Nepal : Detailed Engineering Study for the Upper Seti Hydropower Project

Sovereign Project | 43281-022

Project Name
Detailed Engineering Study for the Upper Seti Hydropower Project
Project Number
43281-022
Country / Economy
  • Nepal
Project Status
Closed
Project Type / Modality of Assistance
  • Grant
Source of Funding / Amount
Grant 0215-NEP: Detailed Engineering Study for the Upper Seti Hydropower Project
Source Amount
Asian Development Fund US$ 2.50 million
Strategic Agendas
  • Environmentally sustainable growth
  • Inclusive economic growth
Drivers of Change
  • Gender Equity and Mainstreaming
  • Private sector development
Sector / Subsector
  • Energy / Energy sector development and institutional reform

Gender
Some gender elements
Description
Project Rationale and Linkage to Country/Regional Strategy
Impact

Increased generation capacity to sustain inclusive growth

Project Outcome

Description of Outcome

The ensuing physical project for the Upper Seti hydropower development financed and implemented

Progress Toward Outcome

Project completed in Jun 2016.

Implementation Progress

Description of Project Outputs

1) Detailed Engineering Studies (DES):

Design specification for civil works (dam and water ways)

Design specification for facilities (powerhouse and transmission)

Detailed engineering design parameters and drawings

2) Attached PPTA:

Financial and economic assessment

Institutional arrangements

Environment and social safeguard assessment and feasible planning for implementation

Sector assessment

Tender documents

Status of Implementation Progress (Outputs, Activities, and Issues)
Detailed engineering design (for civil, electrical and mechanical works) and additional studies completed.
Geographical Location
Nation-wide, Madi River

Safeguard Categories

Environment
C
Involuntary Resettlement
C
Indigenous Peoples
C

Summary of Environmental and Social Aspects

Environmental Aspects
Involuntary Resettlement
Indigenous Peoples

Stakeholder Communication, Participation, and Consultation

During Project Design
During Project Implementation

Business Opportunities

Consulting Services
The consultant team of the Detailed Engineering Study will consist of the following experts: Civil Design Engineer (Head Works) (international, 5.0 person-months; national, 7.0 person-months), Civil Design Engineer (Waterway and Powerhouse) (international, 3.5 person-months; national, 6.0 person-months), Hydraulic Model Test Expert (international, 2.5 person-months), Geologist (international, 3.0 person-months), Rock Mechanical Expert (international, 4.0 person-months), Hydromechanical Engineer (international, 3.0 person-months; national, 3.0 person-months), Electromechanical Engineer (international, 3.0 person-months), and Transmission and Electrical Engineer (international, 2.0 person-months; national, 3.0 person-months).

Contact

Responsible ADB Officer
Shiihara, Takeshi
Responsible ADB Department
South Asia Department
Responsible ADB Division
Energy Division, SARD
Executing Agencies
Nepal Electricity Authority
Tanahu Hydropower Limited

Timetable

Concept Clearance
15 Mar 2010
Fact Finding
23 Feb 2010 to 04 Mar 2010
MRM
30 Apr 2010
Approval
02 Sep 2010
Last Review Mission
-
PDS Creation Date
14 Apr 2010
Last PDS Update
13 Sep 2016

Funding

Grant 0215-NEP

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
02 Sep 2010 23 Dec 2010 23 Mar 2011 31 Mar 2013 30 Jun 2016 19 Jan 2017
Financing Plan
  Total (Amount in US$ million)
Project Cost 3.00
ADB 2.50
Counterpart 0.50
Cofinancing 0.00
Grant Utilization
  Date ADB Others Net Percentage
Cumulative Contract Awards 17 Jun 2022 2.50 0.00 100%
Cumulative Disbursements 17 Jun 2022 2.50 0.00 100%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating - Partly satisfactory Satisfactory Satisfactory - Satisfactory

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.


Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

None currently available.


Evaluation Documents See also: Independent Evaluation

None currently available.


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

No tenders for this project were found.

Contracts Awarded

No contracts awarded for this project were found

Procurement Plan

Title Document Type Document Date
Detailed Engineering Study for the Upper Seti Hydropower Project: Procurement Plan Procurement Plans Jul 2010