fbpx 42039-036: Power Transmission Investment Program - Tranche 3 | Asian Development Bank

Viet Nam: Power Transmission Investment Program - Tranche 3

Sovereign (Public) Project | 42039-036 Status: Active

The Asian Development Bank is working with Viet Nam to improve the transmission network to balance power loads in northern, central, and southern Viet Nam. The project is upgrading 500 kilovolt and 220 kilovolt transmission lines and improving the operational effectiveness and efficiency of the National Power Transmission Corporation.

 
Project Name Power Transmission Investment Program - Tranche 3
Project Number 42039-036
Country Viet Nam
Project Status Active
Project Type / Modality of Assistance Loan
Source of Funding / Amount
Loan 3374-VIE: Power Transmission Investment Program - Tranche 3
Ordinary capital resources US$ 231.31 million
Loan: Power Transmission Investment Program - Tranche 3
KfW Bankengruppe US$ 71.01 million
Strategic Agendas Inclusive economic growth
Drivers of Change Private sector development
Sector / Subsector

Energy / Electricity transmission and distribution

Gender Equity and Mainstreaming No gender elements
Description

The investment program will contribute to meeting electricity demand growth of industrial, commercial, and residential consumers in an economically and environmentally sustainable manner. The outcome of the investment program is enhanced capacity of the transmission network to balance power load. The investment program also supports partial implementation of National Power Sector Development Master Plan VII to meet growing electricity demand of industrial, commercial and residential consumers throughout Viet Nam, and improve the operational effectiveness and efficiency of the National Power Transmission Corporation (NPT)-the entity responsible for financing, managing and operating the transmission network to ensure reliable electricity supply.

Tranche 3 will finance part of each of the two outputs:

Output 1: Expanded Transmission Network (Physical investment)

Output 3: Project Implementation Support (Non-physical investment)

Project Rationale and Linkage to Country/Regional Strategy Recognizing the need to overcome current constraints in the power sector to ensure that rapidly growing electricity demand can be met in an economically and environmentally sustainable manner to sustain economic growth, the government of Viet Nam approved in 2011 the PDMP VII . With PDMP VII, the government approved multiple power generation and transmission projects to be implemented during 2011 -2020 and laid out a detailed road map and reform framework for (i) strengthening financial capacity, (ii) improving the operational performance of power sector entities, (iii) enhancing human resource capacity and development, (iv) improving the technological optimization and modernization of power sector infrastructure, and (v) enhancing energy efficiency in generation and consumption to sustainably develop and modernize Viet Nam''s power sector.
Impact meeting electricity demand growth of industrial, commercial and residential consumers throughout Viet Nam by 2025.
Project Outcome
Description of Outcome enhanced capacity of transmission network to balance power load.
Progress Toward Outcome Ongoing assessment.
Implementation Progress
Description of Project Outputs

Expanded Transmission Network

Improved Operational Effectiveness and Efficiency of NPT (deferred to tranche 4)

Project Implementation Support

Status of Implementation Progress (Outputs, Activities, and Issues)

The project will finance construction of 2 substations and 2 transmission lines as well as the extension of 5 existing substations located in southern Viet Nam.

500kV Duc Hoa Substation and connecting lines, and 500kV My Tho Duc Hoa Transmission Line are being constructed and expected to be completed in Q3/2019.

Upgrading of five (5) existing substations (500kV and 220kV) located in southern Viet Nam has been completed in accordance with international standards and code of conduct and these 5 substations have been put in operation.

220kV Binh Long - Tay Ninh Transmission Line subproject are under construction.

Among 3 packages under 500kV/220kV Chon Thanh Substation subproject, 2 equipment packages are under finalization of bidding documents by EA; bidding documents of the civil work package was issued on 23 August 2018 and expected to be awarded by December 2018.

Environmental and social safeguard reports, bidding documents of remaining packages are submitted in accordance with ADB requirements but with some delays.

