Bangladesh : Rural Infrastructure Maintenance Program (PDA)
The Asian Development Bank is working with Bangladesh to improve rural road rehabilitation and maintenance in selected districts.
Project Details
-
Project Officer
Drieu, Olivier
South Asia Department
Request for information -
Country/Economy
Bangladesh -
Modality
-
Sector
- Transport
| Project Name | Rural Infrastructure Maintenance Program (PDA) | ||||
| Project Number | 47243-003 | ||||
| Country / Economy | Bangladesh |
||||
| Project Status | Closed | ||||
| Project Type / Modality of Assistance | Loan |
||||
| Source of Funding / Amount |
|
||||
| Strategic Agendas | Environmentally sustainable growth Inclusive economic growth |
||||
| Drivers of Change | Gender Equity and Mainstreaming Governance and capacity development Partnerships |
||||
| Sector / Subsector | Transport / Road transport (non-urban) |
||||
| Gender | Effective gender mainstreaming | ||||
| Description | The proposed Rural Infrastructure Maintenance Program (RIMP) will focus on improving rural road rehabilitation and maintenance in selected districts of Bangladesh. The Asian Development Bank (ADB) will contribute to a $1.2 billion rural road and bridge maintenance policy, and the Government of Bangladesh has requested project design advance (PDA) in the form of a loan to support preparatory activities for the RIMP. There has been significant improvement in rural infrastructure in Bangladesh since the 1990s, however, rural connectivity remains weak which impedes physical and economic access. For example, only 40% of the rural population has access to all-weather roads, and around 33% of upazila and union roads and 84% of village roads remain unpaved. Improved economic growth has resulted in a rapid increase in road-based cargo transport in rural areas, which has aggravated poor rural road conditions. Over 40% of the rural road network is in poor condition and needs to be rehabilitated. Rehabilitation and maintenance budgets are insufficient, covering only 35% of needs, which has destabilized rural road networks. Weak construction and maintenance skills, overloading of vehicles, and extreme climate events have contributed to a significant rehabilitation and maintenance backlog. The rural road network, even under present climatic conditions, is seriously damaged during flooding and intense rainfall events. |
||||
| Project Rationale and Linkage to Country/Regional Strategy | The RIMP is consistent with ADB's country partnership strategy, 2011- 2015 for Bangladesh, which emphasizes high-impact results, integrating climate change considerations into sector interventions, and climate-proofing infrastructure. The PDA is also included in the country operations business plan for 2016 -2018. The RIMP is also consistent with the government's strategic agenda. The Seventh Five-Year Plan for FY2016- FY2020 of the Government of Bangladesh emphasizes developing infrastructure, and especially improving the connectivity between lagging and better-off regions. The thrust is on removing infrastructure constraints and vulnerabilities to climate change in poor regions. The RIMP will contribute to the investment program contained in the 2013 rural road and bridge maintenance policy, which has the goal of keeping all rural roads accessible year-round in a sustainable manner. The main thrusts of this policy are: (i) reducing the backlog in road maintenance, (ii) rehabilitating the roads to climate-resilient standard, (iii) improving maintenance skills and institutional capacity, (iv) establishing a comprehensive and reliable inventory of roads, bridges and culverts, (v) establishing a linkage between the inventory and geographical information system spatial database, and (vi) upgrading road and bridge maintenance standards. |
||||
| Impact | Connectivity between lagging and better-off regions improved (Sixth Five-Year Plan, 2011-2015) | ||||
| Project Outcome | |
|---|---|
| Description of Outcome | Mobility of rural residents increased |
| Progress Toward Outcome | The PDA consultant assisted with project proposal preparations for ADB loan processing including financial, economic, and socioeconomic analyses, and environmental and social safeguard requirements. The ensuing project loan will contribute to the outcome statement. |
| Implementation Progress | |
| Description of Project Outputs | 1. Rural road infrastructure rehabilitated and maintained 2. Institutional arrangement for road maintenance strengthened |
| Status of Implementation Progress (Outputs, Activities, and Issues) | The PDA consultant advisory group assisted with project proposal preparations for ADB loan processing including financial, economic, and socioeconomic analyses, and environmental and social safeguard requirements. The ensuing project loan will contribute to the project outputs. |
| Geographical Location | B-baria City, Chandpur, Chittagong, Comilla, Coxs Bazar, Faridpur, Feni, Gopalganj, Laksmipur, Madaripur, Noakhali, Rajbari, Shariatpur District |
| Safeguard Categories | |
|---|---|
| Environment | B |
| Involuntary Resettlement | B |
| Indigenous Peoples | B |
| Summary of Environmental and Social Aspects | |
|---|---|
| Environmental Aspects | The initial environment categorization of the ensuing project in accordance with ADB's Safeguard Policy Statement (2009) is Category B. The PDA will not finance land acquisition, resettlement, or civil works. The PDA's safeguards consultants will confirm this classification. The PDA will undertake an assessment of the country's program safeguard system for managing environmental, involuntary resettlement, and indigenous people's impacts and risks; and prepare a safeguard systems assessment report with adequate consultation with relevant stakeholders. The RIMP safeguard systems assessment will be prepared by focusing on ADB Safeguard Policy Statement (2009) principles that are likely to apply to the program; assessing applicable and relevant laws, regulations, rules, and procedures; and identifying the gaps and providing measures for managing and mitigating the environmental and social safeguards impacts of the project. The PDA will also undertake and prepare environmental and social safeguard assessments for the RIMP. |
