India : Advanced Project Preparedness for Poverty Reduction - Updating Load Forecast and Power System Master Plan for Assam
This proposed TA Cluster subproject which would be in the nature of capacity development technical assistance (CDTA) would update the electricity demand forecast and develop a power system master plan for Assam power sector. The master plan will also consider the transmission capacity requirement of the neighboring states in NER. This will be the basis of the investment program for the MFF for Assam power proposed for 2014, and thus facilitate the completion of design, cost estimates and due diligence for project processing.
Project Details
-
Project Officer
Yusupov, Aziz A.
South Asia Department
Request for information -
Country/Economy
India -
Modality
-
Sector
- Energy
Related Projects
Project Name | Advanced Project Preparedness for Poverty Reduction - Updating Load Forecast and Power System Master Plan for Assam | ||||
Project Number | 43166-209 | ||||
Country / Economy | India |
||||
Project Status | Closed | ||||
Project Type / Modality of Assistance | Technical Assistance |
||||
Source of Funding / Amount |
|
||||
Strategic Agendas | Inclusive economic growth |
||||
Drivers of Change | Governance and capacity development Knowledge solutions |
||||
Sector / Subsector | Energy / Energy sector development and institutional reform |
||||
Gender Equity and Mainstreaming | |||||
Description | This proposed TA Cluster subproject which would be in the nature of capacity development technical assistance (CDTA) would update the electricity demand forecast and develop a power system master plan for Assam power sector. The master plan will also consider the transmission capacity requirement of the neighboring states in NER. This will be the basis of the investment program for the MFF for Assam power proposed for 2014, and thus facilitate the completion of design, cost estimates and due diligence for project processing. | ||||
Project Rationale and Linkage to Country/Regional Strategy | After 2008, no systematic and comprehensive load forecast and power system master plans have been undertaken in Assam. A comprehensive load forecast and power system master plan to provide a blueprint for development of the power system in Assam is required. The proposed master plan will coordinate the generation, transmission and distribution expansions, and ensure that all proposed capital investments are not ad hoc but are a part of the long-term structured plan that will serve the requirements not only of Assam but also its neighboring states. | ||||
Impact | Adequate and reliable power supply in Assam |
Project Outcome | |
---|---|
Description of Outcome | Improved capacity of Assam for investment planning in the power sector. |
Progress Toward Outcome | Updating the load forecast along with the Generation, Transmission and Distribution System Study and Training including a detailed study until 2016-17 and general projection of load growth and its management up to 2020 and has been extended up to 2021-22 coinciding with the end of 13th five year plan submitted by PRDC and presented to GOA. |
Implementation Progress | |
Description of Project Outputs | Electricity demand for Assam up to 2020 forecasted Power System Development Master Plan (including Generation, Transmission and Distribution) for Assam up to 2020 formulated. Power system inventories database for Assam prepared Capacity of power sector agencies in demand forecasting and investment planning developed |
Status of Implementation Progress (Outputs, Activities, and Issues) | The consultant, M/S Power Research and Development consultants India (PRDC) has made a presentation of Interim Report on 10 Jul 2013. All senior officials from AEGCL, APDCL, and APGCL including ADB Mission attended the presentation. PRDC has highlighted the bottlenecks in the existing transmission and distribution system of Assam. PRDC's preliminary study reported that the losses in 33kV network are as high as 8% in all zones. For the demand forecasts, it was agreed to adopt the Aggressive Scenario for planning purposes (aggressive scenario will reflect low and suppress demand). PRDC indicated, additional generation of around 3,500 MW will be required to meet Assam's projected demand of 5,840 MW by 2021-22. Final report submitted by PRDC and services were completed on 31 Dec 2013. |
Geographical Location |
Summary of Environmental and Social Aspects | |
---|---|
Environmental Aspects | |
Involuntary Resettlement | |
Indigenous Peoples | |
Stakeholder Communication, Participation, and Consultation | |
During Project Design | Consultation was made with ASEB and Government of Assam. |
During Project Implementation | A task force will be established headed by the Director, Project Management Unit (PMU) ASEB including one member each from Assam Power Department, APGCL, AEGCL and APDCL. The task force will meet monthly to oversee the proposed TA Cluster subproject activities. The Team Leader (Consultant) of the proposed TA cluster subproject will act as a member secretary of the task force. |
Responsible ADB Officer | Yusupov, Aziz A. |
Responsible ADB Department | South Asia Department |
Responsible ADB Division | Energy Division, SARD |
Executing Agencies |
Department of Power, Government of Assam Dispur Guwahati 781006 |
Timetable | |
---|---|
Concept Clearance | - |
Fact Finding | - |
MRM | - |
Approval | 03 Aug 2012 |
Last Review Mission | - |
Last PDS Update | 31 Mar 2014 |
TA 8129-IND
Milestones | |||||
---|---|---|---|---|---|
Approval | Signing Date | Effectivity Date | Closing | ||
Original | Revised | Actual | |||
03 Aug 2012 | 29 Jan 2013 | 29 Jan 2013 | 31 Mar 2013 | 31 Mar 2014 | 30 Jun 2014 |
Financing Plan/TA Utilization | Cumulative Disbursements | |||||||
---|---|---|---|---|---|---|---|---|
ADB | Cofinancing | Counterpart | Total | Date | Amount | |||
Gov | Beneficiaries | Project Sponsor | Others | |||||
0.00 | 400,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 400,000.00 | 17 Jun 2022 | 305,353.19 |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
None currently available.
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
None currently available.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
Contracts Awarded
Procurement Plan
None currently available.