Geographical Location Nation-wide
Safeguard Categories
Environment B
Involuntary Resettlement A
Indigenous Peoples B
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design A total of 1495 people (1,014 males and 481 females) directly affected by this Project were consulted in public meetings in district and commune centers in each the nine Subproject areas, including representatives of 17 out of 19 affected ethnic minority households. The opinions and suggestions of participants in the consultations, such as those pertaining to the restricted use of land within the right-of-way of transmission lines, were reflected in the RPs.
During Project Implementation
Business Opportunities
Consulting Services A total of 48 person-months through individual consultant selection will be engaged under Tranche 3. These project implementation support (safeguards) will be financed under ADB loan following ADB's Guidelines on the Use of Consultants (2013, as amended from time to time). The project implementation support who will handle construction management will be financed entirely by NPT.
Procurement

The documents that will govern all procurement actions of goods, works and services will include (i) the Financing Framework Agreement; (ii) the Loan and Project Agreement; (iii) ADB's Procurement Guidelines (2015, as amended from time to time) and ADB's Guidelines on the Use of Consultants (2013, as amended from time to time); and (iv) ADB's Standard Bidding Documents.

International Competitive Bidding procedures (ICB) will be used for civil works and goods contracts (except those to be procured through Direct Contracting). The estimated values of nearly all contracts exceed the ICB thresholds of $10.0 million (for civil works) and $2.0 million (for supply contracts). While the estimated values of several contracts fall slightly below these thresholds, ICB will be used for these contracts due to the Implementing Agencies' preference to use standardized Bidding Documents in the project. Therefore, National Competitive Bidding procedures (NCB) are not expected to be used. Qualification and eligibility requirements will be specified in the procurement plan and bidding documents.

In the event that any procurement is conducted through National Competitive Bidding, , before the start of the procurement, ADB and the Government will review the public procurement laws to ensure consistency with ADB's Procurement Guidelines. National Competitive Bidding procedures applicable to Viet Nam are attached with the Procurement Plan.

International shopping will be authorized for procurement of goods and works with a contract price equivalent of $100,000 or less.

Secondary equipment for expansion of existing 500 kV and 220 kV substations under operation using computerized control system (ST-G03 and ST-G04), may be procured on the basis of direct contracting or through shopping, as appropriate.

Where the equipment is procured directly, prior to such procurement, a list of individual items to be procured, an estimate of their costs, an indication of potential sources of supply and any related documents shall be submitted to ADB for approval. Unit rates for the equipment procured through direct contracting will be established on a valid, reasonable and verifiable basis. After award, three copies of each contract for such items shall be furnished to ADB.

Responsible ADB Officer Au Minh Tuan
Responsible ADB Department Southeast Asia Department
Responsible ADB Division Viet Nam Resident Mission
Executing Agencies
National Power Transmission Corporation
[email protected]
18 Tran Nguyen Han Street,
Hoan Kiem District, Hanoi-Vietnam
Ha Noi
Timetable
Concept Clearance -
Fact Finding -
MRM 15 Sep 2015
Approval 18 Dec 2015
Last Review Mission -
Last PDS Update 24 Sep 2018

Loan 3374-VIE

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
18 Dec 2015 06 Oct 2016 29 Dec 2016 30 Jun 2020 - -
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 307.69 Cumulative Contract Awards
ADB 231.31 18 Dec 2015 130.76 0.00 57%
Counterpart 76.38 Cumulative Disbursements
Cofinancing 0.00 18 Dec 2015 21.13 0.00 9%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating - Partly satisfactory - - - -

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Safeguard Documents See also: Safeguards

Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

Titlesort descending Document Type Document Date
Power Transmission Investment Program - Tranche 3: 220 kV Binh Long-Tay Ninh Transmission Line Additional Initial Environmental Examination Initial Environmental Examination Dec 2018
Power Transmission Investment Program - Tranche 3: 220 kV Binh Long-Tay Ninh Transmission Line Binh Phuoc Province Segment Resettlement and Ethnic Minority Development Plan Combined Resettlement Plan and Indigenous Peoples Plans Oct 2018
Power Transmission Investment Program - Tranche 3: 220 kV Binh Long-Tay Ninh Transmission Line Tay Ninh Province Segment Resettlement and Ethnic Minority Development Plan Combined Resettlement Plan and Indigenous Peoples Plans Oct 2018
Power Transmission Investment Program - Tranche 3: 220kV Duc Hoa Substation Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Mar 2015
Power Transmission Investment Program - Tranche 3: 220kV Duc Hoa Substation Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Apr 2019
Power Transmission Investment Program - Tranche 3: 220kV Uyen Hung Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: 500kV Chon Thanh Substation and 200kV Binh Long-Tay Ninh Transmission Line Subprojects Social Monitoring Report (January-June 2018) Social Monitoring Reports Aug 2019
Power Transmission Investment Program - Tranche 3: 500kV Chon Thanh Substation and 200kV Binh Long-Tay Ninh Transmission Line Subprojects Social Monitoring Report (January-June 2018) Social Monitoring Reports Jun 2018
Power Transmission Investment Program - Tranche 3: 500kV Chon Thanh Substation and 220kV Binh Long-Tay Ninh Transmission Line Social Monitoring Report (July-December 2018) Social Monitoring Reports Dec 2018
Power Transmission Investment Program - Tranche 3: 500kV Chon Thanh Substation and 220kV Binh Long-Tay Ninh Transmission Line Social Monitoring Report (July-September 2018) Social Monitoring Reports Sep 2018
Power Transmission Investment Program - Tranche 3: 500kV Chon Thanh Substation and 220kV Binh Long-Tay Ninh Transmission Line Social Monitoring Report (March-June 2018) Social Monitoring Reports Jun 2018
Power Transmission Investment Program - Tranche 3: Ba Ria-Vung Tau Transmission Line Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports May 2015
Power Transmission Investment Program - Tranche 3: Binh Long-Tay Ninh Transmission Line (Binh Phuoc Segment) Draft Combined Resettlement and Ethnic Minority Development Plan Combined Resettlement Plan and Indigenous Peoples Plans Jun 2015
Power Transmission Investment Program - Tranche 3: Binh Long-Tay Ninh Transmission Line (Tay Ninh Segment) Draft Combined Resettlement and Ethnic Minority Development Plan Combined Resettlement Plan and Indigenous Peoples Plans Jun 2015
Power Transmission Investment Program - Tranche 3: Binh Long-Tay Ninh Transmission Line Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: Cau Bong Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: Cau Bong Substation Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Mar 2015
Power Transmission Investment Program - Tranche 3: Chon Thanh Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: Chon Thanh Substation Draft Resettlement Plan Resettlement Plans Jun 2015
Power Transmission Investment Program - Tranche 3: Corrective Action Plan Performance Monitoring Report (March-June 2017) Social Monitoring Reports Jun 2017
Power Transmission Investment Program - Tranche 3: Duc Hoa 220kV Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: Duc Hoa 500kV Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: Duc Hoa 500kV Substation Draft Resettlement Plan Resettlement Plans Jun 2015
Power Transmission Investment Program - Tranche 3: Duc Hoa Substation and Connections Resettlement Monitoring Report (March-June 2017) Social Monitoring Reports Jun 2017
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (April-June 2017) Environmental Monitoring Reports Jul 2017
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (April-June 2018) Environmental Monitoring Reports Jan 2019
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (January-March 2017) Environmental Monitoring Reports Mar 2017
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (July-September 2018) Environmental Monitoring Reports Feb 2019
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (July–December 2017) Environmental Monitoring Reports Jun 2018
Power Transmission Investment Program - Tranche 3: My Tho Substation Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Jun 2015
Power Transmission Investment Program - Tranche 3: My Tho-Duc Hoa Transmission Line (Long An Segment) Draft Resettlement Plan Resettlement Plans Jun 2015
Power Transmission Investment Program - Tranche 3: My Tho-Duc Hoa Transmission Line (Tien Giang Segment) Draft Resettlement Plan Resettlement Plans Jun 2015
