Monitoring Report (January-June 2019) Social Monitoring Reports Apr 2020
Bihar Urban Development Investment Program - Tranche 2: Gaya Water Supply Project 1 (GWSP1) Initial Environmental Examination Initial Environmental Examination May 2017
Bihar Urban Development Investment Program - Tranche 2: Gaya Water Supply Project 2 (GWSP2) Initial Environmental Examination Initial Environmental Examination May 2017
Bihar Urban Development Investment Program - Tranche 2: Environmental Assessment and Review Framework Environmental Assessment and Review Framework May 2017
Bihar Urban Development Investment Program - Tranche 2: Bhagalpur Water Supply Project 2 (BWSP2) Initial Environmental Examination Initial Environmental Examination May 2017
Bihar Urban Development Investment Program - Tranche 2: Resettlement Framework Resettlement Frameworks Apr 2017
Bihar Urban Development Investment Program - Tranche 2: Gaya Water Supply Project 1 (GWSP1) Resettlement Plan Resettlement Plans Apr 2017
Bihar Urban Development Investment Program - Tranche 2: Indigenous Peoples Planning Framework Indigenous Peoples Planning Frameworks/Indigenous Peoples Development Frameworks Apr 2017
Bihar Urban Development Investment Program - Tranche 2: Bhagalpur Water Supply Project 2 (BWSP2) Resettlement Plan Resettlement Plans Mar 2017

Evaluation Documents See also: Independent Evaluation

None currently available.


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
Institutional Development and Capacity Building Consultancy Services Firm - Consulting Closed
IND: Bihar Urban Development Investment Program (Project 2) Advance Notice Archived

Contracts Awarded

Contract Title Approval Number Contract Date Contractor | Address Executing Agency Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
COST OF RESTORATION OF ROADS MAINTAINED BY ROAD CONSTRUCTION DEPARTMENT GAYA AND SHERGHATI DIVISION. Loan 3612 21 Feb 2020 VARIOUS | VARIOUS INDIA Urban Development & Housing Dept, Gov't of Bihar 3,073,607.99 2,203,463.14
IMPROVEMENT OF WATER SUPPLY SYSTEM IN GAYA Loan 3612 23 Apr 2018 SHRIRAM EPC LIMITED | 1ST FLOR, RAJA ANNAMALAI BLDG, 18/3 RUKMINI LAKSHMIPATHY ST, EGMORE 600008 INDIA Urban Development & Housing Dept, Gov't of Bihar 47,422,590.00 34,111,216.00
WATER SUPPLY IMPROVEMENT IN GAYA-2 Loan 3612 23 Apr 2018 AQUA DESIGNS INDIA PVT LTD IN JV WITH RIL | OFF 200 FEET ROAD, KOLATHUR, CHENNAI 600099 INDIA Urban Development & Housing Dept, Gov't of Bihar 9,435,914.00 6,787,282.00

Procurement Plan

Title Document Type Document Date
Bihar Urban Development Investment Program - Tranche 2: Procurement Plan Procurement Plans Jan 2019