China, People's Republic of : Henan Hebi Qihe River Environmental Improvement and Ecological Conservation Project
The Hebi city government (HCG) has been making various efforts on environmental improvement and ecological conservation in the Qihe River basin, including afforestation, WWTP construction and solid waste management. To address the issues described above, the HCG prepared various plans, including Master Plan for Hebi City Qihe River Ecological Areas for 20102020 and Hebi City Urban Flood and Waterlogging Control Plan for 20112020. The HCG requested the Asian Development Bank (ADB) to provide lending support to implement environmental improvement and ecological conservation in and around Qihe River by integrating key activities in the above-mentioned plans in a consistent manner and to support the city's effort in implementation of this pilot initiative on ecological civilization.
Project Details
-
Project Officer
Kobayashi, Yoshiaki
Sectors Group
Request for information -
Country/Economy
China, People's Republic of -
Modality
-
Sector
- Agriculture, natural resources and rural development
- Project Name
- Henan Hebi Qihe River Environmental Improvement and Ecological Conservation Project
- Project Number
- 47069-002
- Country / Economy
- China, People's Republic of
- Project Status
- Active
- Project Type / Modality of Assistance
- Loan
- Source of Funding / Amount
Loan 3401-PRC: Henan Hebi Qihe River Environmental Improvement and Ecological Conservation Project Source Amount Ordinary capital resources US$ 150.00 million - Strategic Agendas
- Environmentally sustainable growth
- Inclusive economic growth
- Drivers of Change
- Gender Equity and Mainstreaming
- Knowledge solutions
- Private sector development
- Sector / Subsector
Agriculture, natural resources and rural development / Rural flood protection - Water-based natural resources management
Water and other urban infrastructure and services / Urban flood protection - Urban sewerage
- Gender
- Effective gender mainstreaming
- Description
The Hebi city government (HCG) has been making various efforts on environmental improvement and ecological conservation in the Qihe River basin, including afforestation, WWTP construction and solid waste management. To address the issues described above, the HCG prepared various plans, including Master Plan for Hebi City Qihe River Ecological Areas for 20102020 and Hebi City Urban Flood and Waterlogging Control Plan for 20112020. The HCG requested the Asian Development Bank (ADB) to provide lending support to implement environmental improvement and ecological conservation in and around Qihe River by integrating key activities in the above-mentioned plans in a consistent manner and to support the city's effort in implementation of this pilot initiative on ecological civilization.
The project contributes to the PRC Government's goal of building a harmonious and prosperous society through environmentally sustainable growth and priorities of its upcoming Thirteenth Five-Year Plan. The decision of the Third Plenary Session of the 18th Central Committee of the Communist Party of the PRC which supports eco-civilization and establishment of a system to protect ecosystems. It also supports ADB's strategic priorities of the Midterm Review of Strategy 2020 and the Water Operational Plan, 20112020 to increase coverage and improved services for sanitation, and promote integrated water resources and river basin management.
The project design has incorporated lessons from other initiatives including previous ADB-financed projects and policy-oriented studies on IWRM, environmental and ecosystem improvement, wetland and lake management and restoration, and urbanrural integration in the PRC. Major lessons include the need for: (i) an integrated approach including structural and nonstructural measures, (ii) community participation and increased public awareness, (iii) coordinated management of urban-rural planning, (iv) leadership and governance in environmental management, and (v) management and data information systems for IWRM decision making.- Project Rationale and Linkage to Country/Regional Strategy
Rapid economic development in the PRC, has led to severe degradation of ecosystems and the decline of their fundamental services to human well-being. Deforestation and overgrazing in the watersheds, combined with point and non-point source pollution, have led to increased runoff, higher peak flows, downstream flooding, and poor water quality in many regions. This has resulted in loss of life and property and has required costly investments for large-scale water management infrastructure and reinforcement of river embankments.
The highest environmental agenda of the PRC at present is to attain ecological civilization', by increasing investments in restoration of ecosystems and environmental management. Located in the north of Henan Province, Hebi City has a total population of 1.6 million and encompasses 83 kilometers (km), 52% of the entire Qihe River. Originating from Shanxi Province, the Qihe River flows into the Weihe River and then Hai Rivers and finally into the Bohai Sea. The Qihe River basin in Hebi City has been selected as a national pilot project for achieving 'Water Ecological Civilization . Ecosystem degradation, poor flood management capacity, pollution, and weak inter-sectoral coordination are the key issues affecting the ecological integrity of the Qihe River basin that this project will address in an integrated manner.
Environmental conditions along the river have deteriorated due to intensive economic development and increasing human populations whilst vegetation, wetlands, and water quality along the Qihe River have declined due to urbanization, modification of the river hydrology, habitat loss and deforestation, livestock grazing, agriculture, over-extraction of water, and non-point source pollution. The pilot Qihe River National Wetland Park (NWP) in the upper reaches requires habitat restoration and improved facilities and management.