Power Transmission Investment Program - Tranche 3: My Tho-Duc Hoa Transmission Line Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: My Tho-Duc Hoa Transmission Line Resettlement Monitoring Report (March-June 2017) Social Monitoring Reports Jun 2017
Power Transmission Investment Program - Tranche 3: Resettlement Monitoring Report (January-June 2017) Social Monitoring Reports Jul 2017
Power Transmission Investment Program - Tranche 3: Social Monitoring Report (January-June 2018) Social Monitoring Reports Apr 2019
Power Transmission Investment Program - Tranche 3: Social Monitoring Report (July-December 2018) Social Monitoring Reports Apr 2019
Power Transmission Investment Program - Tranche 3: Social Monitoring Report (July-September 2017) Social Monitoring Reports Jan 2019
Power Transmission Investment Program - Tranche 3: Tay Ninh Substation Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Jun 2015
Power Transmission Investment Program - Tranche 3: Tra Vinh Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: Tra Vinh Substation Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Mar 2015
Power Transmission Investment Program - Tranche 3: Uyen Hung Substation Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Mar 2015
Power Transmission Investment Program - Tranche 3: Vung Tau Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: Vung Tau Substation Draft Resettlement Plan Resettlement Plans Jun 2015
Power Transmission Investment Program - Tranche 3: Vung Tau Substation Resettlement Monitoring Report (March-June 2017) Social Monitoring Reports Jun 2017
Power Transmission Investment Program Tranche 3: 220kV Binh Long–Tay Ninh Transmission Line Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: 220kV Duc Hoa Substation Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: 500kV Chon Thanh Substation and 220 kV and 500 kV Connections Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: 500kV Duc Hoa Substation and Connections Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: 500kV My Tho–Duc Hoa Transmission Line Initial Environmental Examination Initial Environmental Examination Nov 2015
Power Transmission Investment Program Tranche 3: Second Transformer Bank for 220 kV Tra Vinh Substation Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: Second Transformer Bank for 220 kV Uyen Hung Substation Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: Second Transformer Bank for 220 kV Vung Tau Substation Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: Second Transformer Bank for 500kV Cau Bong Substation Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program – Tranche 3: 500 kV My Tho–Duc Hoa Transmission Line (Long An Province Segment) Updated Resettlement Plan Resettlement Plans Dec 2018
Power Transmission Investment Program – Tranche 3: 500 kV My Tho–Duc Hoa Transmission Line (Long An Province Segment) Updated Resettlement Plan Resettlement Plans Feb 2019
Power Transmission Investment Program – Tranche 3: 500 kV My Tho–Duc Hoa Transmission Line (Long An Province Segment-Ben Luc District) Resettlement Plan Resettlement Plans Mar 2019
Power Transmission Investment Program – Tranche 3: Environmental Monitoring Report (January-March 2018) Environmental Monitoring Reports Jul 2018
Power Transmission Investment Program – Tranche 3: Environmental Monitoring Report (January-March 2019) Environmental Monitoring Reports Jul 2019
Power Transmission Investment Program – Tranche 3: Environmental Monitoring Report (October-December 2018) Environmental Monitoring Reports Mar 2019
Power Transmission Investment Program – Tranche 3: My Tho- Duc Hoa Transmission Line Updated Resettlement Plan Resettlement Plans Nov 2018
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (April-June 2018) Social Monitoring Reports Jul 2018
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (January-June 2018) Social Monitoring Reports Mar 2019
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (January-June 2018) Social Monitoring Reports Jul 2018
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (January-March 2018) Social Monitoring Reports Apr 2018
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (January-March 2019) Social Monitoring Reports May 2019
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (July-December 2017) Social Monitoring Reports Mar 2019
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (July-December 2017) Social Monitoring Reports Dec 2018
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (July-December 2018) Social Monitoring Reports Mar 2019
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (July-September 2018) Social Monitoring Reports Mar 2019
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (October-December 2017) Social Monitoring Reports Mar 2019
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (October-December 2018) Social Monitoring Reports Mar 2019

