Project Name | Preparing Kolkata Environmental Improvement Project Phase II | ||||
Project Number | 42266-012 | ||||
Country / Economy | India |
||||
Project Status | Closed | ||||
Project Type / Modality of Assistance | Technical Assistance |
||||
Source of Funding / Amount |
|
||||
Strategic Agendas | Environmentally sustainable growth Inclusive economic growth |
||||
Drivers of Change | Governance and capacity development |
||||
Sector / Subsector | Water and other urban infrastructure and services / Urban sewerage - Urban water supply |
||||
Gender | No gender elements | ||||
Description | |||||
Project Rationale and Linkage to Country/Regional Strategy | India?s 11th Five Year Plan (FYP; April 2007 to March 2012) has set out 27 national targets, covering both economic and social goals which include: (i) clean drinking water to be available to all by 2009, ensuring that there are no slip-backs by the end of the 11th FYP; and (ii) to treat all urban wastewater by 2011?12 to clean the river waters. Also, the 11th FYP recognizes infrastructure bottlenecks and lack of long-term funds for infrastructure investment as the binding constraints for achieving the goals. The 11th FYP calls for public sector investment in meeting the infrastructure requirements where private participation is unlikely to be forthcoming. The Country Partnership and Strategy (CPS) and ADB?s assistance program for 2009?2011 have been designed to support the Government of India?s efforts to address the binding constraints in the 11th FYP through four strategic pillars. One of the strategic pillars puts emphasis on the continuation of ADB?s assistance to infrastructure development in various sectors, including urban. The proposed sovereign loan for expansion of sewerage system under the Kolkata Environmental Improvement Project (the Project) Phase 2 will directly contribute to the national target for full treatment of urban wastewater, while implicitly addressing the environmental consequences of drinking water to be available for all. |
||||
Impact | Sewerage from 66% of households (about 1 million households) in the Kolkata metropolitan area collected and treated, and risks of flood minimized. |
Project Outcome | |
---|---|
Description of Outcome | Design of the Kolkata Environmental Improvement Project Phase II agreed among ADB, EA and stakeholders. |
Progress Toward Outcome | |
Implementation Progress | |
Description of Project Outputs | 1. Revised systemic design and costing of the Project Phase II by end November 2009; 2. Revised economic and financial analysis by end December 2009; 3. Improved safeguards planning documents by end March 2010; 4. Study visit to JICA-financed Delhi Mass Rapid Trasport System before December 2009; and 5. Results of underground utility survey in the Project Phase 2 areas by December 2010. |
Status of Implementation Progress (Outputs, Activities, and Issues) | |
Geographical Location |
Summary of Environmental and Social Aspects | |
---|---|
Environmental Aspects | |
Involuntary Resettlement | |
Indigenous Peoples | |
Stakeholder Communication, Participation, and Consultation | |
During Project Design | |
During Project Implementation |
Business Opportunities | |
---|---|
Consulting Services | ADB will engage four individual consultants (total of 20 person-months) in accordance with ADB's Guidelines on the Use of Consultants (2007 as amended from time to time). 1. Sewerage and Drainage Engineer, National (4.0 pm); 2. Social Development and Safeguards Spec., National (8.0 pm); 3. Urban Economist, National (4.0 pm); and 4. Chartered Accoutant, National (4.0 pm). |
Responsible ADB Officer | Ikemoto, Hiroyuki |
Responsible ADB Department | South Asia Department |
Responsible ADB Division | Urban Development and Water Division, SARD |
Executing Agencies |
Calcutta Municipal Corporation |
Timetable | |
---|---|
Concept Clearance | 08 May 2009 |
Fact Finding | 20 May 2009 to 25 May 2009 |
MRM | - |
Approval | 07 Aug 2009 |
Last Review Mission | - |
PDS Creation Date | 04 Jun 2009 |
Last PDS Update | 05 Aug 2011 |
TA 7327-IND
Milestones | |||||
---|---|---|---|---|---|
Approval | Signing Date | Effectivity Date | Closing | ||
Original | Revised | Actual | |||
07 Aug 2009 | 06 Aug 2010 | 06 Aug 2010 | 31 Jan 2011 | 30 Oct 2012 | 30 Nov 2012 |
Financing Plan/TA Utilization | Cumulative Disbursements | |||||||
---|---|---|---|---|---|---|---|---|
ADB | Cofinancing | Counterpart | Total | Date | Amount | |||
Gov | Beneficiaries | Project Sponsor | Others | |||||
400,000.00 | 0.00 | 290,000.00 | 0.00 | 0.00 | 0.00 | 690,000.00 | 17 Jun 2022 | 257,567.22 |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Title | Document Type | Document Date |
---|---|---|
Preparing Kolkata Environmental Improvement Project Phase II | Consultants' Reports | Mar 2012 |
Preparing for Kolkata Environmental Improvement Project II | Initial Poverty and Social Analysis | Aug 2009 |
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
None currently available.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
Contracts Awarded
Procurement Plan
None currently available.