Regional : Second Greater Mekong Subregion Corridor Towns Development Project
The proposed project preparatory technical assistance (TA) is required to establish the basis for the proposed investments and capacity building activities for the proposed project. Many corridor towns in the Greater Mekong Subregion (GMS) are finding that their existing infrastructure and public services cannot already cope with the increasing demands of the growing local population and development needs of emerging economic activities. As a result, these towns face severe environmental problems due to capacity constraints in providing adequate potable water supply, sanitation, drainage and flood control, and solid waste management services. This is further aggravated with the absence of land use planning and management regulatory frameworks causing haphazard development.
Project Details
-
Project Officer
Kamal, Sameer A.
Southeast Asia Department
Request for information -
Country/Economy
Regional -
Modality
-
Sector
- Water and other urban infrastructure and services
Project Name | Second Greater Mekong Subregion Corridor Towns Development Project | ||||||||
Project Number | 46443-001 | ||||||||
Country / Economy | Regional |
||||||||
Project Status | Closed | ||||||||
Project Type / Modality of Assistance | Technical Assistance |
||||||||
Source of Funding / Amount |
|
||||||||
Strategic Agendas | Environmentally sustainable growth Inclusive economic growth Regional integration |
||||||||
Drivers of Change | Governance and capacity development |
||||||||
Sector / Subsector | Water and other urban infrastructure and services / Other urban services - Urban policy, institutional and capacity development - Urban solid waste management |
||||||||
Gender | |||||||||
Description | The proposed project preparatory technical assistance (TA) is required to establish the basis for the proposed investments and capacity building activities for the proposed project. Many corridor towns in the Greater Mekong Subregion (GMS) are finding that their existing infrastructure and public services cannot already cope with the increasing demands of the growing local population and development needs of emerging economic activities. As a result, these towns face severe environmental problems due to capacity constraints in providing adequate potable water supply, sanitation, drainage and flood control, and solid waste management services. This is further aggravated with the absence of land use planning and management regulatory frameworks causing haphazard development. As traffic and trade movement increases along the GMS corridors with the improved infrastructure linkages, there is therefore an urgent need to develop and/or upgrade public services in the small and medium towns along the corridors, and strengthen the capacities of these towns to manage future development in an environmentally and socially sustainable manner. |
||||||||
Project Rationale and Linkage to Country/Regional Strategy | The proposed Second Greater Mekong Subregion (GMS) Corridor Towns Development Project (the Project) represents a new phase of the ongoing GMS corridor towns development initiative. This Project will be implemented in six to seven towns in Cambodia, Lao PDR, and Viet Nam during 2016 to 2020, including activities for institutional capacity building on the management of public investments, livelihood support, and developing climate resilience for small and medium towns. The participating GMS countries have requested expanded support for additional strategic towns (i.e. border towns, towns with special growth prospects like export processing zones and tourism) to strengthen regional integration. The focus on corridor town development is a development approach that will maximize the economic benefits of increased trade and traffic flows along the major transport corridors in the GMS with the expected positive impacts resulting from accelerated investments in strategically located towns and cities, and added value on economic growth through development oriented on green growth and climate resilience. The objective is to strengthen competitiveness of the GMS economic corridors through (i) environmental infrastructure (for instance water supply; waste water treatment; waste management; flood control; or urban roads); (ii) more efficient trade facilities (markets); and (iii) supply chain logistics services (for instance dry ports) in strategically located towns. | ||||||||
Impact |
Project Outcome | |
---|---|
Description of Outcome | |
Progress Toward Outcome | |
Implementation Progress | |
Description of Project Outputs | |
Status of Implementation Progress (Outputs, Activities, and Issues) | |
Geographical Location | Regional |
Summary of Environmental and Social Aspects | |
---|---|
Environmental Aspects | |
Involuntary Resettlement | |
Indigenous Peoples | |
Stakeholder Communication, Participation, and Consultation | |
During Project Design | |
During Project Implementation |
Business Opportunities | |
---|---|
Consulting Services | To be determined. |
Responsible ADB Officer | Kamal, Sameer A. |
Responsible ADB Department | Southeast Asia Department |
Responsible ADB Division | Urban Development and Water Division, SERD |
Executing Agencies |
Bac Giang Provincial People's Committee Ministry of Public Works and Transport |
Timetable | |
---|---|
Concept Clearance | - |
Fact Finding | - |
MRM | - |
Approval | 13 Aug 2013 |
Last Review Mission | - |
Last PDS Update | 27 Mar 2013 |
TA 8425-REG
Milestones | |||||
---|---|---|---|---|---|
Approval | Signing Date | Effectivity Date | Closing | ||
Original | Revised | Actual | |||
13 Aug 2013 | 16 Jan 2014 | 16 Jan 2014 | 30 Jun 2016 | 30 Jun 2017 | 02 Nov 2017 |
Financing Plan/TA Utilization | Cumulative Disbursements | |||||||
---|---|---|---|---|---|---|---|---|
ADB | Cofinancing | Counterpart | Total | Date | Amount | |||
Gov | Beneficiaries | Project Sponsor | Others | |||||
1,500,000.00 | 885,000.00 | 300,000.00 | 0.00 | 0.00 | 0.00 | 2,685,000.00 | 17 Jun 2022 | 2,291,390.24 |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Title | Document Type | Document Date |
---|---|---|
Second Greater Mekong Subregion Corridor Towns Development Project: Final Consultant's Report (Viet Nam) | Consultants' Reports | Aug 2016 |
Second Greater Mekong Subregion Corridor Towns Development Project: Final Consultant's Report (Cambodia) | Consultants' Reports | Aug 2016 |
Second Greater Mekong Subregion Corridor Towns Development Project: Final Consultant's Report (Lao PDR) | Consultants' Reports | Aug 2016 |
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
Tender Title | Type | Status | Posting Date | Deadline |
---|---|---|---|---|
National Social Safeguards Specialist | Individual - Consulting | Closed | ||
1. International Resettlement and Compensation Specialist | Individual - Consulting | Closed |
Contracts Awarded
Contract Title | Approval Number | Contract Date | Contractor | Address | Executing Agency | Total Contract Amount (US$) | Contract Amount Financed by ADB (US$) |
---|---|---|---|---|---|---|
Project Preparatory | Technical Assistance 8425 | 07 Jun 2016 | International Centre for Environmental Management (Australia) in association with ICEM Asia Limited (Hong Kong, China) | 70 Blackstone Street Indooroopilly, Brisbane Queensland 4068 Australia | Ministry of Public Works and Transport | 379,476.00 | — |
Procurement Plan
None currently available.