Evaluation Documents See also: Independent Evaluation

None currently available.

Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
3374-VIE: Power Transmission Investment Program - Tranche 3[DH-G13: Supply of steel towers for transmission line of 500kV Duc Hoa substation and connections.] Invitation for Bids Closed 22 Mar 2017 04 May 2017
3374-VIE: Power Transmission Investment Program, Tranche 3 [BLTN-G02] Invitation for Bids Closed 12 Jul 2017 23 Aug 2017
3374-VIE: Power Transmission Investment Program, Tranche 3 [CT-G01] Invitation for Bids Closed 27 Sep 2018 09 Nov 2018
3374-VIE: Power Transmission Investment Program, Tranche 3 [CT-G02] Invitation for Bids Closed 27 Sep 2018 09 Nov 2018
3374-VIE: Power Transmission Investment Program, Tranche 3 [CT-W01] Invitation for Bids Closed 23 Aug 2018 04 Oct 2018
42039-036 -Power Transmission Investment Program, Tranche 3 Advance Notice Archived 14 Sep 2016
L3374-VIE: MFF Power Transmission Investment Program, Tranche 3 [MTDH-G07] Invitation for Bids Closed 22 May 2017 04 Jul 2017
L3374-VIE: Power Transmission Investment Program - Tranche 3[ADB-SPMB/DH-G11/IFB: Supply of Power transformer for Project: 500kV Duc Hoa substation and Connections.] Invitation for Bids Closed 04 May 2017 16 Jun 2017
L3374-VIE: Power Transmission Investment Program - Tranche 3[ST-G01 (CB): Supply of 500kV Auto-transformer for 500kV Cau Bong Substation.] Invitation for Bids Closed 31 Mar 2017 11 May 2017
L3374-VIE: MFF Power Transmission Investment Program Tranche 3 [DH-G14] Invitation for Bids Closed 03 Aug 2017 15 Sep 2017
L3374-VIE: MFF Power Transmission Investment Program, Tranche 3 [ADB-SPMB/DH-G12&SHDH-G17/IFB] Invitation for Bids Closed 18 Sep 2017 31 Oct 2017
L3374-VIE: MFF Power Transmission Investment Program, Tranche 3 [BLTN-G01] Invitation for Bids Closed 06 Jun 2017 19 Jul 2017
L3374-VIE: MFF Power Transmission Investment Program, Tranche 3 [DH-W16] Invitation for Bids Closed 01 Jun 2017 13 Jul 2017
L3374-VIE: MFF Power Transmission Investment Program, Tranche 3 [DH-W17] Invitation for Bids Closed 01 Jun 2017 13 Jul 2017
L3374-VIE: MFF Power Transmission Investment Program, Tranche 3 [DH-W18] Invitation for Bids Closed 01 Jun 2017 13 Jul 2017
L3374-VIE: Power Transmission Investment Program, Tranche 3 [BLTN-W01] Invitation for Bids Closed 25 May 2017 06 Jul 2017
National Safeguard Specialist for Resettlement (new) Individual - Consulting Closed 01 Jun 2018 10 Jun 2018