In the lower Qihe River, current flood management practices result in water logging and flooding in selected rural areas due to diversion of water for emergency storage of flows that exceed the dyke crests levels. In addition, due to poor conditions of the old embankments and dykes from erosion and washout, the vulnerability of these sections to potential dyke failure, catastrophic flooding and crop damage are high. The flood management capacity of selected tributaries and canals of the Qihe River in Qi County and Qibin District are also limited to less than 1-in-5 year flood, due to heavy siltation, congestion with solid waste, and degraded banks.
Surface water quality of the Qihe River mainstream and canals are highly polluted and exceeded Class III and Class V, respectively. Inadequate facilities for wastewater management have resulted in poor water quality as the three existing wastewater treatment plants (WWTP) that serve the project areas of Qibin District and Qi County cannot accommodate the increasing volumes of wastewater. The city sewage network currently covers 60% of the area in Qibin District and Qi County. As a result, untreated wastewater discharges directly to the lower Qihe River mainstream and tributaries. The lack of waste transfer stations has resulted in poor solid waste management.
Numerous agencies are involved in management of Qihe River, yet there has been relatively limited inter-sectoral coordination for integrated water resources management (IWRM), due to lack of mechanisms for information sharing and monitoring capacity. The project has already resulted in the strengthened institutional arrangements, through the establishment of a multi-sectoral project management office (PMO). Continued capacity building will be essential to supporting IWRM, including a management information system, and ecological monitoring program, to guide decision making among the agencies for flood management, conservation, and other attributes.- Impact
Ecosystem services in the Qihe River basin restored
Project Outcome
- Description of Outcome
Integrated environmental management in the Qihe River basin in Hebi city demonstrated
- Progress Toward Outcome
- Based on Jul-Dec 2022 progress report, 438,000 total population in Hebi City benefitted from improved sewage system and received 34% public satisfaction with water management and environmental management in Hebi City.
Implementation Progress
- Description of Project Outputs
Vegetation and wetlands in the Qihe River basin restored
Flood management capacity of the lower Qihe River improved
Wastewater and solid-waste management in the Qihe River basin enhanced
Institutional and technical support system and capacity for integrated management of the Qihe River basin strengthened
- Status of Implementation Progress (Outputs, Activities, and Issues)
- Based on Jul-Dec 2022 progress report, (i) for Output 1, (a) about 646.4 ha of degraded hills in the upper Qihe River watershed were reforested, (b) completed restoration of about 186.7 ha of wetland vegetation in the pilot Qihe River NWP, and (c) achieved about 730 restoration-related local jobs during construction (at least 292 for women) and 90 local jobs during operation (at least 36% for women) created; (ii) for Output 2, completed flood management capacity of a combined 30 km of canals in Qi county and Qibin district and about 11.5 km of riverside revegetation in Qi county and about 11.3 km in Qibin district. For canal rehabilitation, 1,650 local jobs created of which at least 53% are for women. For Output 3, completed are (a) expansion works of Qi County WWTP to 60,000 m3/day, (b) about 15 domestic solid-waste transfer stations in Qi County, and (c) Solid-waste management works and equipment in 33 rural villages. Output 4 achievements are 28 community environmental monitoring teams mobilized and functioning with clear job descriptions from 2017 to support domestic solid-waste management along the Qihe River and its tributaries and all staff of PMO and implementation agencies were trained on safeguard policy and gender mainstreaming of which 55% are women.
- Geographical Location
- Nation-wide
Safeguard Categories
- Environment
- B
- Involuntary Resettlement
- A
- Indigenous Peoples
- C
Summary of Environmental and Social Aspects
- Environmental Aspects
- Involuntary Resettlement
- Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
- During Project Design
- During Project Implementation
Business Opportunities
- Consulting Services
- All consulting services will be engaged in accordance with ADB's Guidelines on the Use of Consultants (2013, as amended from time to time).
- Procurement
- All ADB-financed procurement will be conducted following ADB's Procurement Guidelines (2015, as amended from time to time).
