Bangladesh : Strengthening the Resilience of the Water Sector in Khulna to Climate Change
Bangladesh is considered one of the countries most adversely affected by climate change. Not only geographic features represented by vast low-lying areas along Ganges-Brahmaputra-Meghna deltas, but socio-economic status such as inadequate infrastructure, low level of social development, lack of institutional capacity and a high dependency on natural resources make the country more vulnerable to climate stimuli. Though Bangladesh has made steady progress in terms of social and economic development and poverty alleviation, the country as a whole, and in particular poorer communities, could suffer the earliest and most from climate change impacts, negating these past achievements. Therefore, strengthening resilience to climate change is central to the development and poverty reduction agenda.
Project Details
-
Project Officer
Saito, Norio
South Asia Department
Request for information -
Country/Economy
Bangladesh -
Modality
-
Sector
- Agriculture, natural resources and rural development
| Project Name | Strengthening the Resilience of the Water Sector in Khulna to Climate Change | ||||
| Project Number | 42469-012 | ||||
| Country / Economy | Bangladesh |
||||
| Project Status | Closed | ||||
| Project Type / Modality of Assistance | Technical Assistance |
||||
| Source of Funding / Amount |
|
||||
| Strategic Agendas | Environmentally sustainable growth Inclusive economic growth |
||||
| Drivers of Change | Governance and capacity development Partnerships |
||||
| Sector / Subsector | Agriculture, natural resources and rural development / Water-based natural resources management |
||||
| Gender | No gender elements | ||||
| Description | |||||
| Project Rationale and Linkage to Country/Regional Strategy | Bangladesh is considered one of the countries most adversely affected by climate change. Not only geographic features represented by vast low-lying areas along Ganges-Brahmaputra-Meghna deltas, but socio-economic status such as inadequate infrastructure, low level of social development, lack of institutional capacity and a high dependency on natural resources make the country more vulnerable to climate stimuli. Though Bangladesh has made steady progress in terms of social and economic development and poverty alleviation, the country as a whole, and in particular poorer communities, could suffer the earliest and most from climate change impacts, negating these past achievements. Therefore, strengthening resilience to climate change is central to the development and poverty reduction agenda. Khulna, the third-largest city in Bangladesh, is located on the banks of the Rupsha and Bhairab rivers in the southwest of the country, where the consequences of climate change are expected to be particularly severe. It had a population of 1.4 million in 2007 in an area of 46 square kilometers (km2). The present water supply to Khulna is mainly from groundwater sources drawn from both deep and shallow tube wells. To cope with current insufficient supply and increasing demand, the Khulna Water Supply and Sewerage Authority (KWASA) plans to construct a new treatment plant for surface water with assistance from ADB and the Japan International Cooperation Agency. The increase in salinity in Khulna started after the commencement in 1975 of the Farakka Barrage operation in India, which significantly reduced the flow of the Ganges upstream of the Gorai River, a major source of freshwater to the rivers surrounding Khulna. Salinity near Khulna recorded in 2007 its highest level for the past 32 years. Sea level rise and prolonged dry weather are expected to further drive up salinity levels in Khulna. Therefore, future investments in water supply, such as the construction of water intake and treatment plants, need to incorporate climate change risks into their design. As groundwater is currently the major source of water in the area, assessing groundwater resources, including the possibility of salinity intrusion in the aquifer, needs to be done. Khulna currently suffers recurring and worsening waterlogging problems. The situation could be further exacerbated by increased rainfall and sea level rise. Careful assessments need to be undertaken on the extent of the impacts, on the bases of which appropriate response mechanisms need to be developed. ADB?s country operations business plan for Bangladesh (2009-2011) identifies two planned projects in Khulna: the City Region Development Project (PPTA in 2008 and loan in 2010) and the Khulna Water Supply Project (PPTA in 2010 and loan [standby] in 2011). Considering likely climate change impacts in Khulna, future investment projects in the water sector (e.g., water supply and drainage) need to be climate proof. Therefore, the TA will assess the impacts of climate change on drainage, water availability, and salinity and recommend practical and effective options for such matters as the location of water intake works and the appropriate design of the drainage system. Structural and other options will be identified in the TA and prioritized in a participatory manner. The output of the TA will be reflected in the design of these future projects and other Government interventions. |
||||
| Impact | Strengthened resilience of water sector to climate change impacts in Khulna. | ||||
| Project Outcome | |
|---|---|
| Description of Outcome | Adaptation options, both structural and non-structural, prepared for two planned investment projects: City Region Development Project and Khulna Water Supply Project, and other projects and policy actions by the Government of Bangladesh. |
| Progress Toward Outcome | Adaptation options, both structural and not, have been prepared for two planned investment projects - City Region Development Project and Khulna Water Supply Project. |