Contracts Awarded

Contract Title Approval Number Contract Date Contractor Contractor Address Executing Agency Contract Description Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
4 ICS Contracts: National Safeguard Specialist (Environment), National Safeguard Specialists (Resettlement), Independent Monitoring Experts (Resettlement) Loan 3374 21 Jun 2017 Various Various, Viet Nam, Soc Rep of National Power Transmission Corporation Consulting Services 243,413.00 243,006.00
BLTN-G01: SUPPLY AND TRANSPORATION OF STEEL TOWERS FOR 220KV BINH LONG - TAY NINH TRANSMISSION LINE Loan 3374 14 Dec 2017 THANH LONG GROUP JOINT STOCK COMPANY VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation SUPPLY OF GOODS 4,966,759.00 4,516,428.00
BLTN-G02: SUPPLY AND TRANSPORTATION OF PRIMARY EQU IPMENT, CONDUCTORS, EARTH-WIRES, INSULATORS, OPGW AND FITTINGS. Loan 3374 27 Mar 2018 VARIOUS VARIOUS VIET NAM,SOC REP OF National Power Transmission Corporation SUPPLY OF GOODS 4,462,361.00 4,443,653.00
BLTN-W01 PACKAGE: CONSTRUCTION OF 220KV BINH LONG- TAY NINH TRANSMISSION LINE AND BAY EXTENSION Loan 3374 27 Dec 2017 POWER CONSTRUCTION JOINT STOCK COMPANY 1 VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation CONSTRUCTION 9,331,147.00 8,483,608.00
CT-W01: CONSTRUCTION AND INSTALLATION OF TRANSMISS ION LINE (INCLUDING SUPPLY OF STEEL TOWERS)-LOT1.2 Loan 3374 16 Nov 2018 SONG DA 11 THANG LONG ONE MEMBER CO. LTD. BT3, VT24, XA LA RESIDENTIAL AREA, PHUC LA WARD, HA DONG DISTRICT, HANOI VIET NAM,SOC REP OF National Power Transmission Corporation CONSTRUCTION 4,138,938.00 3,760,410.00
CT-W01: CONSTRUCTION AND INSTALLATION SUBSTATION F O THE 500KV CHON THANH SUBSTATION AND CONNECTIONS SUBPROJECT - LOT 1.1 Loan 3374 16 Nov 2018 POWER CONSTRUCTION JSC NO. 1 18 LY VAN PHUC STREET, DONG DA DISTRICT, HANOI VIET NAM,SOC REP OF National Power Transmission Corporation CONSTRUCTION 9,522,992.00 8,652,065.00
CW-01/Construction of Greenfield 6-Lane Extradosed Cable Bridge Over River Ganga Near Kachchi Dargah, Patna on NH30 to Near Bidupur, Vaishali, NH103 Loan 3374 31 Mar 2017 JV Song Da No 11 JSC-Iec JSC-Inco JSC Ha Noi, Vietnam Viet Nam National Power Transmission Corporation Construction 6,506,200.60 5,942,905.61
DH W17: CONSTRUCTION OF 220KV TRANSMISSION LINE NO 1 FOR 500KV DUC HOA SUBSTATION AND CONNECTIONS SU BPROJECT Loan 3374 27 Dec 2017 JV: IEC - INCO - RECO JOINT VENTURE VIETNAM VIET NAM,SOC REP OF VIET NAM,SOC REP OF National Power Transmission Corporation CONSTRUCTION 6,318,287.00 5,744,404.00
DH-G11: SUPPLY OF STEEL TOWERS FOR 500KV DUC HOA S UBSTATION AND CONNECTIONS SUB-PROJECT Loan 3374 31 Oct 2017 CONSORTIUM OF HYUNDAI ELECTRIC & ENERGY SYSTE KOREA KOREA, REPUBLIC OF National Power Transmission Corporation SUPPLY OF GOODS 4,069,728.00 4,069,728.00
DH-G12&SHDH-G17: SUPPLY PRIMARY EQUIPMENT; SUPPLY AND INSTALLATION CONTROL SYSTEM, PROTECTION SYSTEM , AND MEASUREMENT SYSTEM, COMMUNICATION SYSTEM Loan 3374 29 Mar 2018 CONSORTIUM SIEMENS - EDH VIET NAM VIET NAM,SOC REP OF National Power Transmission Corporation SUPPLY OF GOODS 7,382,917.00 7,087,121.00
DH-G13: SUPPLY OF STEEL TOWERS FOR TRANSMISSION LINE 500KV DUC HOA SUBSTATION AND CONNECTIONS LOT 3 Loan 3374 28 Aug 2017 M/S RUSTUM ASSOCIATES-DYNAMIC CONST(RA-DC-JV) HOUSE 258, STREET NO 1 JINNAHABAD ABBOTT ABAD PAKISTAN Ministry of Kashmir Affairs and Northern Areas SUPPLY OF GOODS 3,185,994.00 2,897,123.00
DH-G13: Supply of Steel Towers for Transmission Line 500kV Duc Hoa Substation and Connections Lot 1 and 2 Loan 3374 25 Aug 2017 JV OF HA HUY-VIWASEEN-VINACONEX 12 NO.18- DUY TAN STREET- HUNG DUNG WARD- V INH CITY- NGHE AN PROVINCE VIET NAM,SOC REP OF Quang Nam Wter Supply&Drainage Joint Stock Company SUPPLY OF GOODS 5,385,296.00 4,894,215.00