Contact
- Responsible ADB Officer
- Kobayashi, Yoshiaki
- Responsible ADB Department
- Sectors Group
- Responsible ADB Division
- Agriculture, Food, Nature, and Rural Development Sector Office (SG-AFNR)
- Executing Agencies
-
Hebi City Government
Timetable
- Concept Clearance
- 20 Oct 2014
- Fact Finding
- 27 Jul 2015 to 04 Aug 2015
- MRM
- 15 Oct 2015
- Approval
- 29 Jun 2016
- Last Review Mission
- -
- Last PDS Update
- 28 Sep 2023
Funding
Loan 3401-PRC
Approval | Signing Date | Effectivity Date | Closing | ||
---|---|---|---|---|---|
Original | Revised | Actual | |||
29 Jun 2016 | 14 Dec 2016 | 13 Mar 2017 | 30 Jun 2022 | 31 May 2025 | - |
Total (Amount in US$ million) | |
---|---|
Project Cost | 325.40 |
ADB | 150.00 |
Counterpart | 175.40 |
Cofinancing | 0.00 |
Date | ADB | Others | Net Percentage | |
---|---|---|---|---|
Cumulative Contract Awards | 18 Jul 2024 | 59.01 | 0.00 | 39% |
Cumulative Disbursements | 18 Jul 2024 | 73.10 | 0.00 | 49% |
Category | Sector | Safeguards | Social | Financial | Economic | Others |
---|---|---|---|---|---|---|
Rating | Satisfactory | Satisfactory | Satisfactory | Satisfactory | Satisfactory | Satisfactory |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
ADB Loan To Help Revive Ecosystems, Curb Flooding In Qihe River Basin
ADB has approved a $150 million dollar loan for a comprehensive project to restore degraded ecosystems and improve water resource management in the flood-prone and polluted Qihe River Basin, which includes Hebi City.
Tenders
Tender Title | Type | Status | Posting Date | Deadline |
---|---|---|---|---|
Qihe River Basin Pilot Section 3D Modeling System Design and Development | Firm - Consulting | Closed | ||
Qihe River Ecological Monitoring | Individual - Consulting | Closed | ||
Wetland Ecological Expert | Individual - Consulting | Closed | ||
Wetland Ecological Expert | Individual - Consulting | Closed | ||
Qihe River Ecological Monitoring Expert | Individual - Consulting | Closed | ||
Independent External Resettlement Monitoring | Firm - Consulting | Closed |
Contracts Awarded
Contract Title | Approval Number | Contract Date | Contractor | Address | Executing Agency | Total Contract Amount (US$) | Contract Amount Financed by ADB (US$) |
---|---|---|---|---|---|---|
HUAIHE ROAD, THREE GORGES ROAD, QINLING ROAD, YAOS HAN ROAD, 4 ROADS CONSTRUCTION PROJECT | Loan 3401 | 14 May 2021 | CHONGQING CONSTRUCTION ENGINEERING NO. 1 MUNI | 17 RENHE ST, YUZHONG DISTRICT CHONGQING CHINA, PEOPLE'S REP. OF | Hebi City Government | 8,431,496.99 | 8,431,496.99 |
VEGETATION RESTORATION IN PANSHITOU RESERVOIR AREA | Loan 3401 | 12 Mar 2021 | HE'NAN RUN'AN CONSTRUCTION GROUP CO., LTD. | HENAN CHINA,PEOPLE'SREP.OF | Hebi City Government | 2,303,539.98 | 2,291,986.17 |
FOUNDATION WORKS OF PANSHITOU RESERVOIR | Loan 3401 | 12 Mar 2021 | LUSHUI PROJECT BUREAU OF YANGTZE RIVER WATER | HENAN CHINA,PEOPLE'SREP.OF | Hebi City Government | 3,978,075.83 | 3,923,266.65 |
SLOPE ECOLOGICAL RESTORATION IN PANSHITOU RESERVOIR AREA | Loan 3401 | 19 Jan 2021 | HENAN SHUIJIAN GRP CO LTD & HENAN HUAMEI ECO | HENAN CHINA,PEOPLE'SREP.OF | Hebi City Government | 2,884,986.36 | 2,884,986.36 |
QIHE RIVER BASIN PILOT SECTION 3D MODELING SYSTEM DESIGN AND DEVELOPMENT | Loan 3401 | 29 Dec 2020 | HENAN CHUITIAN TECHNOLOGY CO,. LTD. | RM. 306 BLDG. 2, EAST XIANGJIANG RD. QIBIN DISTRICT, HEBI CITY, HENAN CHINA,PEOPLE'SREP.OF | Hebi City Government | 543,000.00 | 543,000.00 |