| Implementation Progress | |
| Description of Project Outputs | The TA will be implemented in three steps. The first step will involve (i) data collection related to hydro-meteorology, water salinity and outputs of various modeling results and analyses in Khulna and relevant areas; and (ii) assessment of plausible climate scenarios for 2030 and 2050. In the second step, the TA team will undertake (i) data collection and review of existing structures and future improvement plans in the water sector; (ii) collection of socio-economic data such as population density, population trend and damages caused by past extreme weather events and data related to physical characteristics such as topography, land use and land subsidence; (iii) review of land use plans and policies and current local practices coping with climate variability and extreme weather events (such as early warning system and evacuation); and (iv) hydrological simulation and assessment of flooding, water salinity and other impacts on the water sector by using mathematical modeling. Assessment results will be presented in the GIS based map. Tasks conducted in the third step will comprise (i) identification of adaptation options, both structural and non-structural, focusing on the water sector; (ii) assessment of preliminary feasibility of each option, with due considerations to effectiveness, urgency, associated benefits and costs and social acceptability, and identification of relevant agencies responsible for implementation; (iii) prioritization of preferred options through a participatory approach; and (iv) integration of priority actions into project designs of future ADB-assisted projects or other projects and policy actions by the Government. The TA will also focus on strengthening capacity and raising awareness for climate change. Workshops and other training programs will be carried out mainly for officials of central and local government departments and agencies. Other key stakeholders, such as universities, research institutes, NGOs and the private sector are invited to the workshops, where objectives, progress and outputs of the TA will be shared and discussions for prioritizing various adaptation options will be made. Based on the experiences of the TA implementation, recommendations for further programs on capacity building and public awareness raising and for up-scaling/replicating in other areas in Bangladesh and other countries will be provided. |
| Status of Implementation Progress (Outputs, Activities, and Issues) | The TA was implemented as planned. Climate change and socio-economic development scenarios for 2030 and 2050 were developed. Three hydraulic models (southwest region model, salinity model, and urban drainage model) were also developed, and ithe mpacts of climate and socio-economic changes on river salinity, the source of surface water supply, and urban drainage system were assessed. Adaptation options were then identified and evaluated. Capacity building programs were undertaken. The final report was submitted in August 2010. A report based on the TA findings was published in April 2011. The TA was completed in June 2011 and is under process of financial closing. |
| Geographical Location | |
| Summary of Environmental and Social Aspects | |
|---|---|
| Environmental Aspects | |
| Involuntary Resettlement | |
| Indigenous Peoples | |
| Stakeholder Communication, Participation, and Consultation | |
| During Project Design | From the onset, consultation will be conducted with a wide range of stakeholders, namely central and local government departments and agencies, universities, research institutes, NGOs, representatives of communities and the private sector. |
| During Project Implementation | |
| Business Opportunities | |
|---|---|
| Consulting Services | To be determined. |
| Responsible ADB Officer | Saito, Norio |
| Responsible ADB Department | South Asia Department |
| Responsible ADB Division | Urban Development and Water Division, SARD |
| Executing Agencies |
Local Govt Div,Min of Local Govt Rural Devt & Coop Mr. Monzur Hossain [email protected] Building No. 7, Room No. 602, Bangladesh Secretariat, Dhaka-1000 Local Govt Div,Min of Local Govt Rural Devt & Coop Bangladesh Secretariat Dhaka |
| Timetable | |
|---|---|
| Concept Clearance | 30 Sep 2008 |
| Fact Finding | 11 Oct 2008 to 18 Oct 2008 |
| MRM | - |
| Approval | 10 Dec 2008 |
| Last Review Mission | - |
| PDS Creation Date | 28 Oct 2008 |
| Last PDS Update | 29 Jul 2011 |
TA 7197-BAN
| Milestones | |||||
|---|---|---|---|---|---|
| Approval | Signing Date | Effectivity Date | Closing | ||
| Original | Revised | Actual | |||
| 10 Dec 2008 | 10 Feb 2009 | 10 Feb 2009 | 31 Dec 2009 | 30 Jun 2011 | 31 Aug 2011 |
| Financing Plan/TA Utilization | Cumulative Disbursements | |||||||
|---|---|---|---|---|---|---|---|---|
| ADB | Cofinancing | Counterpart | Total | Date | Amount | |||
| Gov | Beneficiaries | Project Sponsor | Others | |||||
| 600,000.00 | 0.00 | 120,000.00 | 0.00 | 0.00 | 0.00 | 720,000.00 | 17 Jun 2022 | 496,554.93 |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
| Title | Document Type | Document Date |
|---|---|---|
| Strengthening the Resilience of the Water Sector in Khulna to Climate Change | TA Completion Reports | Jan 2012 |
| Strengthening the Resilience of the Water Sector in Khulna to Climate Change | Consultants' Reports | Aug 2010 |
| Strengthening the Resilience of the Water Sector in Khulna to Climate Change (Financed by the Climate Change Fund) | Technical Assistance Reports | Dec 2008 |
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
None currently available.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
Contracts Awarded
Procurement Plan
None currently available.