DH-G14: SUPPLY OF CONDUCTORS, EARTHWIRES, INSULATO RS, OPGW AND ACCESSORIES FOR 220KV - 500KV TRANSMI SSION LINES Loan 3374 22 Dec 2017 THIPHA - CADIVI CONSORTIUM VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation CONSTRUCTION 5,494,399.00 5,140,502.00
DH-W15: Construction of 500Kv Duc Hoa Substation (Including Firefighting System, Primary and Secondary Testing and Commissioning) Loan 3374 17 May 2017 Vietnam Electricity Construction JSC Da Nang, Viet Nam, Soc Rep of National Power Transmission Corporation Construction 9,502,995.00 8,627,674.00
DH-W16: CONSTRUCTION OF 500KV TRANSMISSION LINE FO R 500KV DUC HOA SUBSTATION AND CONNECTIONS SUBPROJ ECT Loan 3374 27 Dec 2017 JV: PACIFIC-LICOGI 16 VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation CONSTRUCTION 5,478,249.00 4,980,665.00
DH-W18: CONSTRUCTION OF 220KV TRANSMISSION LINE NO 2 FOR 500KV DUC HOA SUBSTATION AND CONNECTIONS SU BPROJECT- LOT 1 Loan 3374 27 Dec 2017 VNECO VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation CONSTRUCTION 4,939,013.00 4,490,408.00
DH-W18: CONSTRUCTION OF 220KV TRANSMISSION LINE NO 2 FOR 500KV DUC HOA SUBSTATION AND CONNECTIONS SU BPROJECT- LOT 2 Loan 3374 27 Dec 2017 SONG DA 11 VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation CONSTRUCTION 5,356,649.00 4,870,110.00
MDTH-W08 Lot 1: Construction of Transmission Line from 500KV My Tho Substation to Position 56 (Including Extension Bays at 500KV My Tho Substation Loan 3374 31 Mar 2017 JV: Pcc1-Alp Hanoi, Viet Nam Viet Nam National Power Transmission Corporation Construction 736,637.87 672,477.09
MTDH-G06: Supply of Steel Towers for 500Kv My Tho - Duc Hoa Transmission Line Sub-Project Loan 3374 21 Jun 2017 Steel Structure Manufacture JSC Vneco.ssm Da Nang, Viet Nam, Soc Rep of National Power Transmission Corporation Supply of Goods 5,127,117.00 4,174,538.00
MTDH-G07: SUPPLY OF CONDUCTORS, EARTHWIRES, INSULA TORS, OPGW, FITTINGS FOR 220KV AND 500KV CONNECTIO NS AND PRIMARY EQUIPMENT Loan 3374 21 Feb 2018 CONSORTIUM COMIN ASIA PTE., LTD. / COMIN VN SINGAPORE SINGAPORE National Power Transmission Corporation SUPPLY OF GOODS 6,878,764.00 6,841,236.00
MTDH-W08 Lot 2: Construction of Transmission Line 500KV My Tho - Duc Hoa Transmission Line Loan 3374 24 Feb 2017 E.Licogi16-Licogi16 Hanoi, Vietnam Viet Nam National Power Transmission Corporation Construction 1,265,323.99 1,152,818.22
ST-G01: SUPPLY OF 5000KV AUTO-TRANSFORMERS FOR 500 KV CAU BONG SUBSTATIONS Loan 3374 31 Oct 2017 HYUNDAI ELECTRIC & ENERGY SYSTEM CO., LTD AND KOREA KOREA, REPUBLIC OF National Power Transmission Corporation SUPPLY OF GOODS 3,852,680.00 3,852,680.00
ST-G02: Supply of Primary Equipment for 5 Substations: Extension of 500Kv Cau Bong, 220Kv Vung Tau, 220Kv Tra Vinh, 220Kv Duc Hoa and 220Kv Uyen Hung Loan 3374 21 Jun 2017 Comin Asia Pte Ltd and Comin Vietnam Ltd Singapore and Viet Nam, Soc Rep of National Power Transmission Corporation Supply of Goods 2,066,808.00 2,012,825.00
ST-G03: INSTALLATION OF 2ND TRANSFORMERS 500KV CAU BONG SUBSTATION, 220KV DUC HOA SUBSTATION, AND 220KV VUNG TAU SUBSTATION Loan 3374 25 Aug 2017 M/S RUSTUM ASSOC-DYNAMIC CONST (RA-DC-JV) HOUSE 258, STREET NO 1 JINNAHABAD ABBOTT ABAD PAKISTAN Ministry of Kashmir Affairs and Northern Areas SUPPLY OF GOODS 1,285,909.00 1,194,646.00
ST-W02: Construction for Extension of Vung Tau, Tra Vinh, Duc Hoa, Uyen Hung 220KV Substation Loan 3374 24 Feb 2017 Joint Venture Pcc1-Vneco-Thai Binh Duong Vietnam Viet Nam National Power Transmission Corporation Construction 7,623,034.33 6,864,653.56
ST-W02: Construction for Extension of Vung Tau, Tra Vinh, Duc Hoa, Uyen Hung 220KV Substations Loan 3374 24 Feb 2017 Toshiba Transmission and Distribution Systems ( Vn Viet Nam National Power Transmission Corporation Supply of Goods 790,238.49 711,621.28

Procurement Plan