Indonesia: Support for Accelerating Infrastructure Delivery Through Better Engineering Services Project

Sovereign (Public) Project | 46380-026 Status: Proposed

The subproject will enable smooth and timely implementation of the ESP by providing significant resourcing, capacity building, information technology equipment and project management tools to the PCO. With coordination with PCO, the subproject will also support other technical assistance and activities identified by PMOs and PIUs, which are not covered under the ESP, such as sector specific oversight experts (e.g. sewerage, dam, value engineering), and capacity building for new engineering technology (e.g. value engineering road program, new sewerage treatment plan, long-segment road preservation, sustainable water resources management).

Project Details

Project Officer
Qari, Amr J. Southeast Asia Department Request for information
Country
  • Indonesia
Sector
  • Public sector management

Related Projects

 
Project Name Support for Accelerating Infrastructure Delivery Through Better Engineering Services Project
Project Number 46380-026
Country Indonesia
Project Status Proposed
Project Type / Modality of Assistance Technical Assistance
Source of Funding / Amount
Strategic Agendas Inclusive economic growth
Drivers of Change Governance and capacity development
Knowledge solutions
Partnerships
Sector / Subsector

Public sector management / Public administration

Gender Equity and Mainstreaming No gender elements
Description The subproject will enable smooth and timely implementation of the ESP by providing significant resourcing, capacity building, information technology equipment and project management tools to the PCO. With coordination with PCO, the subproject will also support other technical assistance and activities identified by PMOs and PIUs, which are not covered under the ESP, such as sector specific oversight experts (e.g. sewerage, dam, value engineering), and capacity building for new engineering technology (e.g. value engineering road program, new sewerage treatment plan, long-segment road preservation, sustainable water resources management).
Project Rationale and Linkage to Country/Regional Strategy The subproject is consistent with the Indonesia Country Partnership Strategy 2016-2019 priority of improved infrastructure service, through the ESP. The proposed subproject will support the SGO and PCO to (i) strengthen the ESP implementation arrangements by coordinating, analyzing, presenting, monitoring, reporting, facilitating, and capacity building; and (ii) supporting the project management offices (PMOs) and project implementation units (PIUs) in each DG in preparing and implementing the IDC panel arrangements, while ensuring overall compliance with ADB's Guidelines on the Use of Consultants and other fiduciary arrangements detailed in the Project Administration Manual (PAM).
Impact

(i) improving the quality and timely start-up of infrastructure projects

(ii) strengthening the MPWH's public investment management systems

Outcome The quality and timeliness of the delivery of those priority projects improved.
Outputs Co-ordination and monitoring by the PCO for accelerating infrastructure delivery enhanced
Geographical Location
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation
Business Opportunities
Consulting Services ADB will select all consultants in accordance with ADB's Procurement Policy (2017, as amended from time to time) and the associated PAIs/TA Staff Instructions
Procurement Small amount of IT equipment to be procured following ADB's Procurement Policy (2017, as amended from time to time) and the associated PAIs/TA Staff Instructions.
Responsible ADB Officer Qari, Amr J.
Responsible ADB Department Southeast Asia Department
Responsible ADB Division Indonesia Resident Mission
Executing Agencies
Ministry of Public Works
Jalan Pattimura No. 20
Kebayoran Baru, Jakarta Selatan
Indonesia
National Development Planning Agency (BAPPENAS)
Jl. Taman Suropati No. 2
Jakarta 10310
Indonesia
Timetable
Concept Clearance -
Fact Finding 15 Jul 2016 to 15 Jul 2016
MRM -
Approval -
Last Review Mission -
Last PDS Update 31 Aug 2018

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

None currently available.

Safeguard Documents See also: Safeguards

Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

None currently available.

Evaluation Documents See also: Independent Evaluation

None currently available.

Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

No tenders for this project were found.

Contracts Awarded

No contracts awarded for this project were found

Procurement Plan

None currently available.