YONGTONG ROAD (JIUZHOU-XIANGJIANG ROAD), JIUZHOU R OAD (YONGTONG-QINLING ROAD), HUANGHE ROAD (YONGTON G-QINLING ROAD) 3 ROADS CONSTRUCTION | Loan 3401 | 14 Dec 2020 | WEILE CONSTRUCTION GROUP CO., LTD. | LULIN BIG ROTARY TABLE, LULIN STREET GUANGFENG DISTRICT, SHANGRAO CITY, CHINA,PEOPLE'SREP.OF | Hebi City Government | 8,433,753.87 | 8,433,753.87 |
HUAXI ROAD (YONGTONG-QINLING ROAD), WUYI ROAD (JIU ZHOU-XIANGJIANG ROAD), TIANLAI AVENUE (JIUZHOU-XIA NGJIANG ROAD) 3 ROADS CONSTRUCTION | Loan 3401 | 14 Dec 2020 | CHONGQING CONS ENG NO.1 MUN ENG CO., LTD | HENAN CHINA,PEOPLE'SREP.OF | Hebi City Government | 13,409,315.53 | 13,409,315.53 |
XIUSHUI ROAD, TONGBAI ROAD, JIUJIANG ROAD,3 ROADS CONSTRUCTION, XIANGJIANG EAST ROAD (YONGTONG-YAOSH AN ROAD) SEWAGE CONSTRUCTION PROJECT | Loan 3401 | 14 Dec 2020 | JIANGXI HONGYI CONS ENG GRP CO. LTD. | LIJING HUATING, DIANHU RD, XINZHOU DIST SHANGRAO CITY, JIANGXI PROVINCE CHINA,PEOPLE'SREP.OF | Hebi City Government | 6,098,739.81 | 6,098,739.81 |
COMMUNITY PARTICIPATION ENVIRONMENTAL MANAGEMENT MECHANISM | Loan 3401 | 14 May 2020 | VARIOUS | VARIOUS CHINA,PEOPLE'SREP.OF | Hebi City Government | 287,282.16 | 286,918.07 |
QM-CW-03: RIVERBANK STABILITY REINFORCEMENT FOR 3 LOCATIONS AND 7 KM DYKE CREST ROAD CONSTRUCTION (Q I COUNTY SECTION: 7 500 - 14 500) | Loan 3401 | 27 Aug 2019 | SICHUAN XINYUAN CONSTRUCTION GROUP CO., LTD | CHINA CHINA,PEOPLE'SREP.OF | Hebi City Government | 3,638,963.11 | 2,226,207.03 |
QM-CW-04: RIVERBANK STABILITY REINFORCEMENT OF 3 L OCATIONS AND 7.5 KM DYKE CREST ROAD CONSTRUCTION ( QI COUNTY SECTION: 0 000 - 7 500) | Loan 3401 | 27 Aug 2019 | HENAN JI'AN CONSTRUCTION GROUP CO., LTD. | CHINA CHINA,PEOPLE'SREP.OF | Hebi City Government | 3,529,538.09 | 2,159,264.13 |
QM-CW-02: RIVERBANK STABILITY REINFORCEMENT FOR 3 LOCATIONS AND 4.318 KM DYKE CREST ROAD CONSTRUCTIO N (QI COUNTY SECTION: 14 500 - 18 818) | Loan 3401 | 29 Aug 2019 | KAITIAN CONSTRUCTION DEVELOPMENT GROUP CO., L | PRC CHINA,PEOPLE'SREP.OF | Hebi City Government | 1,698,022.31 | 1,048,711.73 |
CS04-01 NATIONAL ECOLOGICAL MONITORING EXPERT (LIU WEI) | Loan 3401 | 06 Nov 2019 | LIU WEI | XINING QINGHAI CHINA,PEOPLE'SREP.OF | Hebi City Government | 173,530.00 | 172,945.11 |
CS04-02 NATIONAL WETLAND ECOLOGICAL EXPERT (LI RUNJIE) | Loan 3401 | 06 Nov 2019 | LI RUNJIE | XINING QINGHAI CHINA,PEOPLE'SREP.OF | Hebi City Government | 129,138.60 | 128,703.34 |
RIVERBANK STABILITY REINFORCEMENT FOR 5 LOCATIONS AND 21 KM DYKE CREST ROAD CONSTRUCTION (XUN COUNTY SECTION) | Loan 3401 | 07 Nov 2018 | SICHUAN DINGHENG CONSTRUCTION ENGINEERING CO. | PRC CHINA,PEOPLE'SREP.OF | Hebi City Government | 3,451,364.00 | 2,137,116.00 |
INDEPENDENT EXTERNAL MONITORING CONSULTING SERVICE S | Loan 3401 | 30 Oct 2018 | NATIONAL RESEARCH CENTER FOR RESETTLEMENT, HO | 1 XIKANG ROAD NANJING CHINA,PEOPLE'SREP.OF | Hebi City Government | 181,397.00 | 181,397.00 |
CONSULTING SERVICES FOR THE PROJECT MANAGEMENT AND CAPACITY DEVELOPMENT | Loan 3401 | 19 Oct 2017 | ESD CHINA LIMITED | 21F, 728 XIZANGZHONG ROAD, SHANGHAI CHINA,PEOPLE'SREP.OF | Hebi City Government | 1,013,721.00 | 1,006,829.00 |
Procurement Plan
Title | Document Type | Document Date |
---|---|---|
Henan Hebi Qihe River Environmental Improvement and Ecological Conservation Project: Procurement Plan | Procurement Plans | May 2024 |