| Involuntary Resettlement | The initial resettlement categorization of the ensuing project in accordance with ADB's Safeguard Policy Statement (2009) is Category B. The PDA will not finance land acquisition, resettlement, or civil works. The PDA's safeguards consultants will confirm this classification. The PDA will undertake an assessment of the country's program safeguard system for managing environmental, involuntary resettlement, and indigenous people's impacts and risks; and prepare a safeguard systems assessment report with adequate consultation with relevant stakeholders. The RIMP safeguard systems assessment will be prepared by focusing on ADB Safeguard Policy Statement (2009) principles that are likely to apply to the program; assessing applicable and relevant laws, regulations, rules, and procedures; and identifying the gaps and providing measures for managing and mitigating the environmental and social safeguards impacts of the project. The PDA will also undertake and prepare environmental and social safeguard assessments for the RIMP. |
| Indigenous Peoples | The initial indigenous peoples categorization of the ensuing project in accordance with ADB's Safeguard Policy Statement (2009) is Category B. The PDA will not finance land acquisition, resettlement, or civil works. The PDA's safeguards consultants will confirm this classifications. The PDA will undertake an assessment of the country's program safeguard system for managing environmental, involuntary resettlement, and indigenous people's impacts and risks; and prepare a safeguard systems assessment report with adequate consultation with relevant stakeholders. The RIMP safeguard systems assessment will be prepared by focusing on ADB Safeguard Policy Statement (2009) principles that are likely to apply to the program; assessing applicable and relevant laws, regulations, rules, and procedures; and identifying the gaps and providing measures for managing and mitigating the environmental and social safeguards impacts of the project. The PDA will also undertake and prepare environmental and social safeguard assessments for the RIMP. |
| Stakeholder Communication, Participation, and Consultation | |
| During Project Design | The program will improve the maintenance of the rural roads to climate-resilient specifications with a focus on results. The impact will be connectivity between lagging and better-off regions improved. The outcome will be mobility of rural residents increased. The key outputs are (i) rural road infrastructure rehabilitated and maintained; and (ii) institutional arrangement for road maintenance strengthened. |
| During Project Implementation | The implementation arrangements are described in detail in the PDA project administration manual. |
| Business Opportunities | |
|---|---|
| Consulting Services | An estimated 131 person-months (41 international, 90 national) of consulting services are required to (i) facilitate PDA project management and implementation, and (ii) strengthen the institutional and operational capacity of the executing agency. A consulting firm will be engaged using quality- and cost-based selection method with a quality:cost ratio of 90:10. |
| Procurement | not applicable |
| Responsible ADB Officer | Drieu, Olivier |
| Responsible ADB Department | South Asia Department |
| Responsible ADB Division | Environment, Natural Resources & Agriculture Division, SARD |
| Executing Agencies |
Local Government Engineering Department [email protected] LGED Bhaban (Level 6), Agargaon Sher-e-Bangla Nagar, Dhaka 1207, Bangladesh |
| Timetable | |
|---|---|
| Concept Clearance | - |
| Fact Finding | - |
| MRM | - |
| Approval | 07 Jun 2016 |
| Last Review Mission | - |
| Last PDS Update | 14 Sep 2018 |
Loan 6007-BAN
| Milestones | |||||
|---|---|---|---|---|---|
| Approval | Signing Date | Effectivity Date | Closing | ||
| Original | Revised | Actual | |||
| 07 Jun 2016 | 11 Jul 2016 | 11 Jul 2016 | 01 Mar 2018 | 01 Feb 2019 | 13 Feb 2019 |
| Financing Plan | Loan Utilization | ||||
|---|---|---|---|---|---|
| Total (Amount in US$ million) | Date | ADB | Others | Net Percentage | |
| Project Cost | 2.54 | Cumulative Contract Awards | |||
| ADB | 2.00 | 07 Jun 2016 | 0.00 | 0.00 | 0% |
| Counterpart | 0.54 | Cumulative Disbursements | |||
| Cofinancing | 0.00 | 07 Jun 2016 | 0.00 | 0.00 | 0% |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
| Title | Document Type | Document Date |
|---|---|---|
| Rural Infrastructure Maintenance Program: Project Design Advance | Project Design Advance | Jun 2016 |
| Rural Infrastructure Maintenance Program: Project Administration Manual | Project/Program Administration Manual | Jun 2016 |
| Rural Infrastructure Maintenance Program (Project Design Advance): Audited Project Financial Statements (July 2017-June 2018) | Audited Project Financial Statements | Dec 2018 |
| Rural Infrastructure Maintenance Program (Project Design Advance): Audited Project Financial Statements (1 July 2016-30 June 2017) | Audited Project Financial Statements | Sep 2018 |
| Project Design Advance Loan Agreement (Special Operations) for Loan 6007-BAN: Rural Infrastructure Maintenance Program | Loan Agreement (Special Operations) | Jul 2016 |
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
None currently available.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
Contracts Awarded
Procurement Plan
None currently available.